Loading...
ST1501A- PT181128 (3)28 November 2018 Contact City inspector (469-507-9095) and Freeport contractor prior to commencing work. -- COPPEEE JO � T E U EOR ZAYO, CEI TU RY E �l � 8c FREEPORT PKWY ROAD RECONSTRUCTION i COPPEEE JO � T E U EOR ZAYO, CEI TU RY E �l � 8c FREEPORT PKWY ROAD RECONSTRUCTION D AEEAS COU �l TY COPPEEE, TX MAY 21, 2018 REV SED AUGUST 06, 2018 ZAY299_FREEPORT_360_NETWORK_C_TYP_001.DWG 01 010 001 002 003 004 005 006 007 008 009 6� n 1 II fl 014 015 016 017 --- 019 013 y 020 012 [Z=m ti- J� 6� �TM } FREEPORT PKWY, DALLAS COUNTY, TX ux r�,..�..w�• n..as.u. ru I�k�+Aw.T<lWl eti::us�assia� r.urs wdn.,w.y�r: wia ZAY299_FREEPORT_360_NETWORK_I_TYP_002.DWG 0 ne Lake o 0rLL 9�Jn 0 ilt SII4Cf I.nkr. Park L� Grapevine w ° — j Pro Or i IL� ;121 11 l - IL .. C a c m , DaNas-Fort rth International Airport DPW Airport lir iii.:. v��f Wagon Wheel Park Cotton Rd RegQnt ��v M AP SHEET BEGIN PROJECT Ic cr rn 'S Frit�D Gozb�A -"— 'b Brooks=Ln-, Dillard -Ln— ll db eihe{00 Dk Jay uck ray �_ d Grapevine ryF a Creek ParkI[JT �y 0 n r-=��eTt=lrhe R �g1 Ru e Sides�'�Iv br -- � I Dallas:. of FREEPORT PKWY. DALLAS COUNTY, TX ZAY299_FREEPORT_360_NETWORK_M_TYP_003.DWG CONTACT SHEET - DRAWING INDEX ZAYO CONTACTS DRAWING INDEX SENIOR PROJECT MANAGER: DESCRIPTION SHEET NAME FILE NAME TOMMY CAPPS OFFICE: (817) 665-8401 13647 OMEGA RD. FAX: (214) 252-7949 FARMERS BRANCH, TX 75244 CELL: (214) 869-7024 COVER SHEET CS01 ZAY299_FREEPORT_360_NETWORK_C_TYP_001.DWG E—MAIL: Thomas.Capps®Zoyo.com INDEX SHEET IS01 ZAY299_FREEPORT_360_NETWORK_I_TYP_002.DWG MAP SHEET MS01 ZAY299_FREEPORT_360_NETWORK_M_lYP_003.DWG SENIOR PROJECT ENGINEER CONTACT/DRAWING INDEX (THIS SHEET) CT01 ZAY299_FREEPORT_360_NETWORK_C_TYP_004.DWG ROCKY CROCKETT OFFICE: (817) 665-8415 CELL: (469) 417-8444 GENERAL NOTES GN01 ZAY299_FREEPORT_360_NETWORK_G_TYP_005.DWG E—MAIL: Rocky.Crockett@zayo.com DETAIL SHEETS(LEGEND & SYMBOLS) DT01—DT04 ZAY299_FREEPORT_360_NETWORK_L_TYP_006.DWG DETAIL SHEETS(TYPICAL TRENCH DETAILS) DT01—DT04 ZAY299_FREEPORT_360_NETWORK_B_TYP_007.DWG DETAIL SHEETS(TYPICAL CONST. DETAILS) DT01—DT04 ZAY299_FREEPORT_360_NETWORK_V_TYP_008.DWG BUILDING CONTACTS DETAIL SHEETS(TYPICAL HH/MH DETAILS) DT01—DT04 ZAY299_FREEPORT_360_NETWORK_V_TYP_009.DWG BUILDING CONTACT(S): DETAIL SHEETS(TYPICAL AERIAL CONST, DETAILS) DT01—DT04 XXXXX (XXX) XXX—XXXX TRAFFIC CONTROL PLAN TC01 MATERIAL RAKE—OFF SHEET MR01 ZAY299_FREEPORT_360_NETWORK_M_TYP_010.DWG BUILDING ENGINEER(S): OSP/ISP DESIGN SHEETS P01 ZAY299_FREEPORT_360_NETWORK_P_001-021.DWG xxxxx (XXX) xxx-xxxx ENGINEER CONTACTS PERMITTING AGENCIES ENGINEERING FIRM: GXT, LTD CITY OF COPPELL 1130 E. ARAPAHO RD., SUITE 625 OFFICE: (469) 385-5163 ENGINEERING DEPARTMENT OFFICE: (972) 304-3679 RICHARDSON, TX 75081 FAX: (469) 385-5164 TOWN CENTER WEBSITE: coppell.gov/utility—operations—division PRESIDENT/CEO: E—MAIL: mlenker@gxtltd.com 255 PARKWAY BLVD. MICHELLE LENKER COPPELL, TX 75019 ENGINEERING CONTACT: DIRECTOR OF ENGINEERING: KEN BAILEY CELL: (214) 551-5954 E—MAIL: kbailey@gxtltd.com OSP FIELD ENGINEER: JAMES ROBERTS CELL: (951) 757-7255 E—MAIL: jroberts®gxtltd.com CONSTRUCTION CONTACTS CONSTRUCTION FIRM: TO BE DETERMINED (XXX) XXX—XXXX CONSTRUCTION CONTACT: TO BE DETERMINED (XXX) XXX—XXXX SPLICING FIRM: TO BE DETERMINED (XXX) XXX—XXXX X CONTACT 48 HOURS PRIOR TO CONSTRUCTION )K EN NEMW CONTR/,CTM. PROJECT: PROJECT CODE: REV DESCRIPTION BY APVD DATE - - - - - FREEPORT PARKWAY znvzee zay ® COPPELL, TX nnE: CONTACT AND INDEX SHEET IIN hn Any.w W.gsWRElR wORwmN Off TIMS DOCIIYEM DRAWN GXT TAMRb,Inb.suwrt F420— — — — —_ BE USED RCOPIED, EPNOgILED DR APPV _ 7A1299JH9T-360JIEiM11N LC-lYP-004,0WG REV- DRCEOSEO N WNDLE OR RI PMT — 1wDI01R w Ismins 004 OF 010 .VPMAD ORNDNAE ISSUE OS 21 18 GENERAL NO ILS APPLICABLE CODES CABLE VAULT INSTALLATION NOTES. PROJECT INFORMATION AMERICAN ASSOCIATION OR STATE HIGHWAY AND TRANSPORTATION OFFICIALS - LATEST 1, FOR LOCATION AND ORIENTATION OF CABLE VAULTS, SEE - EDITION NETWORK ROUTE PLAN, OCCUPATIONAL SAFETY AND HEALTH STANDARDS - LATEST EDITION 2. ALL OPENINGS, PENETRATIONS AND JOINTS IN CABLE VAULTS SEALED WITH A NON-SHRINK GROUT TO FORM A WATERTIGHT MANUAL ON UNIFORM TRAFFIC CONTROL DEICES CABLE VAULT, 3, CABLE VAULTS INSTALLED ON A BASE CONSISTING OF CLEAN GRAVEL OR CRUSHED STONE. THE MINIMUM THICKNESS OF THE BASE SHALL BE TWELVE INCHES (121. 4. FINISHED SURFACE REPAIRED TO A CONDITION EQUAL TO OR GREATER THAN ORIGINAL CONDITIONS, 5, BOTTOM OF EXCAVATION COMPACTED AND LEVELED PRIOR TO CABLE VAULT INSTALLATION. 6. PLACE THE VAULT SO THAT THE COVER IS AT THE DESIRED GRADE ELEVATION. CITY GENERAL NOTES: GENERAL COMMENTS ENGINEERING CWtW REV DESCRIPTION BY APVD DATE II"F e.trap,b R..a Saxe ass Nk\a,daa T\1Wt zayo tmmlu r..fr%Osd Numb Thf3_NepVnMa Na�pen ZAYO GENERAL NOTES: 1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES, AND SEQUENCES FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. 2. THE CONTRACTOR SHALL VISR THE JOB SITE TO REVIEW THE SCOPE OF WORK AND EXISTING JOB SITE CONDITIONS. 3. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO SUBMITTING A BID. ANY DISCREPANCIES, CONFLICTS, OR OMISSIONS, SHALL BE REPORTED TO PROJECT MANAGER BEFORE PROCEEDING WITH THE WORK. 4. THE CONTRACTOR SHALL PROTECT ALL AREAS FROM DAMAGE WHICH MAY OCCUR DURING CONSTRUCTION. ANY DAMAGE BY CONTRACTOR TO NEW AND EXISTING CONSTRUCTION, STRUCTURE, LANDSCAPING, OR EQUIPMENT SHALL BE IMMEDIATELY REPAIRED OR REPLACED TO THE SATISFACTION OF THE ROW OWNER AND PROJECT MANAGER AT THE EXPENSE OF THE CONTRACTOR. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL REPLACE OR REMEDY, ANY FAULTY, IMPROPER, OR INFERIOR MATERIALS OR WORKMANSHIP OR ANY DAMAGE WHICH SHALL APPEAR WITHIN ONE YEAR AFTER THE COMPLETION AND ACCEPTANCE OF THE WORK UNDER THIS CONTRACT. 6. THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS ON A REGULAR BASIS, AND SHALL EXERCISE STRICT CONTROL OVER JOB CLEANING THROUGHOUT CONSTRUCTION UP TO COMPLETION OF WORK, 7, R SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ADJACENT TO OR CROSSING THE NETWORK ROUTE, WHETHER SHOWN HEREIN OR NOT, AND TO PROTECT THEM FROM DAMAGE, THE CONTRACTOR SHALL BEAR ALL EXPENSES FOR REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY CONTRACTOR IN CONJUNCTION WITH THE EXECUTION OF WORK. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE JOB IS IN PROGRESS AND UNTIL THE JOB IS COMPLETED. 9. THE CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, AND TOILET FACILITIES AS REQUIRED BY THE CITY OR GOVERNING AGENCY. 10. THE CONTRACTOR SHALL NOTIFY PROJECT MANAGER IF DETAILS ARE CONSIDERED UNSUITABLE, UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE PRACTICE. IF WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO OBJECTION TO THE DETAIL. DETAILS ARE INTENDED TO SHOW THE END RESULT OF THE DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUR JOB CONDITIONS, AND SHALL BE INCLUDED AS PART OF THE WORK. 11. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIR EXACT MEANING, TECH GROUP SHALL BE NOTIFIED FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 12. ALL GRADES SHOWN AS PROPOSED FINISHED GRADES INCLUDE SURFACE TREATMENTS SUCH AS TOPSOIL OR PAVEMENT. MAKE ALLOWANCES DURING EARTHWORK OPERATIONS FOR THESE SURFACE TREATMENTS. 