Loading...
ST1501A-CS180926 (2) Priscilla Martinez From:Marcus Marion Sent:Friday, October 05, 2018 12:32 PM To:Priscilla Martinez Subject:Freeport - Drill Shaft Relocations Attachments:Revisions - Freeport Parkway - Bridge Revisions 2018.10.02.pdf This is the bridge revision for the Freeport project From: Darryl Zbranek Sent: Thursday, October 4, 2018 6:25 AM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - Drill Shaft Relocations Please see the attached bridge revisions. Please call with any questions. Thanks, Darryl Zbranek Chief Construction Inspector City of Coppell, TX (972)304-7090 www.coppelltx.gov From: Claudio Segovia <claudio@jvolkconsulting.com> Sent: Wednesday, October 3, 2018 5:36 PM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: Suzanne Weber <suzanne.weber@jvolkconsulting.com> Subject: RE: Freeport - Drill Shaft Relocations Sorry for the delay Darryl, I wasn’t at my desk most of the day. Please see attached revisions for the bridge. You can contact Geoff at A&F with any questions on these. Geoff Scheid, P.E. A GUIRRE & F IELDS LP (682) 325-5446 (Direct) (817) 509-8300 (Main) geoff.scheid@aguirre-fields.com 1 Also, I’ll be out through Tuesday. Suzanne may be able to help with any questions that come up while we are out. I’ve cc’d her on this e-mail. Thanks. Claudio Segovia | Engineer J. VOLK consulting 830 Central Parkway East | Suite 300 | Plano | TX 75074 972-201-3100 (office) 972-201-3102 (direct) 972-322-7026 (mobile) 972-201-3099 (fax) www.jvolkconsulting.com Service with Integrity, Initiative and Innovation From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Wednesday, October 03, 2018 4:55 PM To: Claudio Segovia <claudio@jvolkconsulting.com> Subject: Re: Freeport - Drill Shaft Relocations Claudio any word on the bridge re-design Thanks DZ Sent from my iPhone On Sep 27, 2018, at 10:06 AM, Claudio Segovia <claudio@jvolkconsulting.com> wrote: Thanks Darryl, we’ve sent this is on and should have revised plans ready for release by Thursday, th October 4. This timing should work based on TSC’s proposed schedule to begin drilling the second week of October. Claudio Segovia | Engineer J. VOLK consulting 830 Central Parkway East | Suite 300 | Plano | TX 75074 972-201-3100 (office) 972-201-3102 (direct) 972-322-7026 (mobile) 972-201-3099 (fax) www.jvolkconsulting.com Service with Integrity, Initiative and Innovation From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Thursday, September 27, 2018 8:58 AM To: Claudio Segovia <claudio@jvolkconsulting.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - Drill Shaft Relocations Claudio, we do not see any issues with the new design. See below comments from TSC. I included the coordinates and elevations of the Zayo utility below. BORE1, 7029168.69200 - 2425425.68000 - 486.90000,TOP OF PIPES 2 BORE2, 7029074.47900 - 2425502.92800 - 501.35000,TOP OF PIPES BORE3, 7029086.70300 - 2425494.37200 - 496.45000,TOP OF PIPES If you have any questions please let me know. Thanks, DZ From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Sent: Thursday, September 27, 2018 8:13 AM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> Subject: RE: Freeport - Drill Shaft Relocations Darryl, That will work for Texas Sterling. We would like a plan sheet for the changes that also shows the location of the utility with offset dimensions based on the survey that was done by TSC and the City. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | <image001.jpg> From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Thursday, September 27, 2018 7:08 AM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Subject: FW: Freeport - Drill Shaft Relocations See below. Just have to be sure the water line is not going to be a problem. From: Claudio Segovia <claudio@jvolkconsulting.com> Sent: Wednesday, September 26, 2018 5:04 PM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: Jay Volk <jay@jvolkconsulting.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - Drill Shaft Relocations Darryl, See A&F’s proposed plan below, this would cause an additional drill shaft to be installed but remove wingwall changes and reduce excessive reinforcement on cap. It doesn’t look like the locations for the two shafts (one moving 4’ west and a new one 10’ east of it) would cause any conflicts. Do you see any issues with doing this based on what you’ve seen on the field? 3 Thanks! Claudio Segovia | Engineer J. VOLK consulting 830 Central Parkway East | Suite 300 | Plano | TX 75074 972-201-3100 (office) 972-201-3102 (direct) 972-322-7026 (mobile) 972-201-3099 (fax) www.jvolkconsulting.com Service with Integrity, Initiative and Innovation From: Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com> Sent: Wednesday, September 26, 2018 9:10 AM To: Claudio Segovia <claudio@jvolkconsulting.com> Cc: Jay Volk <jay@jvolkconsulting.com>; Eugene Lee, P.E. <Eugene.Lee@aguirre-fields.com> Subject: RE: Freeport - Drill Shaft Relocations Claudio, We’d like to propose moving DS #8 to the west by four feet (instead of east) and adding a new drilled shaft (DS #9) to support the end of the cap. See the screenshot below. This will avoid any changes to the wingwall or railing and avoid any excessive reinforcing in the abutment cap. Please let us know if y’all or the City has any objection to this solution. <image002.jpg> Thanks, Geoff Scheid, P.E. A GUIRRE & F IELDS LP (682) 325-5446 (Direct) (817) 509-8300 (Main) To stop receiving messages from FreeportProjectST1501 group, stop following it. 4