Loading...
ST1501A-CS180919 (2)Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendar1723 -1723 - Freeport380288009-Apr-18 A03-Dec-19A1000Project Start0009-Apr-187 DayA1320Duration530463009-Apr-1803-Dec-197 DayA1530Bridge ROW Issue0009-Apr-1825-Apr-18 7 DayA1600Project Time Charges523463009-Apr-1803-Dec-197 DayA1330Milestone 1190129426-Apr-1803-Jan-197 DayA1670Start Time Charges0026-Apr-187 DayA3550Time Charges Start to Utility Stop1026-Apr-1803-Aug-187 DayA3540Stop Time Charges due to Utility Conflicts0003-Aug-187 DayA1340Milestone 211711716604-Jan-1901-May-197 DayA1350Milestone 31521521303-May-1902-Oct-197 DayA1020Project Finish00003-Dec-197 DayStageStage 199132109-Apr-1827-Aug-185 DayWaterWater9009-Apr-1827-Apr-18 5 DayA165Sawcut for Removals - Water Line & Detour3009-Apr-1811-Apr-18 5 DayA155Water Line 45+80 to 48+256012-Apr-1817-Apr-18 5 DayA138Crossing @ 44+703018-Apr-1818-Apr-18 5 DayA137Crossing @36+164019-Apr-1825-Apr-18 5 DayA136Crossing @ 28+263026-Apr-1827-Apr-18 5 DayTCP STCP Setup Stage 299132112-Apr-1827-Aug-185 DayA166Sawcut for Removals - Bridge Sidewalk1012-Apr-1820-Apr-18 5 DayA105Remove Sidewalk SB5023-Apr-1815-May-185 DayA260Railroad Crossing Arm Delay15026-Apr-1825-Jun-18 5 DayA107Remove Bridge Median1015-May-1815-May-185 DayA109Removals - Detours1016-May-1816-May-185 DayA110Install Stage Detours3016-May-1818-May-185 DayA108Set & Pin PCTB - Demo Edge2021-May-1821-May-185 DayA161Railroad Install Temp Crossing Arms0027-Jun-18 5 DayA106Set PCTB - Center Stripe11327-Aug-1827-Aug-185 DayStormStorm Drain00427-Aug-1827-Aug-185 DayA139Storm Drain Rehab @ 17+2300427-Aug-1827-Aug-185 DayStageStage 2 - NB Dividend to Bethel1458020817-May-1803-Jan-19A1620Switch Traffic to Stage 21021-May-1821-May-185 DayA1630Remove Concrete Pavement & Sidewalk - South of RR8025-May-1813-Jun-18 5 DayA2420Complete Pavement Removal North of RR3026-Jun-1813-Jul-18 A5 DaySanitaSanitary Sewer2017-May-1818-May-185 DayA149Install SS @ 26+56 w/ Temp Connection2017-May-1818-May-185 DayStormStorm Drain5252801-Oct-1813-Dec-185 DayA150Storm Drain Impovements NB13132901-Oct-1817-Oct-185 DayA186Complete Inlet Tops after Paving1818815-Nov-1813-Dec-185 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb2018201920201723 - Freeportroject StartStart Time ChargesStop Time Charges due to Utility ConflictsProject FinishStage 1WaterTCP Setup Stage 2Railroad Install Temp Crossing ArmsSet PCTB - Center StripeStorm DrainStorm Drain Rehab @ 17+23Stage 2 - NB Dividend to BethelSanitary SewerStorm DrainStorm Drain Impovements NBComplete Inlet Tops after Paving1723 - Freeport TEXAS STERLINGCONSTRUCTION CO.Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 1 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarWaterWater Line922529722-May-1802-Oct-185 DayA140Steel Casing 23+81 to 26+1616022-May-1823-May-185 DayA144Install 16" Main in Bore3024-May-1824-May-185 DayA143Install 16" Main 27+13 to 36+168025-May-1806-Jun-18 5 DayA164Install 16" Main 36+16 to 45+807007-Jun-1822-Jun-18 5 DayA142Install 16" Main 19+00 to 23+104026-Jun-1810-Jul-18 A5 DayA303Test Line A5011-Jul-18 A24-Jul-18 A5 DayA169Install 20" Waterline on Southwestern111129716-Jul-18 A27-Sep-185 DayA145Install Hydrants, Crossings, etc 19+00 to45+804024-Jul-18 A21-Aug-185 DayA141Install Hydrants, Crossing, etc Dividend to 19+006022-Aug-1823-Aug-185 DayA147Finish Connecting Services2024-Aug-1827-Aug-185 DayA146Connect to Existing @ 19+08111827-Aug-1827-Aug-185 DayA148Grout Existing Water Line10101828-Aug-1811-Sep-185 DayA170Replace Pavement on Southwestern3329727-Sep-1802-Oct-185 DayBridgeBridge129681324-May-1817-Dec-18A103Demo Existing Bridge5024-May-1815-Jun-18 5 DayA104Grading Proposed Bridge1016-Jun-1818-Jun-18 5 DayA261Drill Sub Mobilization10019-Jun-1820-Jun-18 5 DayA111Drill Shafts4021-Jun-1822-Jun-18 5 DayA156Drill Shaft Utility Conflict1321323-Jun-1828-Sep-187 DayA296Complete Drill Shafts55701-Oct-1805-Oct-185 WkiA118Drill Shaft Cure331606-Oct-1809-Oct-187 DayA112Bent 2 Columns221008-Oct-1809-Oct-185 DayA113Bent 3 Columns221009-Oct-1811-Oct-185 DayA119Bent 2 Column Cure332009-Oct-1812-Oct-187 DayA114Abut 1 Cap221011-Oct-1815-Oct-185 DayA120Bent 3 Column Cure332211-Oct-1814-Oct-187 DayA115Abut 4 Cap221015-Oct-1817-Oct-185 DayA121Abut 1 Cap Cure332615-Oct-1818-Oct-187 DayA116Bent 2 Cap221018-Oct-1822-Oct-185 DayA122Abut 4 Cap Cure332318-Oct-1821-Oct-187 DayA168Install CTB @ Abutments333318-Oct-1823-Oct-185 DayA117Bent 3 Cap221022-Oct-1824-Oct-185 DayA123Bent 2 Cap Cure331922-Oct-1825-Oct-187 DayA124Bent 3 Cap Cure331624-Oct-1827-Oct-187 DayA151Install Riprap Under New Bridge331024-Oct-1829-Oct-185 DayA125Set Beams111030-Oct-1830-Oct-185 DayA126Set Overhang11111031-Oct-1815-Nov-185 DayA127Install Precast Panels & PMD441015-Nov-1821-Nov-185 DayA128Tie Deck Steel221021-Nov-1822-Nov-185 DayA129Pour Deck111022-Nov-1823-Nov-185 DayA130Cure Deck881823-Nov-1801-Dec-187 DayA131Install Ped Rail on Deck w/ Conduit10101303-Dec-1817-Dec-185 DayRoadRoadway10980216-Jul-18 A03-Jan-19A171Balance Subgrade 1+55 to 36+009016-Jul-18 A25-Jul-18 A5 DayA239Balance Subgrade 36+00 to 67+689026-Jul-18 A06-Aug-185 DayA306Spectrum Conflict at 65+00732606-Aug-1828-Sep-187 DayA307Frontier Conflict 45+00 to 67+68732606-Aug-1828-Sep-187 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Water LineInstall 20" Waterline on SouthwesternConnect to Existing @ 19+08Grout Existing Water LineReplace Pavement on SouthwesternBridgeDrill Shaft Utility ConflictComplete Drill ShaftsDrill Shaft CureBent 2 ColumnsBent 3 ColumnsBent 2 Column CureAbut 1 CapBent 3 Column CureAbut 4 CapAbut 1 Cap CureBent 2 CapAbut 4 Cap CureInstall CTB @ AbutmentsBent 3 CapBent 2 Cap CureBent 3 Cap CureInstall Riprap Under New BridgeSet BeamsSet OverhangInstall Precast Panels & PMDTie Deck SteelPour DeckCure DeckInstall Ped Rail on Deck w/ ConduitRoadwaySpectrum Conflict at 65+00Frontier Conflict 45+00 to 67+68Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 2 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarA319Century