13. ALL WORK SHOWN ON THE OSP DRAWINGS SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE REQUIREMENTS OF SPECIFICATION 02000 -FOC OSP -CONDUIT SYSTEMS. INFOPVAIWl1 ON THUG OOCVVEM IS PROPPETAR/ NID SIVLL NOT BF USED, COPED. PEPPODUCEO Ofl PSCLOSED N NNOLE OP I!1 PMT NiDWUT RARTFII CONSEM OF GAflLP FREEPORT PARKWAY COPPELL, TX GENERAL NOTES � IAYt99JRF1pORT_360�IE1NDfG(_C_11P GOOF: ZAY299 WALL FM TREE FOREIGN IIIJJJ 0' MKR x J /BUILDING OR OR w MAIGH SCALE: 12 OF SCALE FACT R EQUATION WATER VAULT POINT OF INTERSECTION STA 0+00 BK STA 0+00 BK STA 0+00 AH STA 0+00 AH STATION TIC MARK—OTHERS (0—TIC—UP) 0+00 STATION TIC MARK—OTHERS (0—TIC—DN) 0+00 STATION TIC MARK (TIC—UP) 0+00 STATION TIC MARK (TIC—DN) 0+00 wcununes CAUTION NOTE caunoN 111 IN AREA 100' PROP, AERIAL SPLICE POINT EXIST. AERIAL SPLICE POINT--_�_—= 100' PROP, AERIAL CABLE SLACK LOOP 100' EXIST. AERIAL CABLE SLACK LOOP RISER A AERIAL P ROP- UTIL- POLE -WITH- RISER U/G WITH PROP. (0001) RISER RISER -UTIL-POLE-WITH- RISER � A AERIAL U/G 000 FT. OVERHEAD GUY OHG AERIAL SPAN FOOTAGES � 00' EXIST, ANCHOR AND GUY \-J EXIST. S/VI ANCHOR AND GUY /. PROP. ANCHOR AND GUY PROP, S/W ANCHOR AND GUY V� REMOVE SYMBOL (REM) X SIGN CITY LIMIT SIGN �' FIRE HYDRANT WATER SPRINKLER WATER METER O IRRIGATION CONTROL VALVE ZL WATER VALVE GAS METER GAS VALVE ria EXIST. HH O PROP. 36"X60"X48" HH 0 (REGULAR HANDHOLE) EXIST. MH 0 PROP. 4'X4'X4' MH Q UNKNOWN MH E -MH ❑® SS -MH ❑® MH MH STM -MH W -MH D TEL -CABINET PROP -TEL -MH MH PED TEL -PED TEL -HH m CAN -MH FOC PED INLET ® f STM -INLET � BOC -INLET BOC BOC STM STM -DRAIN FOC ® FOC STDR 2 (STM DRAIN GRATE CONCRETE AROUND IT). SAN. SEWER CLEANOUT $` STREET LIGHT X TRAFFIC SIGNAL LIGHT POLE P. UTILITY POLE 0 EXIST/PROP UTIL POLE W/ PROP RISER 0 X-UTIL-POLE 0 X -UT IL -POLE -WITH -RISER 0 ELECTRIC TRANSFORMER O TRAFFIC SIGNAL PULLBOX ELECTRIC METER O ELECTRIC CABINET E HH VAULT B UNK. VAULT O ROW-MKR Ak PARKING METER ER PULLBOX Eal MAIL BOX R/R SIGNAL BOX R/R X-ING R/R POINT OF SWITCH t CELL TOWER BOLLARD 0 DDIMv rAlI RAI / PROP. CULVERT ROAD CURB ROAD EOP EXIST. CULVERT EXIST. CULVERT BLOCK: P-EOP-DWN — �\� PROP -ROAD EOP ---- il`----------'ti--------- \\\ .---------.� ----- BLOCK: P—EOP—UP — Q\ _ PROP S W EXIST. P. " .a S C/L RAILROAD TRACK TOE OF SLOPE TOP DITCH LINE 12" STM STM STM - - — 12" RCP/STM y17J 24 RCP STM UNIX UNK. NKNDUIT NK STEAM CONCRETE1 1' CAPPED HDPE STEEL CASING 1' CONDUIT PVC 1' SPLIT PVC CONDUIT DIR. BORE TRENCH AND PLACE HDPE H H EXIST, CONDUIT A AERIAL CABLE A UTILITY EASEMENT RIGHT-OF-WAY R/W — —R/W PR9PERTY LINE — — — P/L BOUNDARY LINE CITY/STATE/COUNTY/SECTION CITY/STATE/COUNTY/SECTION CENTER LINE FENCE LINE R/W AND FENCE LINE GUARD RAIL n n n n n n n n n n n n n n GUARD RAIL DIR. BORE (FOR TIE-IN OR CONTINUATION OF THE ROUTE) DB TRENCH OR PLACE FOR TIE-IN OR CONTINUATION OF THE ROUTE) AAERIAL CABLE (FOR TIE-INOR CONTINUATION OF THE ROUTE) ZAYO ZAYO ZAYO Vc W I"♦ 24" PIPELINE T T T FIB FIB FIB PROP -ROAD CURB OWE OWE — OWE CCLC CCLC CCLC MCI MCI MCI — ---- BLOCK: P-EOP-DWN — �\� PROP -ROAD EOP ---- il`----------'ti--------- \\\ .---------.� ----- BLOCK: P—EOP—UP — Q\ _ PROP S W EXIST. P. " .a S C/L RAILROAD TRACK TOE OF SLOPE TOP DITCH LINE 12" STM STM STM - - — 12" RCP/STM y17J 24 RCP STM UNIX UNK. NKNDUIT NK STEAM CONCRETE1 1' CAPPED HDPE STEEL CASING 1' CONDUIT PVC 1' SPLIT PVC CONDUIT DIR. BORE TRENCH AND PLACE HDPE H H EXIST, CONDUIT A AERIAL CABLE A UTILITY EASEMENT RIGHT-OF-WAY R/W — —R/W PR9PERTY LINE — — — P/L BOUNDARY LINE CITY/STATE/COUNTY/SECTION CITY/STATE/COUNTY/SECTION CENTER LINE FENCE LINE R/W AND FENCE LINE GUARD RAIL n n n n n n n n n n n n n n GUARD RAIL DIR. BORE (FOR TIE-IN OR CONTINUATION OF THE ROUTE) DB TRENCH OR PLACE FOR TIE-IN OR CONTINUATION OF THE ROUTE) AAERIAL CABLE (FOR TIE-INOR CONTINUATION OF THE ROUTE) ZAYO ZAYO ZAYO Vc W I"♦ 24" PIPELINE T T T FIB FIB FIB OWE OWE — OWE CCLC CCLC CCLC MCI MCI MCI — ---- VERIZON VERIZON VERIZON L3 L3 L3 sec sec sec -- ATT ATT ATT SPRINT SPRINT SPRINT L Vc 000 � 000 � PIPELINE PIPELINE PIPELINE `y G a"G G 1 W 8'W W W MILE MKR 1 MILE MKR IN FIELD 1 NOT IN FIELD S 8 S S S 1 1 a"SS 1 SS Ss SS 1 a"ww WARNING TAPE 18" BE'^'ll FINISHED TEM NOTE: BACKFILL WITH NATIVE ROCK FREE MATERIAL OR AS DIRECTED BY CITY COMPACT TO DENSITY REQUIRED BY CITY TYPICAL TRENCH IN EARTH N.T.S. REMOVE Q REPLACE CURB TO NEAREST JOINT BEYOND TRENCH MARKER TAPE DUCT SYSTEM CONCRETE SIDEWALK (SIDEWALK STRUCTURE PER AGENCY REQUIREMENTS. FOR RESTORATION - 4" MIN. CONCRETE DEPTH) BACKFILL: AS PER AGENCY MIN COVER CONCRETE SIDEWALK RESTORATION N.T.S. TYPICAL TRENCH DETAILS 1 3/4" MINUS CRUSHED MATERIAL 8" OASE COURSE MINIMUMOR AGENCY REQUIREMENT2" MINIMUM OR AGENCY ���MNREQUIREMENT IF GREATER 6.N .IF GREATER MARKER TAPE SYSTEM NOTE: BACKFILL WITH NATIVE ROCK FREE MATERIAL OR AS DIRECTED BY CITY COMPACT TO 959. TYPICAL TRENCH IN GRAVEL N.T.S. 6" BOTH SIDES MARKER TAPE DUCT SYSTEM SAWCUT EDGES aar REPLACE HARD SURFACE - 4" MIN THICKNESS OR AS PER AGENCY REQUIREMENTS BACKFILL: AS PER AGENCY ASPHALT PAVEMENT RESTORATION N.T.S. 6" STEEL CA DUCT SYSTEM DISTANCE VARIES 5MIN DOC UNDER ROAD SURFACE OR BOTTOM OF RR TRACKS TYPICAL JACK AND BORE N.T.S. l,IARKER TAPE DUCT SYSTEM REMOVE & REPLACE TO NEAREST DEEP JOINT BEYOND TRENCH BACKFILL: AS PER AGENCY EXISTING GRADE DUCT SYSTEId - TYPICAL DIRECTIONAL BORE N.T.S. CONCRETE STRUCTURE PER AGENCY REQUIREMENTS. FOR RESTORATION - 6" MIN. CONCRETE DEPTH) U CONCRETE PAVEMENT RESTORATION N.T.S. BORE PIT TYPICAL JACK & BORE 1-4" BSP E/W 2-1.25" HDPE &FIBER OPTIC CADLE WITHIN RAILROAD RIGHT-OF-WAY U BORE PIT TYPICAL BORE DETAILS PIT BORE PIT I 3 s TYPICAL DIRECTIONAL BORE 2-1.25" HDPE E/W FIBER OPTIC CABLE WITHIN RAILROAD RIGHT-OF-WAY U FIBER OPTIC CABLE TYPICAL DIRECTIONAL BORE TYPICAL DIRECTIONAL BORE (CROSSING ROAD/DRIVEWAY) 2-1.25" HDPE E/W FIBER OPTIC CABLE 2-1.25" HDPE E/W FIBER OPTIC CABLE o O o 0 U U U U rvin.,.in nn. nr Z Z FIBER OPTIC CABLE BORE PIT BORE PIT 2-1.25" HDPE E/W FIBER OPTIC CABLE BORE PIT BORE PIT TOP MAT3 - 0;�� 0 M BOTTOM MAT 0 9-4 BARS(C) AT 3" O.C. 4 BARS(E) HORIZ. (TOP MAT) AT 13 1/2" O.C. 8-5 BARS(A) AT 3 1/2" O.C. STRAIGHT (BOTTOM MAT) CLIP BARS 1 ,/2'om FROM OPENING 0wm *5 CIRCULAR BARS(E) AT CIRCULAR OPENING TYPICAL CONSTRUCTION DETAILS TYPICAL DETAIL PLACE SPLIT PVC BRANCH WYE E/W H -STRIP EXISTING INDTS. EXISTING FIBER -� OPTIC CABLE REMOVED IN PHASE II '- Pu24„vlE�l PROPOSED SPARE INNERDUCT TO BE P LAN - TOP SECTION SPLICED TO REMAINING INNERDUCT ONCE EXISTING FIBER OPTIC CABLE IS REMOVED IN PHASE II. BARS(A) 0 � a �am.m NO y.. m" a� m � � a N [O N TYPICAL CONSTRUCTION DETAILS TYPICAL DETAIL PLACE SPLIT PVC BRANCH WYE E/W H -STRIP EXISTING INDTS. EXISTING FIBER -� OPTIC CABLE REMOVED IN PHASE II '- Pu24„vlE�l PROPOSED SPARE INNERDUCT TO BE P LAN - TOP SECTION SPLICED TO REMAINING INNERDUCT ONCE EXISTING FIBER OPTIC CABLE IS REMOVED IN PHASE II. BARS(A) 12-/4 BARS(A) AT 6" O.C. STRAIGHT (TOP MAT) PLAN - SLAB BOTTO M 9- /4 BARS(C) AT 7" O.C. ISOMETRIC VIEW (TOP MAT) /5 BARS(A) ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE 1 1/2" AT 7 1/2" O.C. STRENGTH OF 4500 psi. CLR. /4 BARS(B) AT 7" O.C. .250 H -STRIP REINFORCING STEEL SHALL COMPLY WITH .35' ASTM BAR5 GRADE 60. SENDING AND A706 PLAC PLACEMENTGRADE 60 SHALLRCOMPLYGRADE 70WITH nr3.3' THE LATEST ACI STANDARDS I1 STANDARD STRUCTURAL DESIGN IS BASED ON W O-STRIPOTE: AASHTO HS 20 WHEEL LOADING ONTRACTOR TO PLACE CAP ON WATER TABLE IS AT 3'-0" BELOW GRADE 'a AT 3R1/2 O.C. OPTIC OPEN CABLE NHAS CE EXISTING REMIBER OVED FOR STANDARD STRUCTURAL DESIGN THE STANDARD DESIGN IS BASED ON THE TOP ANY ELEVATION BETWEEN FINISHED GRADE AND 5'-0" BELOW GRADE. 