Loading...
Westfork-CS 880617 COPPELL PUBLIC WORKS MEMORANDUM June 17, 1988 TO: Planning & Zoning Department FROM: Public Works Department ~,~. RE: Westfork Addition Attached are the co~nents and fee assessments associated with the above referenced development, which staff believes are applicable to the project. If there are any questions and/or con~nents regarding this matter, please direct those inquiries to the following departments that are affected. Thank you. Public Works Administration Steve Goram Steven Morton Water Utilities Howar~ Pafford Parks Richard Diano Streets - Signs/Signalization Per Birdsall Dana Kamp SGG/bb COPP~,Lr, PUBLIC WORKS MEMORANDUM June 17, 1988 TO: Taryon Bowman, P & Z Coordinator FROM: Steven M. Morton, Chief Developmental Inspector via: Steve Goram, Director of Public Works RE: Westfork Addition Final Review Taryon, Public Works staff have reviewed the submitted final plat and plan. All our con~ents have been addressed or requested as variance. Thank you. $~/$C_~/bb  Coppell, Texas 75019 ~ /~ The City With A Beautiful Future 214-462-0022 June 8, 1988 Ms. Leslie Doggott 501 E. Bethel School Rd. Coppell, Texas 75019 RE: FeE Assessment fo~~._~~on Dear Ms. Doggott: The following is the fee assessment for the Westfork Addition: Water Availability $220.00 per lot 5 lot x 220 = $1100.00 Plat 50% $550.00 Building Permit 50% $550.00 Sewer Availability $220.00 per lot 5 lot x 220 = $1100.00 Final 50% $5~0.00 Building Permit 50% $550.00 Water Tap Fee @ $100.00 each connector to main = $100.00 S/S Tap Fee @ $100.00 each connector to main = $100.00 Park Fund .~ $150.00 per lot 5 lot x 150 = $750.00 Final 50% $375.00 Building Permit 50% $375.00 Street lights and street signs are assessed prior to acceptance. Inspection fee is 1%% the cost of construction and is assessed prior to construction. If you have any questions/con~nents, please feel free to contact me at 462-8495. Sincerely,, ~ Steve~._M.~J~ Public Works Inspector S~M/bb