Link Conflict at 9+13732606-Aug-1828-Sep-187 DayA196Retaining Wall 45+51 to 48+2411114727-Aug-1812-Sep-185 DayA197Retaining Wall 63+82 to 65+15664712-Sep-1819-Sep-185 DayA353Finish Balance Subgrade after Conflict33629-Sep-1801-Oct-187 DayA172Fine Grade Subgrade66402-Oct-1809-Oct-185 DayA1734" HMAC Ty B88409-Oct-1819-Oct-185 DayA174Tie Steel - Paving Pass 155419-Oct-1826-Oct-185 DayA180Paving - Pass 133426-Oct-1831-Oct-185 DayA175Tie Steel - Paving Pass 255431-Oct-1807-Nov-185 DayA187Cure Paving - Pass 1331031-Oct-1803-Nov-187 DayA178Tie Steel - 2nd Half Cross Streets222805-Nov-1807-Nov-185 DayA176Tie Steel - Turn Lanes (13 turn lanes)22707-Nov-1809-Nov-185 DayA181Paving - Pass 233407-Nov-1812-Nov-185 DayA182Pave - Turn Lanes22712-Nov-1813-Nov-185 DayA188Cure Paving - Pass 233412-Nov-1815-Nov-187 DayA189Cure - Turn Lanes33914-Nov-1817-Nov-187 DayA177Tie Steel - 1st Half Cross Streets221319-Nov-1821-Nov-185 DayA195Backfill Pavement33519-Nov-1821-Nov-185 DayA183Pave - 1st Half Cross Streets221321-Nov-1823-Nov-185 DayA198Grade for Sidewalk1212221-Nov-1811-Dec-185 DayA190Cure - 1st Half Intersections332323-Nov-1826-Nov-187 DayA184Pave - 2nd Half Cross Streets221527-Nov-1803-Dec-185 DayA191Cure 2nd Half Intersections332003-Dec-1806-Dec-187 DayA193Install Colored Stamped Concrete551703-Dec-1810-Dec-185 DayA179Tie Steel - Driveways221306-Dec-1810-Dec-185 DayA194Cure Stamped Concrete332510-Dec-1813-Dec-187 DayA185Pave - Driveways331311-Dec-1814-Dec-185 DayA199Pave Sidewalk & Trail88211-Dec-1821-Dec-185 DayA192Cure - Driveways332114-Dec-1817-Dec-187 DayA200Backfill Sidewalk & Trail22221-Dec-1826-Dec-185 DayA201Grass & Landscape Outside55226-Dec-1803-Jan-195 DayRailroRailroad8383727-Aug-1826-Dec-185 DayA157Railroad Installed Ped Crossing Arms NB118827-Aug-1827-Aug-185 DayA158Connect Pavement NB222915-Nov-1819-Nov-185 DayA159Build Sidewalk at RR Crossing NB22721-Dec-1826-Dec-185 DayTraffiTraffic Signals44215-Nov-1821-Nov-185 DayA152Signal Drill Shafts at Southwestern NB22215-Nov-1819-Nov-185 DayA154Install Conduit from NB Corners w/ Pull Boxes22219-Nov-1821-Nov-185 DayStageStage 3A - SB Dividend to Fritz58581503-Jan-1907-Apr-19A3840Switch Traffic to Stage 3A11203-Jan-1904-Jan-195 DayA3890Remove Concrete Pavement22804-Jan-1908-Jan-195 DayWaterWater993408-Jan-1921-Jan-195 DayA228Remove & Replace Existing Hydrants333408-Jan-1911-Jan-195 DayA229Complete Crossing @ 13+60223411-Jan-1915-Jan-195 DayA230Complete Crossing @ 16+05223415-Jan-1917-Jan-195 DayA231Complete Crossing @ 22+68223417-Jan-1921-Jan-195 DayStormStorm Drain4343521-Jan-1921-Mar-195 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Century Link Conflict at 9+13Retaining Wall 45+51 to 48+24Retaining Wall 63+82 to 65+15Finish Balance Subgrade after ConflictFine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Tie Steel - 2nd Half Cross StreetsTie Steel - Turn Lanes (13 turn lanes)Paving - Pass 2Pave - Turn LanesCure Paving - Pass 2Cure - Turn LanesTie Steel - 1st Half Cross StreetsBackfill