2 1/4" THE STRUCTURE SHALL BE PLACED ON A COMACTED GRANULAR CLR• BASE TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURES. SPECIAL DESIGNS BASED ON OTHER LOADINGS OR CUP BARS, 1/20 DEEPER INSTALLATION DEPTHS ARE LOADINGS OR 1480 FRAME AND COVER FROM OPENING ELEV. - SIDE WALL SECTION 2" 6- #4 BARS(C) AT 7" O.C. (TOP MAT) /4 BARS(B) AT 7" O.C. AT 7 1/2" O.C. MT ,I /4 BARS(B) a AT 13 1/2" O.C. 2 1/4" CLF. IT CUP BARS 1 111211 `84 BARS(G) FROM OPENING ELEV. - END WALL SECTION 3' -0"x5' -0"x '-0" MANHOLE TOP ECTION 813MM 1 i/2" SIMM � � 3BMMNJ 32' DIA 813MM 1 1/2" 3BMM �62MM IL ." 1 4' DIA 102MM B /9MM 1 1/2" 38MM 'B" DIA 965MM TABLE OF ASSEMBLED WEIGHTS COVER TYPE GRATE TYPE A. SOLID C2 HOLE VENT M FLAT HEAVY DUTY 350 LBS. 350 LBS. 360 LBS. (159 KG) (159 KG) (163 KG) KNOCKOUTS, OR PIPE OPENINGS CAN BE PROVIDED IN THE SIZE AND LOCATIONS REQUIRED. INSERTS, PULLING IRONS OR SUMPS CAN BE SUPPLIED AS REQUESTED BARS(B) ELEV. - SLAB BOTTOM SECTION "x5'-0" SLAB BOTTOM SECTION ;RJ.'� 12-/4 BARS(A) AT 6" O.C. STRAIGHT (TOP MAT) PLAN - SLAB BOTTO M 9- /4 BARS(C) AT 7" O.C. ISOMETRIC VIEW (TOP MAT) /5 BARS(A) ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE 1 1/2" AT 7 1/2" O.C. STRENGTH OF 4500 psi. CLR. /4 BARS(B) AT 7" O.C. .250 H -STRIP REINFORCING STEEL SHALL COMPLY WITH .35' ASTM BAR5 GRADE 60. SENDING AND A706 PLAC PLACEMENTGRADE 60 SHALLRCOMPLYGRADE 70WITH nr3.3' THE LATEST ACI STANDARDS I1 STANDARD STRUCTURAL DESIGN IS BASED ON W O-STRIPOTE: AASHTO HS 20 WHEEL LOADING ONTRACTOR TO PLACE CAP ON WATER TABLE IS AT 3'-0" BELOW GRADE 'a AT 3R1/2 O.C. OPTIC OPEN CABLE NHAS CE EXISTING REMIBER OVED FOR STANDARD STRUCTURAL DESIGN THE STANDARD DESIGN IS BASED ON THE TOP ANY ELEVATION BETWEEN FINISHED GRADE AND 5'-0" BELOW GRADE. 2 1/4" THE STRUCTURE SHALL BE PLACED ON A COMACTED GRANULAR CLR• BASE TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURES. SPECIAL DESIGNS BASED ON OTHER LOADINGS OR CUP BARS, 1/20 DEEPER INSTALLATION DEPTHS ARE LOADINGS OR 1480 FRAME AND COVER FROM OPENING ELEV. - SIDE WALL SECTION 2" 6- #4 BARS(C) AT 7" O.C. (TOP MAT) /4 BARS(B) AT 7" O.C. AT 7 1/2" O.C. MT ,I /4 BARS(B) a AT 13 1/2" O.C. 2 1/4" CLF. IT CUP BARS 1 111211 `84 BARS(G) FROM OPENING ELEV. - END WALL SECTION 3' -0"x5' -0"x '-0" MANHOLE TOP ECTION 813MM 1 i/2" SIMM � � 3BMMNJ 32' DIA 813MM 1 1/2" 3BMM �62MM IL ." 1 4' DIA 102MM B /9MM 1 1/2" 38MM 'B" DIA 965MM TABLE OF ASSEMBLED WEIGHTS COVER TYPE GRATE TYPE A. SOLID C2 HOLE VENT M FLAT HEAVY DUTY 350 LBS. 350 LBS. 360 LBS. (159 KG) (159 KG) (163 KG) KNOCKOUTS, OR PIPE OPENINGS CAN BE PROVIDED IN THE SIZE AND LOCATIONS REQUIRED. INSERTS, PULLING IRONS OR SUMPS CAN BE SUPPLIED AS REQUESTED BARS(B) ELEV. - SLAB BOTTOM SECTION "x5'-0" SLAB BOTTOM SECTION ELEV. - END WALL SECTION 3' -0"x5' -0"x '-0" MANHOLE TOP ECTION 813MM 1 i/2" SIMM � � 3BMMNJ 32' DIA 813MM 1 1/2" 3BMM �62MM IL ." 1 4' DIA 102MM B /9MM 1 1/2" 38MM 'B" DIA 965MM TABLE OF ASSEMBLED WEIGHTS COVER TYPE GRATE TYPE A. SOLID C2 HOLE VENT M FLAT HEAVY DUTY 350 LBS. 350 LBS. 360 LBS. (159 KG) (159 KG) (163 KG) KNOCKOUTS, OR PIPE OPENINGS CAN BE PROVIDED IN THE SIZE AND LOCATIONS REQUIRED. INSERTS, PULLING IRONS OR SUMPS CAN BE SUPPLIED AS REQUESTED BARS(B) ELEV. - SLAB BOTTOM SECTION "x5'-0" SLAB BOTTOM SECTION KNOCKOUTS, OR PIPE OPENINGS CAN BE PROVIDED IN THE SIZE AND LOCATIONS REQUIRED. INSERTS, PULLING IRONS OR SUMPS CAN BE SUPPLIED AS REQUESTED BARS(B) ELEV. - SLAB BOTTOM SECTION "x5'-0" SLAB BOTTOM SECTION 2' 3'x5'x 4'-0" PRE—CAST HANDHOLE m�rrsr NECK EXTENSION WEIGHTS 6" 450 LBS. 12" 850 LBS. 18" 1250 LBS. 24" 1650 LBS, OPTIONAL FEATURES �/ INCLUDE 6• INSERTS FOR STEPS OR UNISTRUT FOR STEP MOUNTING TYPICAL HANUHOLE AND MANHOLE DETAILS u�O Z� �5 2' nPICAL XTENSIO 'PECIFIED 41,2_ N5 \ 3 3'x 5'x 4' PRE -CAST MANHOLE ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH OF 4500 pai. REINFORCING STEEL SHALL COMPLY WITH ASTM A615 GRADE 80. A706 GRADE 60 OR A497 GRADE 70. BAR BENDING AND PLACEMENT SHALL COMPLY WITH THE LATEST ACI STANDARDS STANDARD STRUCTURAL DESIGN IS BASED ON AASHTO HS 20 WHEEL LOADING WATER TABLE IS AT 3'-0" BELOW GRADE FOR STANDARD STRUCTURAL DESIGN THE STANDARD DESIGN IS BASED ON THE TOP AT ANY ELEVATION BETWEEN FINISHED GRADE AND 5'-0" BELOW GRADE. THE STRUCTURE SHALL BE PLACED ON A COMACTED GRANULAR BASE TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURES. SPECIAL DESIGNS BASED ON OTHER LOADINGS OR DEEPER INSTALLATION DEPTHS ARE LOADINGS OR KNOCKOUTS, OR PIPE OPENINGS CAN BE PROVIDED IN THE 512E AND LOCATIONS REQUIRED. INSERTS, PULLING IRONS OR SUMPS CAN BE SUPPLIED AS REQUESTED 18" nPICAL w CK EXTENSION AS SPECIFIED TYPICAL NECK EXTENSION P14�619 4'x 4'x 4' PRE -CAST MANHOLE 6" WALLS - 6" ROOF 9; 48" HEADROOM TOP ION 0' SECT PERSONNEL OPENING SIZ OR CAST IN RING AND COVER AS REQUIRED BY CUSTOMER SEE NECK EXTENSION AND COVER DETAILS FOR l FEATURES AVAILABLE \ o GROUND ROD HOLE f~� SUMP ❑ 12" z 12" KNOCKOUTS 1HLL BE PLACHD IN HACH END WALL ❑ UNLB33 OTHERWISE SPECIFIED 24" 24" PERSONNEL OPENING SRE OR CAST IN RING AND COVER AS REQUIRED BY CUSTOMER SEE NECK EXTENSION AND COVER DETAILS FOR FEATURES AVAILABLE MINIMUM EXCAVATION 7'-O"x11'-0" 48-M 4'-0"x8'-0" QUIKSET 2 -PIECE MANHOLE MINIMUM EXCAVATION 6'-0"x8'-0" 35-M 5'-0" QUIKSET 2 -PIECE MANHOLE 6 APPROXIMATE BOTTOM SECTION TOP OR BOTTOM WEIGHTS APPROXIMATE 2'-0" INSIDE 7300 LBS. w TOP OR BOTTOM WEIGHT`. 2'-6" INSIDE 8300 LBS. 2'-0' INSIDE 4600 LBS. 3'-0" INSIDE 9300 LBS. i 2'-6" INSIDE 5200 LBS. w o 3'-6" INSIDE 10300 LBS. �- 3'-0" INSIDE 5900 LBS. -rn 4'-0" INSIDE 11200 LBS. 3'-6" INSIDE 6600 LBS. ? T / 4'-0" INSIDE 7300 LBS. MINIMUM EXCAVATION 7'-O"x11'-0" 48-M 4'-0"x8'-0" QUIKSET 2 -PIECE MANHOLE MINIMUM EXCAVATION 6'-0"x8'-0" 35-M 5'-0" QUIKSET 2 -PIECE MANHOLE MATERIAL RAKE -OFF SHEET - ZAYO (360 NETWORKS) OUTSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS 144ct FIBER OPTIC CABLE (AERIAL) — L.F. 144ct FIBER OPTIC CABLE (RISER) — L.F. 144ct FIBER OPTIC CABLE (U/G) 91415 L.F. 6M STRAND — L4 F4 OVERHEAD GUY — L.F. 1-4 GALVANIZE U—GUARD E/W 2-1.25 HDPE — L.F. DOWN GUY & ANCHOR — EACH AERIAL SLACK LOOP — FT. TRENCH 1-2" HDPE 78 L.F. DIRECTIONAL BORE . 1 —2" HDPE 758 L.F. TRENCH 2-2" HDPE — L.F. DIRECTIONAL BORE 2-2" HDPE — L.F. 1—MULE—TAPE — L.F. 1.25" HDPE — L.F. 10GA TRACER WIRE 836 L.F. 36"X60"X48" HANDHOLE 2 EACH 36"X60"X48" MANHOLE — EACH PULL CABLE THRU EXISTING ZAYO CONDUIT 8,629 L.F. SLACK COIL IN HANDHOLE/MANHOLE 700 EACH EXCAVATE & EXPOSE TO LOWER EXIST. 