Westfork-CS 880608 (2) Coppell, Texas 75019
June 8, 1988
Ms. Leslie Doggott
501 E. Bethel School Rd.
Coppell, Texas 75019
RE: Fee Assessment for WestforkAddi~ion
Dear Ms. Doggott:
The following is the fee assessment for the Westfork Addition:
Water Availability $220.00 per lot
5 lot x 220 = $1100.00 Plat 50% $550.00
Building Permit 50% $550.00
Sewer Availability $220.00 per lot
5 lot x 220 = $1100.00 Final 50% $550.00
Building Permit 50% $550.00
Water Tap Fee @ $100.00 each connector to main = $100.00
S/S Tap Fee @ $100.00 each connector to main = $100.00
Park Fund $150.00 per lot
5 lot x 150 = $750.00 Final 50% $375.00
Building Permit 50% $375.00
Street lights and street signs are assessed prior to acceptance.
Inspection fee is 1½% the cost of construction and is assessed prior to
construction.
If you have any questions/con~aents, please feel free to contact me at 462-8495.
Sincerely, / .
Steven M./on
Public Works Inspector
SMM/bb