PavementPave - 1st Half Cross StreetsGrade for SidewalkCure - 1st Half IntersectionsPave - 2nd Half Cross StreetsCure 2nd Half IntersectionsInstall Colored Stamped ConcreteTie Steel - DrivewaysCure Stamped ConcretePave - DrivewaysPave Sidewalk & TrailCure - DrivewaysBackfill Sidewalk & TrailGrass & Landscape OutsideRailroadRailroad Installed Ped Crossing Arms NBConnect Pavement NBBuild Sidewalk at RR Crossing NBTraffic SignalsSignal Drill Shafts at Southwestern NBInstall Conduit from NB Corners w/ Pull BoxesStage 3A - SB Dividend to FritzSwitch Traffic to Stage 3ARemove Concrete PavementWaterRemove & Replace Existing HydrantsComplete Crossing @ 13+60Complete Crossing @ 16+05Complete Crossing @ 22+68Storm DrainRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 3 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarA240Storm Drain Impovements SB663421-Jan-1929-Jan-195 DayA241Complete Inlet Tops after Paving99511-Mar-1921-Mar-195 DaySanitaSanitary Sewer2626208-Jan-1913-Feb-195 DayA236Install SS 32+33 to 23+8988808-Jan-1918-Jan-195 DayA232Drill Shafts for Aerial SS Crossing33211-Jan-1916-Jan-195 DayA233Columns for Aerial SS Crossing33216-Jan-1921-Jan-195 DayA234Caps for Aerial SS Crossing22221-Jan-1922-Jan-195 DayA235Casing for Aerial SS Crossing33222-Jan-1925-Jan-195 DayA237Install SS 23+89 to 17+3988228-Jan-1906-Feb-195 DayA238Rehab Existing SS Manholes55207-Feb-1913-Feb-195 DayBridgeBridge53531904-Jan-1902-Apr-19A203Demo Existing Bridge55204-Jan-1911-Jan-195 DayA204Grading Proposed Bridge112111-Jan-1914-Jan-195 DayA205Drill Shafts552114-Jan-1918-Jan-195 DayA220Drill Shaft Cure333119-Jan-1922-Jan-197 DayA206Bent 2 Columns222121-Jan-1922-Jan-195 DayA207Bent 3 Columns222122-Jan-1924-Jan-195 DayA221Bent 2 Column Cure333422-Jan-1925-Jan-197 DayA208Abut 1 Cap222124-Jan-1928-Jan-195 DayA222Bent 3 Column Cure333724-Jan-1927-Jan-197 DayA209Abut 4 Cap222128-Jan-1930-Jan-195 DayA223Abut 1 Cap Cure334128-Jan-1931-Jan-197 DayA210Bent 2 Cap222131-Jan-1904-Feb-195 DayA224Abut 4 Cap Cure333831-Jan-1903-Feb-197 DayA219Install CTB @ Abutments333931-Jan-1905-Feb-195 DayA211Bent 3 Cap222104-Feb-1906-Feb-195 DayA225Bent 2 Cap Cure333404-Feb-1907-Feb-197 DayA226Bent 3 Cap Cure333206-Feb-1909-Feb-197 DayA218Install Riprap Under New Bridge442106-Feb-1912-Feb-195 DayA212Set Beams112112-Feb-1913-Feb-195 DayA213Set Overhang662113-Feb-1921-Feb-195 DayA214Install Precast Panels & PMD552121-Feb-1928-Feb-195 DayA215Tie Deck Steel222128-Feb-1901-Mar-195 DayA216Pour Deck112101-Mar-1904-Mar-195 DayA227Cure Deck882904-Mar-1912-Mar-197 DayA217Install Ped Rail on Deck w/ Conduit10102112-Mar-1927-Mar-195 DayA202Form & Pour West Sidewalk & Median442127-Mar-1902-Apr-195 DayRoadRoadway5454208-Jan-1907-Apr-19A243Balance Subgrade662308-Jan-1916-Jan-195 DayA244Fine Grade Subgrade22314-Feb-1915-Feb-195 DayA2454" HMAC Ty B33218-Feb-1921-Feb-195 DayA246Tie Steel - Paving Pass 122221-Feb-1922-Feb-195 DayA252Paving - Pass 122225-Feb-1926-Feb-195 DayA247Tie Steel - Paving Pass 222227-Feb-1928-Feb-195 