1 CONDUIT 100 L.F. EXCAVATE & EXPOSE 1 CONDUIT 100 S.F. EXCAVATE & EXPOSE TO LOWER EXIST, 2 CONDUITS — L.F. EXCAVATE & EXPOSE 2 CONDUITS — S.F. 144ct FIBER OPTIC CABLE (TOTAL) — FT. 144ct FIBER OPTIC CABLE (TOTAL) 10,134 FT, INSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS PULL THRU - L.F. 2" PLENUM RATED INNERDUCT - L.F. 1.25" E.M.T. - L.F. PULL BOX(ES) - EACH 144 FIBER CABLE - FT. 8 1 Know what's below, CALL BEFORE YOU DIG Call before you dlg. eoo-las-rias 48 HOURS NOTICE REQUIRED ExceaEwxc cartwcroR R""""°•�9p0p er..:uuESEw T.RlLRMI W.N.o6 n F.E« REV DESCRIPTION BY APVD DATE ® raaccn FREEPORT PKWY, 360 NETWORK COPPELL. TX a raECT c ZAY299 ZA OB 06 16 CITY COMMENTS MN — — — — MATERIAL RAKE -OFF SHEET - - - - - - - - - - wrpa W n s OoauExr 5 N 0i " D• COPfFD "E""c m p r RifllDllE TMi1F)1 CQ`IESFM OF PCua�a DRAWN OXT owo xa ZAY%XX3ROJECT-PROJECT - — -_ - -_ - -_ APPY _ SHEETS OtO OF O1O .VPPOVEV EMWVI.EL REV[ 1 1 MATERIAL RAKE -OFF SHEET - CENTURYLINK OUTSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS 144ct FIBER OPTIC CABLE (AERIAL) - L.F. 144ct FIBER OPTIC CABLE (RISER) - L.F. 144ct FIBER OPTIC CABLE (U/G) - L.F. 6M STRAND - L.F. OVERHEAD GUY - L.F. 1-4" GALVANIZE U-GUARD E/W 2-1.25 HDPE - L.F. DOWN GUY & ANCHOR - EACH AERIAL SLACK LOOP - FT. TRENCH 1-2" HDPE - L.F. DIRECTIONAL BORE 1 -2" HDPE - L.F. TRENCH 2-2" HDPE 93 L.F. DIRECTIONAL BORE 2-2" HDPE 713 L.F. 1-MULE-TAPE - L.F. 1.25" HDPE - L.F. 10GA TRACER WIRE - L.F. 36"X60"X48" HANDHOLE 2 EACH 36"X60"X48" MANHOLE - EACH PULL CABLE THRU EXISTING ZAYO CONDUIT - L.F. SLACK COIL IN HANDHOLE/MANHOLE - EACH EXCAVATE & EXPOSE TO LOWER EXIST. 1 CONDUIT - L.F. EXCAVATE & EXPOSE 1 CONDUIT - S.F. EXCAVATE & EXPOSE TO LOWER EXIST. 2 CONDUITS 100 L.F. EXCAVATE & EXPOSE 2 CONDUITS 200 S.F. 144ct FIBER OPTIC CABLE (TOTAL) - FT. 144ct FIBER OPTIC CABLE (TOTAL) - FT. INSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS PULL THRU - L.F. 2" PLENUM RATED INNERDUCT - L.F. 1.25" E.M.T. - L.F. PULL BOX(ES) - EACH 144 FIBER CABLE - FT. ENGMERWIC CCNiRJC m 8� REV — DESCRIPTION - - TIHP 4Anp.5. Rr45iNEU Know, whacs below. " "" °•""°" - - CALL BEFORE YOU DIG PMn<:JN.)EJ.li1J _ _ CaII before you dlg. 1-800-245-4546 r.nP.cR pn�Je �v�ome.: F-stN 48 HOURS NOTICE REQUIRED - - BY APVD DATE zaya PROJECT: FREEPORT PKWY, 360 NETWORK COPPELL, TX PROJECT LODE: ZAY299 MATERIAL RAKE -OFF SHEET - - - - - - NPORYATpN ON TNS OOLYNENT �S0.0YDOME�. � OR M OR MITIgOT YR M CONSENT OF CARREx DRAWN GXT � Na ZAYXXX_PROJECT-11TLE_M_iYP_014 - - - - - APPY - - - - 5NEETS 010 OF 010 APPROVED OR1Cm%I 65OE j �$ MATERIAL RAKE-OFF SHEET - LEVEL 3 OUTSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS 144ct FIBER OPTIC CABLE (AERIAL) - L.F. 144ct FIBER OPTIC CABLE (RISER) L.F. 144ct FIBER OPTIC CABLE (U/G) - L.F. 6M STRAND - L.F. OVERHEAD GUY - L.F. 1-4" GALVANIZE U -GUARD E/W 2-1.25 HDPE - L.F. DOWN GUY & ANCHOR - EACH AERIAL SLACK LOOP - FT. TRENCH 1-2" HDPE 93 L.F. DIRECTIONAL BORE 1-2" HDPE 713 L.F. TRENCH 2-2" HDPE - L.F. DIRECTIONAL BORE 2-2" HDPE - L.F. 1 -MULE -TAPE - L.F. 1.25" HDPE - L.F. 10GA TRACER WIRE - L.F. 36"X60"X48" HANDHOLE 2 EACH 36"X60"X48" MANHOLE - EACH PULL CABLE THRU EXISTING ZAYO CONDUIT - L.F. SLACK COIL IN HAND HOLE/MAN HOLE - EACH EXCAVATE & EXPOSE TO LOWER EXIST, 1 CONDUIT 100 L.F. EXCAVATE & EXPOSE 1 CONDUIT 200 S.F. EXCAVATE & EXPOSE TO LOWER EXIST, 2 CONDUITS - L.F. EXCAVATE & EXPOSE 2 CONDUITS - S.F. 144ct FIBER OPTIC CABLE (TOTAL) - FT. 144ct FIBER OPTIC CABLE (TOTAL) - FT. INSIDE PLANT DESCRIPTION QUANTITY UNITS NOTES\COMMENTS - PULL THRU L.F. 2" PLENUM RATED INNERDUCT - L.F. 1.25" E.M.T. - L.F. PULL BOX(ES) - EACH 144 FIBER CABLE - FT. 8 1 Know what's below, CALL BEFORE YOU DIG Call before you dig, t-800-245-4545 48 HOURS NOTICE REQUIRED E 4f EERWC CIX UCiOR ::b FAa Amps"R"cs.x.sa PWm:4S 1011 Prau40 [W TAM.Rc&trs NNMNF: FA» REV DESCRIPTION BY APVO DATE zaya ""ECT: FREEPORT PKWY, 360 NETWORK COPPELL, TX PRo CT CooE ZAY299 — — — — — - - - - - MATERIAL RAKE-OFF SHEET - - - - - — — — — W� ox TMs oaauE«T 6 PROP"ET N1D s HOT H D C0RE0 '�"OR N p r xma�iiT n�snwia�isErrt01io P DRAWN OXT owa xo: ZAYXXX_PROJECT-TITLE_M_TYP_014 - - - - - - APPY - - smus 010 OF 010 upm0 OR14m ISSUC 05/21/18 - NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, STA 103+88 CENTURY LINK (QUEST) HH PLACE 100' SLACK COIL NOTE; THESE CONSTRUCTION DRAWINGS ARE TO INDICATE PROPOSED ROUTE, CABLE LENGTH AND MANHOLE LOCATIONS, EACH COMPANY WILL HAVE SEPARATE PLANS USING RESPECTIVE CALLOUS AND TERMINOLOGY. STA 103+85 � EXIST. 380 NETWORKS (ZAYO) HH PLACE 100' SLACK COIL DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 424 6M STRAND FT — 1-4" GALV, U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — OVERHEAD GUY FT — AERIAL SLACK LOOP FT — TRENCH 4-2" HDPE LF — DIR. BORE 4-2" HDPE LF — DIR. BORE 1-4" HDPE CASING LF 1-1" HDPE FT — 1 —MULE TAPE FT — 1.25" HDPE FT — tOGA TRACER WIRE FT — 36"X60„48„ HH EA — 3'X5'X4' MH EA — EXCAVATE & EXPOSE TO LOWER EXIST. CONDUIT FT 100 PULL CABLE THRU EXIST. ZAYO CONDUIT FT 424 1-4” CORE BORE EA — SLACK COIL IN HH/MH FT 200 REMOVE & RESTORE CONCRETE S/W SF — REMOVE & RESTORE CONCRETE PAVEMENT SF — REMOVE & RESTORE ASPHALT PAVEMENT SF — 144c1 FIBER OPTIC CABLE (TOTAL) FT 624 CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION q-� �J u M ,9 I w I w SS. DALLAS COUNTY COPPELL, TX ea off, CAUTION !!!! CAUTION!!! CONTRACTOR TO LOCATE $ EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, VERIFY ALL EXISTING UTILITIES SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA PRIOR TO CONSTRUCTION AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. o+o m �3 REEPORT PKWY, h+ >A (CONCRETE) �+ I C•7 STA 103+85 TO STA 108+09 PULL (424') OF 144ct FIBER OPTIC CABLE o THRU EXIST. ZAYO CONDUIT AND REMOVE 1.144 FIBER OPTIC CABLE REV DESCRIPTION BY APVD DATE 11k0"rdw4T�15011 — CALL BEFORE YOU DIG 1-800-245-4545 T"M Rrr:l: rm : vmnr: &910 48 HOURS NOTICE REQUIRED Know what's b@IOW, 0811 before you dig. 3 NEW 54° RCP STORM DRAIN PIPE STA 106+84 TO STA 107+84 EXCAVATE &EXPOSE 4.2" HDPE CONDUITS: 1 DUCT - ZAYO 1DUCT-LEVEL3 2DUCTS-CENTURYLINK LOWER FROM 59" OF COVER TO 107" COVER MINIMUM. NOTE; UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. i a+wnal al rHs oocwurt a arrovracruzr a•;o swu ror oc usco. cavxo. xcamovcm crs osttosso c1 mlac ox ul oavr 'MrlKKli Nfl�RFJI CO"SCM a' W+RFA r: coot: COPPELL, TXKLY vxwccr FREEPORT PKWY. 360 NETWORK ZAY299 PLAN SHEET GXT _ 2AY299_FREEPORT_360_NEiY1'ORK_P_OOLDWG _ NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS. DESCRIPTION CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPLLL] TX CAUTION !!!! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION EXIST, BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, 144ct FIBER OPTIC CABLE (AERIAL) 144ct FIBER OPTIC CABLE (RISER) 144ct FIBER OPTIC CABLE NEW (U, 6M STRAND 1-4" GALV. U—GUARD E/W 2-1.25 DOWN GUY & ANCHOR OVERHEAD GUY DIR. BORE 4-2" HDPE DIR. BORE 1 —4" HDPE 1—I" HDPE 1—MULE TAPE 1.25" HDPE 10GA TRACER WIRE FT — FT — FT 617 FT — 37X5"X4" MH PULL CABLE THRU EXIST. AT&T CONDUIT PULL CABLE THRU EXIST. ZAYO CONDUIT SLACK COIL IN HH/MH EXCAVATE & EXPOSE REMOVE & RESTORE CONCRETE PAVEMENT REMOVE & RESTORE ASPHALT PAVEMENT 144c1 FIBER OPTIC CABLE (TOTAL) T T F F FT 617 EA — FT 200 SF — SF — CALL BEFORE YOU DIG SF — 1-800-245-4545 FT 817 48 HOURS NOTICE REQUIRED Know what's below, 0811 before you dig. NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. ITIS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. IEfliP10 OONIR1CfOR PROI[Ci: PROJECT CODE: REV DESCRIPTION BY APVD DATE FREEPORT PKWY. 360 NETWORK ® COPPELL, TX ZAY299 PLAN SHEET R4YVIr04 TC ]!011 _ — _ _ e1„naswI" iasP¢ Ey al rxs ooc mem DRAWN GXT a N0: REV Pzblr . %v - - - - - rs aaaPwErun nw sNa.E ]ror ZAY299�'REEPORT_360_NET11bRK_P_002.D11 - T.LLP.P.141N1r,Ua, \1n4r. F0100 _ D OSEDcaP „D. PF➢RDOdi P RT APPY — renw T b UEN co 09 w c ER SHEET 002 OF 027 APPROVED ORIGINAL ISSUE 05/21/18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE UNE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS, �W Q~ �w Wry >U —Z �O �U DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 498 6M STRAND FT — 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — TRENCH 4-2" HDPE Lt — DIR. BORE 4-2" HDPE LF — 1-1- HDPE CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION CALL BEFORE YOU DIG 1-800-245-4545 4B HOURS NOTICE REQUIRED \ IN Y •:.\nH. V Hu4 �.�:. sU Ho,reaa n.,.Im hone: 4; u w r. rU,:r.:b,Number; F.,,ro 0 DALLAS COUNTY COPPELL, TX STA 113+OS TO STA 118+06 PULL (498) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE 0 FREEPORT PKWY. (CONCRETE) FIB FIB REV DESCRIPTION BY APVD DATE 3 CAUTION M! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE LOCATION NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT R AND DEPTH PRIOR TO ANY DIGGING AND/OBORING, O O ImmonW W v a U) W W U) 'W R/W R/W R V I 0 O Q • II O W W W W w U L0 TO NT U0 Q R/W R/W R/W R/YI vJ W _Z J 2 U a Know what's below. CB�� before you dig. 0 NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ' PROJECT PKWY, 360 NETWORK ZAY299 COPPELL, TX PLAN SHEET owo xo: cv QXT 2AY299.fREEPORT_360_NEIWORK�_003.D'd _ — 1—MULE TAPE FT — 1.25" HDPE FT — 10GA TRACER WIRE FT — 36"X60"48" HH EA — 3'X5'X4' MH EA — PULL CABLE THRU EXIST, AT&T CONDUIT FT — PULL CABLE THRU EXIST, ZAYO CONDUIT FT 498 1-4" CORE BORE EA — SLACK COIL IN HH/MH FT — EXCAVATE & EXPOSE SF — REMOVE & RESTORE CONCRETE PAVEMENT SF — REMOVE & RESTORE ASPHALT PAVEMENT SF — 144ct FIBER OPTIC CABLE (TOTAL) FT 498 CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION CALL BEFORE YOU DIG 1-800-245-4545 4B HOURS NOTICE REQUIRED \ IN Y •:.\nH. V Hu4 �.�:. sU Ho,reaa n.,.Im hone: 4; u w r. rU,:r.:b,Number; F.,,ro 0 DALLAS COUNTY COPPELL, TX STA 113+OS TO STA 118+06 PULL (498) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE 0 FREEPORT PKWY. (CONCRETE) FIB FIB REV DESCRIPTION BY APVD DATE 3 CAUTION M! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE LOCATION NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT R AND DEPTH PRIOR TO ANY DIGGING AND/OBORING, O O ImmonW W v a U) W W U) 'W R/W R/W R V I 0 O Q • II O W W W W w U L0 TO NT U0 Q R/W R/W R/W R/YI vJ W _Z J 2 U a Know what's below. CB�� before you dig. 0 NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ' PROJECT PKWY, 360 NETWORK ZAY299 COPPELL, TX PLAN SHEET owo xo: cv QXT 2AY299.fREEPORT_360_NEIWORK�_003.D'd _ NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, DESCRIPTION CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPLLL, TX CAUTION !!!! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST, BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, 144ct AERIAL SLACK FIBER OPTIC CABLE (AERIAL.) F7 - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 498 6M STRAND FT - 1-4" GALV. U -GUARD E/W 2-1.25" HDPE FT - DOWN GUY & ANCHOR EA - LOOP TRENCH 4-2" HDPE DLR. BORE 4-2" HDPE DLR, BORE 1-4" HDPE CASING 1-1" HDPE 1 -MULE TAPE 1.25" HDPE 10GA TRACER WIRE 36"X60"48" HH 3'X52X4' MH PULL CABLE THRU EXIST, AT&T CONDUIT PULL CABLE THRU EXIST, ZAYO CONDUIT 1 -4'" CORE BORE SLACK COIL IN HH/MH EXCAVATE & EXPOSE REMOVE & RESTORE CONCRETE PAVEME� REMOVE & RESTORE ASPHALT PAVEMENT 144ct FIBER OPTIC CABLE (TOTAL) CALL BEFORE YDU DIG — I-800-245-4545 498 48 HOURS NOTICE REDUIRED REV DESCRIPTION BY APVD DATE R4Y.rirt T\ 1b11 _ T.LLPL PeTi.tr.lb. \'..:b.r•. F1i00 — — — _ Irsoaw*roP on rl.s ooc iuEPr R PROPHEiAY1 A19 SI4LLL POt PSCEOSCO �EIO.�PPJDUEFD aR M1nKKIT MPdtiEN CONSEM Cf fIHIZER Pxmccr: FREEPORT PKWY. 360 NETWORK COPPELL, TX nnu PLAN SHEET moE: ZAY299 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS, CONTRACTOR: DALLAS COUNTY ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION C O P P E L L, TX DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 502 6M STRAND FT — 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — OVERHEAD GUY FT — AERIAL SLACK LOOP FT — TRENCH 4-2" HDPE LF — n:o OnOU n._o" unor IF - 0 16• W 60" RCP STA 123+04 TO STA 128+p6 PULL (502') OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1=144 FIBER OPTIC CABLE CAUTION III! CAUTION!!! CONTRACTOR TO LOCATE & EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, VERIFY ALL EXISTING UTILITIES SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA PRIOR TO CONSTRUCTION AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, �-- _.��__ ' • �[!i!�j�[i'ili���ii4i�1'ip1Y.y.1 .. . . __— . ` . [[!L.�!,!,I,I;I;I;I;I;�i��l�l�i�iliji'i'II.11•i• • . , . -- _ L11,1i FFF mo WO DIR. BORE 1 —4LI­" HDPE CASING L 1-1" HDPE — 1—MULE TAPE FT — 1.25" HDPE FT — 10GA TRACER WIRE FT — 36"X60"48" HH EA — 3'X5'X4' MH EA — PULL CABLE THRU EXIST. AT&T CONDUIT FT — ENGMERWo CONTIUoox PULL CABLE THRU EXIST. ZAYO CONDUIT FT 502 1-4 IP CORE BORE EA SLACK COIL IN HH/MH FT — EXCAVATE & EXPOSE SF — It2f 4 :t Ar•PV RuRdrc4U REMOVE & RESTORE CONCRETE PAVEMENT SF — R`" " r""'T30" CALL BEFORE YOU DIG P4..r. 449.2314] REMOVE & RESTORE ASPHALT PAVEMENT SF — 1-800-245-4545 TAPRR,ytr.WJ\ynA r: mi" 144ct FIBER OPTIC CABLE (TOTAL) FT 502 48 HOURS NOTICE REQUIRED L so, \'9Cq Know what's below, 0811 before you dig. PCa NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. PROJECT: PROJLCL CODE: REV DESCRIPTION BY APVD DATE FREEPORT PKWY. 360 NETWORK _ _ O COPPELL, TX ZAY299 PLAN SHEET 16DRVATM ON nos Dowuurt DRAWN GXT owo NO. REY SIS PROPfaUT AVD S L not ZAY299�REEPORi 360_NET470QK3_005.OYr - DSCLOSED 1�J NitOLEL ORIEPJRT� APPV — mT)MT MbTTEN CONSEM a c M SHEET 005 OF 021 APPROVED ORIGINAL 155UE 05 21 18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS. 0W\ C O w w � CONTRACTOR: 171S YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPELL, TX CAUTION MI CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST, BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, STA 128+06 TO STA 133+OS PULL (499') OF 144ct FIBER OPTIC CABLE THRU EXIST. ZAYO CONDUIT AND f� 'REMOVEI-144.FT6EhiYlP'ir�F.l�IBLE �w OO �LLJ� LLI �O U) -R/w 0c) LLI `� W wJ—o/w --R/w —�,IW G ` v, --_ O 12-w, w oo w Q 111111111F IIIIIIIII =3 129+00 131+00 132+00 133+00 to O .. PROP.. WATER UNE .. _ .. + — — — — — — — M FREEPORT PKWY. N (CONCRETE) Q 40±00 U) imp bLW SEW s sew SEW O - sEw�—sEw scw sEw SEWsex scvr sew (� PROP. SS 12'. SS —SEM SEW SEW. . SEW S W S W -}- _ _ FIB CA M OF R/w R/w of-- R/w R r OE OE OE OE.. OE OE OE Q j- R/W /M'.. R/WTZ R/W— R/W ft Lli Q 0 w b wZ � -FJ- / Q O `\\\� I� 10' SS SEW 0 \_ Qc _ G DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 499 6M STRAND FT 1-4" GALV. U -GUARD E/W 2-1,25" HDPE FT - DOWN GUY & ANCHOR EA - OVERHEAD GUY FT - AERIAL SLACK LOOP FT - TRENCH 4-2" HDPE rFr - DIR. BORE 4-2" HDPE - DIR. BORE 1-4" HDPE CASING 1-1" HDPE 1 -MULE TAPE - 1.25" HDPE - 10GA TRACER WIRE - 36"X60°48" HH EA - Know what's below, 3'X5'X4' MH EA - C211 before you dig PULL CABLE THRU EXIST, AT&T CONDUIT FT - „ pamwm counv= R PULL CABLE THRU EXIST, ZAYO CONDUIT FT 499 REV DESCRIPTION 8Y kAPVD DATE y':1 -4" CORE BORE EA - - - - - ASLACK COIL IN HH/MH FT- ZWxEXCAVATE & EXPOSE SFwavnA,,n — REMOVE & RESTORE CONCRETE PAVEMENT SF- CALL BEFORE YOU DIG— REMOVE &RESTORE ASPHALT PAVEMENT SF — I aoo-zas-alas144ct FIBER OPTIC CABLE (TDTAL) FT ¢gg 48 HOURS NOTICE REQUIRED— .