Loading...
Westfork-CS 880608 (2) Coppell, Texas 75019 June 8, 1988 Ms. Leslie Doggott 501 E. Bethel School Rd. Coppell, Texas 75019 RE: Fee Assessment for WestforkAddi~ion Dear Ms. Doggott: The following is the fee assessment for the Westfork Addition: Water Availability $220.00 per lot 5 lot x 220 = $1100.00 Plat 50% $550.00 Building Permit 50% $550.00 Sewer Availability $220.00 per lot 5 lot x 220 = $1100.00 Final 50% $550.00 Building Permit 50% $550.00 Water Tap Fee @ $100.00 each connector to main = $100.00 S/S Tap Fee @ $100.00 each connector to main = $100.00 Park Fund $150.00 per lot 5 lot x 150 = $750.00 Final 50% $375.00 Building Permit 50% $375.00 Street lights and street signs are assessed prior to acceptance. Inspection fee is 1½% the cost of construction and is assessed prior to construction. If you have any questions/con~aents, please feel free to contact me at 462-8495. Sincerely, / . Steven M./on Public Works Inspector SMM/bb