DayA266Cure Paving - Pass 133327-Feb-1902-Mar-197 DayA248Tie Steel - Turn Lanes22228-Feb-1904-Mar-195 DayA253Paving - Pass 222104-Mar-1905-Mar-195 DayA254Pave - Turn Lanes22106-Mar-1907-Mar-195 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Storm Drain Impovements SBComplete Inlet Tops after PavingSanitary SewerInstall SS 32+33 to 23+89Drill Shafts for Aerial SS CrossingColumns for Aerial SS CrossingCaps for Aerial SS CrossingCasing for Aerial SS CrossingInstall SS 23+89 to 17+39Rehab Existing SS ManholesBridgeDemo Existing BridgeGrading Proposed BridgeDrill ShaftsDrill Shaft CureBent 2 ColumnsBent 3 ColumnsBent 2 Column CureAbut 1 CapBent 3 Column CureAbut 4 CapAbut 1 Cap CureBent 2 CapAbut 4 Cap CureInstall CTB @ AbutmentsBent 3 CapBent 2 Cap CureBent 3 Cap CureInstall Riprap Under New BridgeSet BeamsSet OverhangInstall Precast Panels & PMDTie Deck SteelPour DeckCure DeckInstall Ped Rail on Deck w/ ConduitForm & Pour West Sidewalk & MedianRoadwayBalance SubgradeFine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Tie Steel - Turn LanesPaving - Pass 2Pave - Turn LanesRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 4 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarA267Cure Paving - Pass 233906-Mar-1909-Mar-197 DayA268Cure - Turn Lanes33207-Mar-1910-Mar-197 DayA259Backfill Pavement221407-Mar-1911-Mar-195 DayA249Tie Steel - 1st Half Cross Streets11211-Mar-1911-Mar-195 DayA255Pave - 1st Half Cross Streets22212-Mar-1913-Mar-195 DayA269Cure - 1st Half Intersections33314-Mar-1917-Mar-197 DayA250Tie Steel - 2nd Half Cross Streets11218-Mar-1918-Mar-195 DayA251Tie Steel - Driveways221119-Mar-1920-Mar-195 DayA256Pave - 2nd Half Cross Streets22219-Mar-1920-Mar-195 DayA257Pave - Driveways221021-Mar-1922-Mar-195 DayA270Cure 2nd Half Intersections33321-Mar-1924-Mar-197 DayA262Grade for Sidewalk44522-Mar-1927-Mar-195 DayA271Cure - Driveways331622-Mar-1925-Mar-197 DayA258Install Colored Stamped Concrete88225-Mar-1903-Apr-195 DayA263Pave Sidewalk22528-Mar-1929-Mar-195 DayA264Backfill Sidewalk11529-Mar-1901-Apr-195 DayA265Grass & Landscape Outside22501-Apr-1903-Apr-195 DayA272Cure Stamped Concrete33304-Apr-1907-Apr-197 DayLightiLighting22214-Feb-1918-Feb-195 DayA285Install Conduit Between Medians22214-Feb-1918-Feb-195 DayStageStage 3B - Median Dividend to Airline474710308-Apr-1919-Jun-19A3850Switch Traffic to Stage 3B11308-Apr-1908-Apr-195 DayA3900Remove Concrete Pavement11309-Apr-1909-Apr-195 DayRoadRoadway151510410-Apr-1903-May-19A273Balance & Fine Grade Subgrade22310-Apr-1911-Apr-195 DayA2744" HMAC Ty B11311-Apr-1912-Apr-195 DayA275Tie Steel - Paving Pass 122312-Apr-1916-Apr-195 DayA278Pave - Pass 111316-Apr-1917-Apr-195 DayA276Tie Steel - Paving Pass 222317-Apr-1918-Apr-195 DayA281Cure Pass 133317-Apr-1920-Apr-197 DayA279Pave - Pass 211122-Apr-1922-Apr-195 DayA277Tie Steel - Paving Pass 322123-Apr-1924-Apr-195 DayA282Cure Pass 23317123-Apr-1926-Apr-197 DayA280Pave - Pass 311124-Apr-1925-Apr-195 DayA283Cure Pass 333225-Apr-1928-Apr-197 