+wFT .iem. L NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT, IT IS THE CONTRACTOR RE9VON�iBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTTINICT11tlNg A M UTILITIES PP40R TO CONSTRUCTION, COMPLETE REPAIR OF ANY ANDA►L DAMAGES INCURRED SHALL BEAT THE EXPENSE OF THE CONTRACCTOt nwssa. #1 + Faaca coot: FREEPORT PK W't: 360 NETWORK ZAY299 �c PLAN SHEET eRAWIi 61Ci NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE cunuvu mmncD ulr_uwnve eun Devcn rITV aTDFFT I COUNTY ROAD INTERSECTIONS, DESCRIPTION DALLAS COUNTY COPPLLL, TX CAUTION W! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST, BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, 144ct AERIAL SLACK FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 498 6M STRAND FT — 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — LOOP TRENCH 4-2" HDPE DIR. BORE 4-2" HDPE DIR. BORE 1-4" HDPE CASING 1-1" HDPE 1—MULE TAPE 10GA TRACER WIRE 36"X60"48" HH 3'XS'X4' MH PULL CABLE THRU EXIST. AT&T PULL CABLE THRU EXIST. ZAYO CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION CONDUIT FT — CONDUIT FT 498 1-4" CORE BORE EA — SLACI< COIL IN HH/MH FT — EXCAVATE & EXPOSE SF — REMOVE & RESTORE CONCRETE PAVEMENT SF — CALL BEFORE YOU DIG REMOVE & RESTORE ASPHALT PAVEMENT SF — I-800-245-4545 144ct FIBER OPTIC CABLE (TOTAL) FT 498 48 HOURS NOTICE REQUIRED REV DESCRIPTION BY APVD DATE IIH I�ar.aAR RaW,Gin flr hrb Phoma: UffIUA Fal; I9 fl T.LLP.i_Reyrrebw.\enMr. &0000 IxFoau�rroR wl rMs oocuu[Irt rs Farnr�Er�zr A•;o slue r;or DE UECD. CDGED. RECR°WCEO °R PSCLOSED 1'I nNOIL OR UI R mnwuT rRbrrErl corrsEilr cF VAREa FREEPORT PKWY. 360 NETWORK COPPELL, TX cooE: ZAY299 PLAN SHEET GXT "° no- aEv _ 2AY299�REEPORi_36O_NETWORK_P_W7.D15 - NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DESCRIPTION DIR. BORE 1-4'2 UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 499 6M STRAND FT - 1-4" GALV. U -GUARD E/W 2-1.25't HDPE FT - DOWN GUY & ANCHOR EA - OVERHEAD GUY FT - AERIAL SLACK LOOP FT - TRENCHHDPE LF - n:o ono. A_o" unor I IF I- HDPE CASING LF 1-1" HDPE FT — 1 -MULE TAPE FT - 1.25" HDPE FT - 10GA TRACER WIRE FT - 36"X60.,48,. HH EA - PULL CABLE THRU EXIST. AT&T CONDUIT PULL CABLE THRU EXIST. ZAYO CONDUIT 1-4" CORE BORE SIACIN COIL IN HH/MH EXCAVATE & EXPOSE REMOVE & RESTORE CONCRETE PAVEMENT REMOVE & RESTORE ASPHALT PAVEMENT 144ct FIBER OPTIC CABLE (TOTAL) 499 I� CALL BEFORE YOU DIG 1-800-245-4545 48 HOURS NOTICE REQUIRED IIIC Ra„.\r•pV Ru4 CGln 61 Rk evt:"9TC 10 n...:mxvm T.0.P.F_RrEinnJ.��Mrr. FIIW DALLAS COUNTY COPPELL, TX STA 138+03 TO STA 143+02 PULL (499) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE CAUTION W! CONTRACTOR TO LOCATE 8 VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, 1 W Ll�w 33 > z W 0`� VJ 3 c c W //W^ 12'WIT , Cal ac�.L����� _W W Oq 141+0042�U0 IV IT PROP. WATER LINE PROP, WATER LINE (V FREEPORT PKWY. M (CONCRETE) q:T 3000 Q FENNO U) 11 EE U 39' RCP 42' RCP O SS„ W ROP. SS SEW SEW SEW SEW—SEW—SEW—SEW—SEW—SEW SEW SEW `J -SEI SEW SEW . SEW 5£W .. .SEW .SEW SEW£�W--SEW–SEW.�S 1Y FILIU HIS ..R m11_ R/W R/W R/W R/W 07 OE N 0 FOMENT o U) REV DESCRIPTION BY APVD DATE Know what's below, 0811 heiore you dig. NOTE• UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR, IhTORVA1gN OR rH5 OOCVUENt R PROPPoEIIAt AVO SwLL 1:01 RE uscR, cov.Eo. REPRooucEo ca PSCLOSEO iY nlglF OR W vw9T nnnaur nrartER coksurt ta cucaEx PRaccr caoE: EPORT PKWY. 360 NETWORK zaY2se COPPELL, TX PLAN SHEET GXT owo Ro: REN _ ZAY299�REEPORT_360_NE5%K_P_M.DH - NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS I COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE UNE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS, NOTE: CABLE FOOTAGE IS LESS THAN STATIONING FOOTAGE. FROM STA143+57 TO STA 145+66 NOTE: MANHOLES WILL BE MINIMUM OF 2 FEET APART, DESCRIPTION 144ct FIBER OPTIC CABLE (AERIAL) 144ct FIBER OPTIC CABLE (RISER) 144ct FIBER OPTIC CABLE NEW (U/G) 6M STRAND 1-4" GALV, U—GUARD E/W 2-1.25" HDPE DOWN GUY & ANCHOR OVERHEAD GUY AERIAL SLACK LOOP TRENCH 4-2" HDPE DIR, BORE 4-2" HDPE DIR, BORE 1-4" HDPE CASING 1-1" HDPE 1—MULE TAPE 1.25" HDPE 10CA TRACER WIRE 36"X60"48" HH 3'X5'X4' MH PULL CABLE THRU EXIST. AT&T CONDUIT PULL CABLE THRU EXIST. ZAYO CONDUIT 1-4" CORE BORE SLACK COIL IN HH/MH EXCAVATE & EXPOSE REMOVE & RESTORE CONCRETE PAVEMENT REMOVE & RESTORE ASPHALT PAVEMENT 144ct FIBER OPTIC CABLE (TOTAL) STA 143+38 PLACE CTL MH 2 HDPE DUCTS UNIT QUANTITY FT — FT — FT 415 FT — FT — EA — FT — FT — LF 38 LF 377 415 CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION STA 143+45 PLACE LVL3 MH 1 HDPE DUCT STA 143+52 PLACE ZAYO MH 1 HDPE DUCT STA 143+52W TO STA 143+57E TRENCH & PLACE (38') 4-2" HDPE E!W 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE STA 143+02 TO STA 147+34 REMOVE EXIST, 1-144ct FOC STA 143+02 TO STA 143+52 PULL (50') OF 144ct FIBER OPTIC CABLE THRU EXIST. ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE DALLAS COUNTY COPPELL, TX °�- CAUTION HH CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION STA 143+57 TO STA 147+34 DIR. BORE (377') 42" HDPE E/W 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE pROR —� FREEPORT PKWY. 3 (CONCRETE) 42' RCP c] SE SEW SEW —SEW r F - - b STA 143+38 TO STA 143+88 OPEN CUT &EXPOSE EXISTING 4 CONDUITS REQUIRED FOR FOLDBACK SPLICE -PLACE STEEL PLATING OVER TRENCH DURING SPLICING WORK. 50 100 50 CALL BEFORE YOU DIG 1-800-245-4545 565 48 HOURS NOTICE REQUIRED Know what's bE:)OW. Cell before you dig. REV ' 08 O6 I6 C I IH Fiu.\np4 N.a4 iNNai1 Fax: WJWIN — — T.U.P.F_Neal.IraWa..