City of Coppell Public Works staff will be performing asphalt repairs on Freeport Parkway on
Wednesday, September 19 and Thursday, September 20. These repairs will help prolong the
life of the roadway during construction.
On Wednesday, September 18, crews will be working on Freeport Parkway between Dividend
and the bridge near X Street. Northbound traffic will be detoured right onto Wrangler, then left to
Enterprise and, lastly, right on Airline. Southbound traffic will be detoured left on Airline, then
right on Enterprise and, lastly, right on Wrangler. A moving work zone with the necessary
flaggers and equipment will be in the remaining roadway section to the south.
On Thursday, September 19, crews will perform the remainder of the repairs from Bethel to the
bridge near X Street. A moving work zone with flaggers, equipment and barricades will be in this
section.
Crews will begin setting up necessary signs and equipment at approximately 2 p.m. each day.
Road and lane closures will begin at approximately 6:30 p.m. each day, depending on traffic
levels.
The City of Coppell will set out message boards on Tuesday September 18 at the intersections
of Bethel Road/Freeport Parkway and Dividend Road/Freeport Parkway to inform drivers of the
upcoming closures and detours.
City of Coppell Public Works staff will be performing asphalt repairs on Freeport Parkway on
Wednesday, September 19 and Thursday, September 20. These repairs will help prolong the
life of the roadway during construction.
On Wednesday, September 18, crews will be working on Freeport Parkway between Dividend
and the bridge near X Street. Northbound traffic will be detoured right onto Wrangler, then left to
Enterprise and, lastly, right on Airline. Southbound traffic will be detoured left on Airline, then
right on Enterprise and, lastly, right on Wrangler. A moving work zone with the necessary
flaggers and equipment will be in the remaining roadway section to the south.
On Thursday, September 19, crews will perform the remainder of the repairs from Bethel to the
bridge near X Street. A moving work zone with flaggers, equipment and barricades will be in this
section.
Crews will begin setting up necessary signs and equipment at approximately 2 p.m. each day.
Road and lane closures will begin at approximately 6:30 p.m. each day, depending on traffic
levels.
The City of Coppell will set out message boards on Tuesday September 18 at the intersections
of Bethel Road/Freeport Parkway and Dividend Road/Freeport Parkway to inform drivers of the