DayA284Colored Stamped Median Pavement2211601-May-1903-May-195 DayLightiLighting66710-Apr-1922-Apr-19A286Install Illumination Drill Shafts (15 ea)22610-Apr-1912-Apr-195 DayA287Complete Conduit22912-Apr-1915-Apr-195 DayA289Cure Illumination Drill Shafts66912-Apr-1917-Apr-197 DayA288Set Illumination & Wiring22718-Apr-1922-Apr-195 DayLandsLandscaping383811625-Apr-1919-Jun-195 DayA290Install Irrigation System4411625-Apr-1901-May-195 DayA291Install Landscape Borders2211603-May-1907-May-195 DayA292Install Landscaping181811607-May-1903-Jun-195 DayA293Install City Monument121211603-Jun-1919-Jun-195 DayStageStage 4A - SB Fritz to Bethel100100729-Apr-1902-Oct-19MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Cure Paving - Pass 2Cure - Turn LanesBackfill PavementTie Steel - 1st Half Cross StreetsPave - 1st Half Cross StreetsCure - 1st Half IntersectionsTie Steel - 2nd Half Cross StreetsTie Steel - DrivewaysPave - 2nd Half Cross StreetsPave - DrivewaysCure 2nd Half IntersectionsGrade for SidewalkCure - DrivewaysInstall Colored Stamped ConcretePave SidewalkBackfill SidewalkGrass & Landscape OutsideCure Stamped ConcreteLightingInstall Conduit Between MediansStage 3B - Median Dividend to AirlineSwitch Traffic to Stage 3BRemove Concrete PavementRoadwayBalance & Fine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Pave - Pass 1Tie Steel - Paving Pass 2Cure Pass 1Pave - Pass 2Tie Steel - Paving Pass 3Cure Pass 2Pave - Pass 3Cure Pass 3Colored Stamped Median PavementLightingInstall Illumination Drill Shafts (15 ea)Complete ConduitCure Illumination Drill ShaftsSet Illumination & WiringLandscapingInstall Irrigation SystemInstall Landscape BordersInstall LandscapingInstall City MonumentStage 4A - SB Fritz to BethelRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 5 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarA3860Switch Traffic to Stage 4A11229-Apr-1929-Apr-195 DayA3910Remove Concrete Pavement88230-Apr-1909-May-195 DaySanitaSanitary Sewer66210-May-1920-May-195 DayA294Install SS @ Southwestern44210-May-1915-May-195 DayA295Complete SS Rehab Work22216-May-1920-May-195 DayStormStorm Drain70701020-May-1927-Aug-195 DayA308Storm Drain Impovements SB88220-May-1930-May-195 DayA309Complete Inlet Tops after Paving12121012-Aug-1927-Aug-195 DayWaterWater Line4141210-May-1910-Jul-195 DayA311Bore Casing Under Railroad (102 LF)1010910-May-1923-May-195 DayA310Complete SB Water Connections 28+26 to 45+8022230-May-1904-Jun-195 DayA312Install 16" Water Main 45+80 to 67+681515204-Jun-1925-Jun-195 DayA314Connect to Existing @ 67+6811225-Jun-1926-Jun-195 DayA313Complete Connections North of 45+8022226-Jun-1901-Jul-195 DayA315Remove/Grout Existing Water Line66201-Jul-1910-Jul-195 DayRoadRoadway9191710-May-1902-Oct-19A320Balance Subgrade10103410-May-1923-May-195 DayA321Fine Grade Subgrade33210-Jul-1915-Jul-195 DayA3224" HMAC Ty B66215-Jul-1923-Jul-195 DayA323Tie Steel - Paving Pass 133223-Jul-1926-Jul-195 DayA329Paving - Pass 133226-Jul-1931-Jul-195 DayA324Tie