\anJ,an F11t0 FIB CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT z LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, O SCALE 1 "=40' !0 �s i NOTE: THESE CONSTRUCTION DRAWINGS ARE TO INDICATE PROPOSED ROUTE, CABLE LENGTH AND MANHOLE LOCATIONS. EACH COMPANY WILL HAVE SEPARATE PLANS USING RESPECTIVE CALLOUS AND TERMINOLOGY. NAMPA /,� ,�✓�fillNED �- HANDHOLE/CONDUIT CONFIGURATION . LLJ NOT TO SCALE 4 - 2" HDPE CONDUITS �� 1-ORANGE-CCLC(CTL) i Q � 1 - BLACK - (LV3) 1 LV3 =BLACK 1 - GREEN - (ZAYO) N 1 - BLACK W/ ORANGE STRIPE - (CCLC) I_- Z 1 CTL - BLACK W/ ZAYO LEVEL(3) CTL �Q ORANGE STRIPE HH HH HH 1 CTL- BLACK W/ LL.0 ^ ORANGE STRIPE I NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. ITIS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.IF DESCRIPTION BY APVD DATE MN 1 -GREEN (ZAYO) y 1 -ORANGE (CTL) 1 -BLACK (LV3) O 1 -ORANGE (CTL) 1 -GREEN (ZAYO) mroRwrroN a, rl.s DocuvElrt 5 PROPI71EiwRY 4•:0 SNILI I.O] DOSClOSED OFlEM,�PNODUCFD mnqur rmnol calsurt u fXOER CTL=ORANGE 1 -BLACK (LV3) 3 = 1 -GREEN (ZAYO) 1 -BLACK W/ ORANGE STRIPE FREEPORT PKWY. 360 NETW COPPELL, TX nnE: PLAN SHEET cxr CODE: ZAY299 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS CROSSING INTERSECTING I I I STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS, CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION STA 147+62 TO STA 150+40 DIR. BORE (300)4m2 HDPE E!W 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE STA 150+40 TO STA 150+42 TRENCH & PLACE (21) 4.1.25" HDPE ENV 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE e" �G � V rt' 8 G/� p c9k de hy' \ DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT 144ct FIBER OPTIC CABLE (RISER) FT v 144ct FIBER OPTIC CABLE NEW (U/G) FT 300 6M STRAND FT — 1-4" GALV, U -GUARD E/W 2-1.25" HDPE FT - DOWN GUY & ANCHOR EA OVERHEAD GUY FT AERIAL SLACK LOOP FT TRENCH 4-2" HDPE LF - lea "' R�'� DIR. BORE 4-2" HDPE LF 300 DIR. BORE 1 -4" HDPE CASING LF V� 1-1" HDPE FT - j s5 1 -MULE TAPE FT 1.25" HDPE FT - (� 10GA TRACER WIRE FT 300 36"X60"48" HH EA - 3'X5'X4' MH EA - PULL CABLE THRU EXIST. AT&T CONDUIT FT - acres PULL CABLE THRU EXIST. ZAYO CONDUIT FT - REV DESCRIPTION BY APUD DATE 1 C CORE BORE EA — 08 O6 IB CITY COMMENTS MN — SLALACI< COIL IN HH/MH FT - - - - - EXCAVATE & EXPOSE SF - riw Rkhs ww X7 l as REMOVE & RESTORE CONCRETE PAVEMENT SF — Rkk.A,.a MIU CALL BEFORE YOU DIG °"""""""' REMOVE & RESTORE ASPHALT PAVEMENT SF — 800-245-4545 T.LLP.F_R.Tam P6 W@Nv:m.r: Fna- 144c1 FIBER OPTIC CABLE (TOTAL) FT 300 ne HOURS NOTICE REQUIRED DALLAS COUNTY �. CAUTION!!! EXIST COPPELL, TX . BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, NOTE: THESE CONSTRUCTION DRAWINGS ARE TO INDICATE PROPOSED ROUTE, CABLE LENGTH AND MANHOLE LOCATIONS, EACH COMPANY WILL HAVE SEPARATE PLANS USING RESPECTIVE CALLOUS AND TERMINOLOGY. Know what's below, Cell before you dig. 0 CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. ITIS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. PROJECT CODE: nsoRvvroR ar r s ooar,Enr 5 PROPREiMt AW $HKl AOf GSCCOSCD OP.Em.�rSAtJRUCFD qtR mnq,rt RwrtER carourt u' waaw COPPELL, TX FREEPORT PKWY. 360 NETWORK ZAY299 GX7 PLAN SHEET _360 NE1110RK_P_OIO.DWG - NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS I COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS. CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPLLL, TX CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE \ �s RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. STA 151+63 IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL PLACE LVL3 MH o UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. 1 HDPE DUCT \ �ti �4e �k COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. G S� STA 151+56 STA 151+70�� PLACE ZAYO HH REPLACE CTL MH m / \ i \\ PLACE 100' SLACK COIL 2 HDPE DUCTS --- 1 HDPE DUCT I a / / 0 3LPtf. STA 151+42 TO STA 151+56W Q�oe. �X TRENCH & PLACE 14' 42" HDPE ( ) I �6 EIW 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE O _ / : _•rye \ �yi V� s E STA 150+61 TO STA 151+42 DIR. BORE (811) 42" HDPE yi 'yJ E/W 144ct FIBER OPTIC CABLE & 5� / F0 10GA TRACER WIRE STA 150+42 TO STA 150+61 TRENCH &PLACE (25') 42" HDPE EIW 144ct FIBER OPTIC CABLE & 10GA TRACER WIRE DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 312 6M STRAND FT - 1-4" GALV. U -GUARD E/W 2-1.25' HDPE FT - DOWN GUY & ANCHOR EA - OVERHEAD GUY FT - AERIAL SLACK LOOP FT - TRENCH 4-2" HDPE LF 40 DIR, BORE 4-2•' HDPE LF 81 DIR, BORE 1 -4•' HDPE CASING LF 1-1" HDPE FT - 1 -MULE TAPE FT - 1.25" HDPE FT - 10GA TRACER WIRE FT 121 36"X60"48" HH EA 3 3'X5'X4' MH EA - PULL CABLE THRU EXIST. AT&T CONDUIT FT - PULL CABLE THRU EXIST. ZAYO CONDUIT FT 191 1-4" CORE BORE EA - SLACK COIL IN HH/MH FT 100 EXCAVATE & EXPOSE SF 50 REMOVE & RESTORE CONCRETE PAVEMENT SF - REMOVE & RESTORE ASPHALT PAVEMENT SF - 144ct FIBER OPTIC CABLE (TOTAL) FT 412 Know what's below, Call before you dig, F�0 F�0 STA 151+56 TO STA 153+47 PULL (191') OF 144ct FIBER OPTIC CABLE THRU EXIST. ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE STA 151+25 TO STA 151+75 OPEN CUT &EXPOSE EXISTING 4 CONDUITS REQUIRED FOR FOLDBACK SPLICE -PLACE STEEL PLATING OVER TRENCH DURING SPLICING WORK, �.,_•_ �•~~- REV DESCRIPTION BY APVD DATE 08 O6 18 CITY COMMENTS MN _ _ II 4pu4 X.IIeTU — N Pf4\niwP. TX iNII CALL BEFORE YOU DIG PE•""""s"`r 1-800-245-4545 t.uP.r_wtl.irmw �:nnrr Fnw a8 HOURS NOTICE REQUIRED - - - - CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION NOTE: THESE CONSTRUCTION DRAWINGS ARE TO INDICATE PROPOSED ROUTE, CABLE LENGTH AND MANHOLE LOCATIONS. EACH COMPANY WILL HAVE SEPARATE PLANS USING RESPECTIVE CALLOUS AND TERMINOLOGY, HANDHOLE/CONDUIT CONFIGURATION 4.2" HDPE CONDUITS NOT TO SCALE 1-ORANGE-CCLC(CTL) 1 -BLACK - (LV3) 1 -GREEN - (ZAYO) 1 -BLACK W/ORANGE STRIPE - (CGCG) CTL I 1 CTL - BLACK W/ HH ORANGE STRIPE 1 -BLACK (LV3) --- 3 = 1 -GREEN (ZAYO) 1 -BLACK W/ ORANGE STRIPE 0 1 CTL a ORANGE IVEDSVAipN WI TINS DDCN/ENi rs PaoclaEiAm A'.D SwLLL I:Dr DE usEo, cavED. PEExmoucro w+ DSCLOSED Pi N1101L Ofl �N FA4i wnaur Nrartul corrsElrt cs cvaaEn 1 LV3 =BLACK LE FIH (3) 1 -ORANGE (CTL) 1 -GREEN (ZAYO) ZAYO 1CTL-BLACK W/ HH � ORANGE STRIPE �-1 -GREEN (ZAYO) 1 -ORANGE (CTL) 1 -BLACK (LV3) CME: n Pxaccr PORT PKWY. 360 NETWORK zAY2se COPPELL, TX PLAN SHEET IN GXT DwFlo: nEv ZAY29c9_FREEPORT_360-NETK'ORK_P_O11.DW, NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION STA 153+47 TO STA 156+81 PULL (3341) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE DALLAS COUNTY COPPLLL, TX CAUTIONl1! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION ILII CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION y y, x �� J e S `c -V �k y1 P 1� OR 1' Ax PFF / Q�oe , / � �r� / yJ✓ VQ • . �1 � �� f F. yF,i� � cis SFy, DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT 144ct FIBER OPTIC CABLE (RISER) FT — \\ 144ct FIBER OPTIC CABLE NEW (U/G) FT 334 t�O 6M STRAND FT 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT DOWN GUY &ANCHOR EA — OVERHEAD GUY FT - !� 'deo AERIAL SLACK LOOP FT TRENCH 4-2" HDPE LF - �t DIR. BORE 4-2" HDPE LF - DIR. BORE 1-4" HDPE CASING LF \�/) 1-1" HDPE FT 1 -MULE TAPE FT 1.25" HDPE FT 10GA TRACER WIRE FT _ Knowwhac5below. 