ST1501A-CS180907 (2)
Priscilla Martinez
From:Marcus Marion
Sent:Monday, September 10, 2018 8:17 AM
To:Priscilla Martinez
Subject:Freeport PKWY - Expose Duct Bank @ Bridge north of Airline Dr on Freeport Pkwy
This is a correspondence for Freeport about exposing the conflict utilities
From: Darryl Zbranek
Sent: Friday, September 7, 2018 11:18 AM
To: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: FW: Expose Duct Bank @ Bridge north of Airline Dr on Freeport Pkwy
FYI
From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>
Sent: Friday, September 7, 2018 11:08 AM
To: Rocky Crockett <rocky.crockett@zayo.com>; FT - Ricky Riggs <ricky@futuretelco.com>
Cc: Darryl Zbranek <dzbranek@coppelltx.gov>; Thomas Capps <tommy.capps@zayo.com>; Jimmy Reed
<Jimmy.Reed@strlco.com>
Subject: RE: Expose Duct Bank @ Bridge north of Airline Dr on Freeport Pkwy
Rocky,
I ran this by my legal department and they shot me down. Texas Sterling will not be able to do this work.
Thanks,
Eric Giebelhaus
Project Manager– North Texas Division
Texas Sterling Construction Co.
| 1441 Airport Freeway Suite 350, Euless, Texas 76040 |
| 469.346.8085 Cell |
From: Rocky Crockett <rocky.crockett@zayo.com>
Sent: Thursday, September 06, 2018 5:46 PM
To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; FT - Ricky Riggs <ricky@futuretelco.com>
Cc: Darryl Zbranek <dzbranek@coppelltx.gov>; Thomas Capps <tommy.capps@zayo.com>
Subject: Expose Duct Bank @ Bridge north of Airline Dr on Freeport Pkwy
1
<<...>>
Erik /Ricky,
This e-mail serves as permission given to Texas Sterling to excavate over the joint Telco duct bank
owned by Zayo/Level 3/Century Link in three areas that drill shafts conflict with existing locations. This
City project involves the replacement of the Bridge across Grapevine Creek located north of Airline Dr
on Freeport Pkwy. See attachment of Bridge Pier work locations.
At each of the three proposed pier locations the minimum depth is approximately 17’ or greater. At
the on-site meeting, Texas Sterling stated they would assist with the excavation in these 3 locations
and remove approximately a 10 foot of cover and 10’ in width over each of the pier locations and
the remaining cover would be removed by Zayo’s contractor.
Future Telecom, Zayo’s contractor has agreed to pay Texas Sterling’s invoice for work as completed,
based on Time and Materials for work they perform in this duct location effort.
Zayo will have an inspector on site during the excavation as a precaution and acceptance of the liability
of work directed on behalf of Zayo.
Ricky,
Please call Eric Giebelhaus and then send him an e-mail, stating, Zayo has authorized Future Telecom to pay
Texas Sterling’s invoice for work as completed, based on Time and Materials.
Listed below are contacts.
Texas Sterling
Eric Giebelhaus
E-mail: Eric.Giebelhaus@strlco.com
Cell: (469) 346-8085
Future Telecom, Inc.
Ricky Riggs
E-mail: ricky@futuretelco.com
Office: (972) 329-6400
2
Cell: (972) 877-9408
City of Coppell
Darryl Zbranek
E-mail: dzbranek@coppelltx.gov
Office: (972) 304-7090
Cell: (469) 507-9095
Rocky Crockett
Project Manager, OSP| Zayo Group
13647 Omega Rd | Farmers Branch, TX 75244
O: 817-665-8415 | C: 469-417-8444
Rocky.Crockett@zayo.com | http://www.zayo.com
Zayo acquires AboveNet
To stop receiving messages from FreeportProjectST1501 group, stop following it.
3