Steel - Paving Pass 233231-Jul-1905-Aug-195 DayA343Cure Paving - Pass 133431-Jul-1903-Aug-197 DayA325Tie Steel - Turn Lanes (6 turn lanes)22305-Aug-1908-Aug-195 DayA330Paving - Pass 233205-Aug-1908-Aug-195 DayA331Pave - Turn Lanes33208-Aug-1913-Aug-195 DayA344Cure Paving - Pass 2331208-Aug-1911-Aug-197 DayA345Cure - Turn Lanes33213-Aug-1916-Aug-197 DayA326Tie Steel - 1st Half Cross Streets22019-Aug-1921-Aug-195 DayA336Backfill Pavement44919-Aug-1922-Aug-195 DayA332Pave - 1st Half Cross Streets33021-Aug-1926-Aug-195 DayA337Install Gabions @ 61+8033923-Aug-1928-Aug-195 DayA346Cure - 1st Half Intersections33026-Aug-1929-Aug-197 DayA339Grade for Sidewalk1010928-Aug-1910-Sep-195 DayA327Tie Steel - 2nd Half Cross Streets22029-Aug-1902-Sep-195 DayA328Tie Steel - Driveways222403-Sep-1905-Sep-195 DayA333Pave - 2nd Half Cross Streets33003-Sep-1905-Sep-195 DayA334Pave - Driveways332405-Sep-1910-Sep-195 DayA347Cure 2nd Half Intersections33006-Sep-1909-Sep-197 DayA335Install Colored Stamped Concrete1010009-Sep-1923-Sep-195 DayA348Cure - Driveways333210-Sep-1913-Sep-197 DayA340Pave Sidewalk1010910-Sep-1924-Sep-195 DayA349Cure Stamped Concrete331923-Sep-1926-Sep-197 DayA341Backfill Sidewalk22924-Sep-1926-Sep-195 DayA342Grass & Landscape Outside44926-Sep-1902-Oct-195 DayRailroRailroad97971410-May-1925-Sep-195 DayA297Railroad Installed Concrete Panels SB1110910-May-1910-May-195 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Switch Traffic to Stage 4ARemove Concrete PavementSanitary SewerInstall SS @ SouthwesternComplete SS Rehab WorkStorm DrainStorm Drain Impovements SBComplete Inlet Tops after PavingWater LineBore Casing Under Railroad (102 LF)Complete SB Water Connections 28+26 to 45+80Install 16" Water Main 45+80 to 67+68Connect to Existing @ 67+68Complete Connections North of 45+80Remove/Grout Existing Water LineRoadwayBalance SubgradeFine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Tie Steel - Turn Lanes (6 turn lanes)Paving - Pass 2Pave - Turn LanesCure Paving - Pass 2Cure - Turn LanesTie Steel - 1st Half Cross StreetsBackfill PavementPave - 1st Half Cross StreetsInstall Gabions @ 61+80Cure - 1st Half IntersectionsGrade for SidewalkTie Steel - 2nd Half Cross StreetsTie Steel - DrivewaysPave - 2nd Half Cross StreetsPave - DrivewaysCure 2nd Half IntersectionsInstall Colored Stamped ConcreteCure - DrivewaysPave SidewalkCure Stamped ConcreteBackfill SidewalkGrass & Landscape OutsideRailroadRailroad Installed Concrete Panels SBRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 6 of 7Run Date 27-Aug-18Data Date 27-Aug-18 Activity IDActivity NameOriginalDurationRemainingDurationTotal FloatStartFinishCalendarA298Railroad Installed Ped Crossing Arms SB1110910-May-1910-May-195 DayA299Connect Pavement SB114413-Aug-1914-Aug-195 DayA300Build Sidewalk at RR Crossing SB111424-Sep-1925-Sep-195 DayTraffiTraffic Signals12121109-Sep-1926-Sep-19A302Signal Drill Shafts at Southwestern SB221309-Sep-1910-Sep-195 DayA304Install Conduit from SB Corners w/ Pull