Westfork-CS 880617 COPPELL PUBLIC WORKS
MEMORANDUM
June 17, 1988
TO: Planning & Zoning Department
FROM: Public Works Department ~,~.
RE: Westfork Addition
Attached are the co~nents and fee assessments associated with the above referenced
development, which staff believes are applicable to the project.
If there are any questions and/or con~nents regarding this matter, please direct
those inquiries to the following departments that are affected. Thank you.
Public Works Administration
Steve Goram
Steven Morton
Water Utilities
Howar~ Pafford
Parks
Richard Diano
Streets - Signs/Signalization
Per Birdsall
Dana Kamp
SGG/bb
COPP~,Lr, PUBLIC WORKS
MEMORANDUM
June 17, 1988
TO: Taryon Bowman, P & Z Coordinator
FROM: Steven M. Morton, Chief Developmental Inspector
via: Steve Goram, Director of Public Works
RE: Westfork Addition Final Review
Taryon, Public Works staff have reviewed the submitted final plat and plan.
All our con~ents have been addressed or requested as variance. Thank you.
$~/$C_~/bb
Coppell, Texas 75019
~ /~ The City With A Beautiful Future 214-462-0022
June 8, 1988
Ms. Leslie Doggott
501 E. Bethel School Rd.
Coppell, Texas 75019
RE: FeE Assessment fo~~._~~on
Dear Ms. Doggott:
The following is the fee assessment for the Westfork Addition:
Water Availability $220.00 per lot
5 lot x 220 = $1100.00 Plat 50% $550.00
Building Permit 50% $550.00
Sewer Availability $220.00 per lot
5 lot x 220 = $1100.00 Final 50% $5~0.00
Building Permit 50% $550.00
Water Tap Fee @ $100.00 each connector to main = $100.00
S/S Tap Fee @ $100.00 each connector to main = $100.00
Park Fund .~ $150.00 per lot
5 lot x 150 = $750.00 Final 50% $375.00
Building Permit 50% $375.00
Street lights and street signs are assessed prior to acceptance.
Inspection fee is 1%% the cost of construction and is assessed prior to
construction.
If you have any questions/con~nents, please feel free to contact me at 462-8495.
Sincerely,, ~
Steve~._M.~J~
Public Works Inspector