Boxes221510-Sep-1913-Sep-195 DayA305Signal Drill Shaft Cure661710-Sep-1916-Sep-197 DayA301Install Signal Poles & Wire881316-Sep-1926-Sep-195 DayStageStage 4B - Median Airline to Bethel370288009-Apr-1803-Dec-19A3870Switch Traffic to Stage 4B11902-Oct-1903-Oct-195 DayA3920Remove Concrete Pavement22903-Oct-1907-Oct-195 DayBridgeBridge14142203-Oct-1924-Oct-19A316Form & Pour NB Sidewalk222503-Oct-1904-Oct-195 DayA317Cure NB Sidewalk333505-Oct-1908-Oct-197 DayA318Form & Pour NB Traffic Rail10102508-Oct-1922-Oct-195 DayA338Illumination and Banner Poles on Bridge222522-Oct-1924-Oct-195 DayRoadRoadway3434007-Oct-1903-Dec-19A363Balance & Fine Grade Subgrade22907-Oct-1908-Oct-195 DayA3644" HMAC Ty B22909-Oct-1910-Oct-195 DayA365Tie Steel - Paving Pass 111910-Oct-1911-Oct-195 DayA368Pave - Pass 111911-Oct-1914-Oct-195 DayA366Tie Steel - Paving Pass 211914-Oct-1915-Oct-195 DayA372Cure Pass 1332514-Oct-1917-Oct-197 DayA373Cure Pass 2331315-Oct-1918-Oct-197 DayA369Pave - Pass 2111717-Oct-1918-Oct-195 DayA367Tie Steel - Paving Pass 3111718-Oct-1921-Oct-195 DayA370Pave - Pass 3111721-Oct-1922-Oct-195 DayA374Cure Pass 3332421-Oct-1924-Oct-197 DayA350Tie Steel - Pass 4111722-Oct-1923-Oct-195 DayA351Pave Pass 4111625-Oct-1925-Oct-195 DayA352Cure Pass 4332426-Oct-1929-Oct-197 DayA383Colored Stamped Cross Walk221829-Oct-1931-Oct-195 DayA371Colored Stamped Median Pavement221831-Oct-1904-Nov-195 DayA382Permanent Striping55022-Nov-1903-Dec-195 DayLightiLighting16161018-Oct-1915-Nov-19A375Install Illumination Drill Shafts (27 ea)88918-Oct-1930-Oct-195 DayA376Complete Conduit44930-Oct-1905-Nov-195 DayA378Cure Illumination Drill Shafts661430-Oct-1905-Nov-197 DayA377Set Illumination & Wiring88905-Nov-1915-Nov-195 DayLandsLandscaping364288009-Apr-1803-Dec-19A388Duration530463009-Apr-1803-Dec-197 DayA379Install Irrigation System1212023-Sep-1909-Oct-195 DayA380Install Landscape Borders88009-Oct-1921-Oct-195 DayA381Install Landscaping2424021-Oct-1922-Nov-195 DayMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb201820192020Railroad Installed Ped Crossing Arms SBConnect Pavement SBBuild Sidewalk at RR Crossing SBTraffic SignalsSignal Drill Shafts at Southwestern SBInstall Conduit from SB Corners w/ Pull Signal Drill Shaft CureInstall Signal Poles & WireStage 4B - MedianSwitch Traffic to Stage 4BRemove Concrete PavementBridgeForm & Pour NB SidewalkCure NB SidewalkForm & Pour NB Traffic RailIllumination and Banner PoleRoadwayBalance & Fine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Pave - Pass 1Tie Steel - Paving Pass 2Cure Pass 1Cure Pass 2Pave - Pass 2Tie Steel - Paving Pass 3Pave - Pass 3Cure Pass 3Tie Steel - Pass 4Pave Pass 4Cure Pass 4Colored Stamped Cross WColored Stamped MedianPermanent StripinLightingInstall Illumination Drill ShaComplete ConduitCure Illumination Drill ShaSet Illumination & WirinLandscapingInstall Irrigation SystemInstall Landscape BordersInstall LandscapingRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 7 of 7Run Date 27-Aug-18Data Date 27-Aug-18