3'55''X4' 36"5X4' MM H EA HH EA Call before you dig, - PULL CABLE THRU EXIST. AT&T CONDUIT FT - Ercr�n TAnrarmaR PULL CABLE THRU EXIST. ZAYO CONDUIT FT 334 REV DESCRIPTION BY APVD DATE CORE BORE EA - - - - - SLACK COIL IN HH/MH FT - - - - - - EXCAVATE & EXPOSE SF FAM ArapsM u xma Smihi REMOVE & RESTORE CONCRETE PAVEMENT SF - - CALL BEFORE YOU DIG REMOVE & RESTORE ASPHALT PAVEMENT SF - 1-800-245 -4545- 144c1 FIBER OPTIC CABLE (TOTAL) FT 334 48 HOURS NOTICE REQUIRED - - - - - 3 0 NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT, WORTH WATER, SANITARY AND STORM SEWER LINES NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON WATER, SANITARY AND STORM SEWER LINES NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT, ITIS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR, PxOi[DI: PROJECT CODE: FREEPORT PKWY. 360 NETWORK GXT ZAY299 COPPELL, TX PLAN SHEET _36O1JElY/DRK_P_O12.DY1G _ 'AL ISSUE OS 21 18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE UNE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, ESCRIPTION 144ct FIBER OPTIC CABLE (AERIAL) l � ly COPPELL, TX ZAY299 U -GUARD E/W 2-1.25" HDPE DOWN GUY & ANCHOR OVERHEAD GUY AERIAL SLACK LOOP DIR, BORE 1-4" HDPE CASING 1-1" HDPE 1 -MULE TAPE 1.25" HDPE 10GA TRACER WIRE PULL CABLE THRU EXIST. AT&T CONDUIT PULL CABLE THRU EXIST. ZAYO CONDUIT 1-4" CORE BORE SLACK COIL IN HH/MH EXCAVATE & EXPOSE REMOVE & RESTORE CONCRETE PAVEM5 REMOVE & RESTORE ASPF lhhct FIBER OPTIC CABLE UNIT � QUANTITY 317 CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION _d 0 Know what's below. Call before you dig. 317 STA 156+81 TO STA 159+98 PULL (3171) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE DALLAS COUNTY COPPLLL, TX �y5 CALL BEFGRE YGU DIG — 1-800-245-4545 317 48 HOURS NOTICE REQUIRED CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION II!! CONTRACTOR TO LOCATE & / VERIFY ALL EXISTING UTILITIES / O PRIOR TO CONSTRUCTION 6'x6' 6 LQ x 14 � E /�� ly\ NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT. WORTH WATER, SANITARY AND STORM SEWER LINES NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON WATER, SANITARY AND STORM SEWER LINES NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. r+maHo � REV DESCRIPTION BY APVD DATE Pxaca: PRaECr cooE: FREEPORT PKWY. 360 NETWORK ee...:a,xviss t,.:.es�us,u T.LLP.L f tZhIra l NUMNr: F1300 � ly COPPELL, TX ZAY299 nnE: PLAN SHEET — InToawlron a: ms oocwDlr R PP ElM XV 5H/.D, , 'T W USED, CWED. PtPRJIXKED on asaosco IN mart c 11 PX4T mD, T MUDI Co SDa cF umaEx DRAWN GXT ZAY299-FREEPORT-360-NE!IItlRK-P-013.DWG ntv _ _ _ _ _ APPV _ — — — — SHEET 013 OF 021 APPROVED ORIGINAL ISSUE O5 21 18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, DESCRIPTION UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 356 6M STRAND FT - 1-4" GALV. U -GUARD E/W 2-1.25" HDPE FT - DOWN GUY & ANCHOR EA - AERIAL SLACK LOOP FT - TRENCH 4-2" HDPE LF - DIR. BORE 4-2" HDPE LF - DIR. BORE 1-4" HDPE CASING LF 1-1" HDPE FT - 1 -MULE TAPE FT - 1.25" HDPE FT _ 10GA TRACER WIRE FT - 36"X60"48" HH EA - 3'X5'X4' MH EA - PULL CABLE THRU EXIST, AT&T CONDUIT FT - PULL CABLE THRU EXIST. ZAYO CONDUIT FT 356 1-4" CORE BORE EA - SLACK COIL IN HH/MH FT - EXCAVATE & EXPOSE SF - REMOVE & RESTORE CONCRETE PAVEMENT SF - REMOVE & RESTORE ASPHALT PAVEMENT SF - 144ct FIBER OPTIC CABLE (TOTAL) FT 356 CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY fOPPELL, TX , \ /\A E a 9 y' y1 SGP �1 STA 159+98 TO STA 163+54 / E PULL (356') OF 144ct FIBER OPTIC CABLE y, 6 \pxpp/ THRU EXIST, ZAYO CONDUIT AND c REMOVE 1-144 FIBER OPTIC CABLE G exp O� O �y G / jyl O � � G y, is J O � / 79 6� Know what's below . Call before you dig. 1 IIl0 rfaP1 XI S.11<{1} nNha\rAwti Tr llal CALL BEFORE YOU DIG P'•'"4f°"'•'I0 1-800-245-4545T.RP.r_Rr,NI rir b8N%mkrz Fvlm 48 HOURS NOTICE REQUIRED / / DESCRIPTION g6, 5 P1� 1� CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. \S1! CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT, WORTH WATER, SANITARY AND STORM SEWER LINES NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON WATER, SANITARY AND STORM SEWER LINES NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR BY APVD DATE PROJECT:PROJECT PKWY. 360 NETWORI<��r�r�� ® COPPELL, TX znrze9 PLAN SHEET VORVAnav al THS ooauclrt DRAWN G%T MG NO. Ncv rs vRovwrruD.u.o DW Lnr APPY 7AY299_FREEPORT_360_NETYMK_P_014.DWG - _ _ ar used, ewc„. Ncvaooueen ue — asttosro n rq OR 4N vAvr _ mnaur rrtnrtrN coNsrlrt OF umarn SHEET 014 OF 021 APPROVED ORIGINAL ISSUE 05 /21 18 It FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS I COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE UNE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET I COUNTY ROAD INTERSECTIONS, DESCRIPTION 144ct FIBER OPTIC CABLE (AERIAL) 144ct FIBER OPTIC CABLE (RISER) 144ct FIBER OPTIC CABLE NEW (U/G) 6M STRAND 1-4" GALV, U -GUARD E/W 2-1.25" HDPE DOWN GUY & ANCHOR TRENCH 4-2" HDPE DIR. BORE 4-2" HDPE DIR. BORE 1-41' HDPE 1-1" HDPE 1 -MULE TAPE 1.25" HDPE 10GA TRACER WIRE 3'X5'X4' MH PULL CABLE THRU EXIST. AT&T CONDUIT PULL CABLE THRU EXIST. ZAYO CONDUIT CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION UN - sµ'I' FT - (n EA FT LF _ / - - i - LF - IX1 SLACK COIL IN HH/MH FT EXCAVATE & EXPOSE IT QUANTITY �0 FT CID FT 444 FT SF REMOVE & RESTORE CONCRETE PAVEMENT SF REMOVE & RESTORE ASPHALT PAVEMENT SF 144ct FIBER OPTIC CABLE (TOTAL) FT DALLAS COUNTY COPPLLL, TX CAUTION!!I EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. STA 163+54 TO STA 187+98 � � PULL O (444') OF 144ct FIBER OPTIC CABLE ' ^ . > L THRU EXIST, ZAYO CONDUIT AND Q i Z 1 REMOVE -144 FIBER OPTIC CABLE Q 0 U v U G i N � _ Know, wha`t's beellowr Call before you dig. — ExcelEm►ic wRlwclDlc 444 REV DESCRIPTION BY APVD DATE IINP �.1nprM Nu4tArc{]! CALL BEFORE YOU DIG 1-800-245-4545 rner_N:.'i'.irr mwa,e,r: &92M,xa 444 48 HOURS NOTICE REQUIRED - - - D .—�--- — PROP. WATER LINE :. SEWS �R W �E E. 0 �E CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION k` NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT, WORTH WATER, SANITARY AND STORM SEWER LINES NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON WATER, SANITARY AND STORM SEWER LINES NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT, IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR, PNaccr PORT PKWY. 360 NETWORK nso.¢vnrpN wl rws DocvvEert 5 PROP2EIAY! A'.D sNHL I:01 DE USED, COPED, EAtOpIKED ON DSCLOSED PI MiKKE OR iN PA¢i N1i1gUE mnrtEel consErrt a cvuaEn ZAY299 caoc: COPPELL, TXLY PLAN SHEET GXT _ ZAY299_FREEPORT_360_NET11'ORH_P_015.DWG - 5 OF 021 APPROVED ORIGINAL ISSUE 05/21/18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE U OF DRAWINGS THAT THE NE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, �E- — —E— E wa E E E —E � DESCRIPTION 1-4" CORE BORE EA — SLACK UNIT QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 590 6M STRAND FT — 1-4" GALV, U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — OVERHEAD GUY FT — AERIAL SLACK LOOP FT — TRENCH 4-2" HDPE LF — DIR. BORE 4-2" HDPE LF — DIR. BORE 1-4" HDPE CASING LF 1-1" HDPE FT — 1 —MULE TAPE FT — 1.25" HDPE FT — 10GA TRACER WIRE FT — 36"X60"48" HH EA — 3'X5'X4' MH EA — PULL CABLE THRU EXIST. AT&T CONDUIT FT — PULL CABLE THRU EXIST. ZAYO CONDUIT FT 590 COIL IN HH/MH FT — EXCAVATE & EXPOSE SF — REMOVE & RESTORE CONCRETE PAVEMENT SF — REMOVE & RESTORE ASPHALT PAVEMENT SF — 144ct FIBER OPTIC CABLE (TOTAL) FT 590 CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION 54' RCP DALLAS COUNTY COPPELL, TX STA 163+54 TO STA 167+98 PULL (590') OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1.144 FIBER OPTIC CABLE 3\ CALL BEFORE YOU DIG I-000-245-4545 40 HOURS NOTICE REQUIRED IIH fi.t.lnp4 N.W. SMle�it RkY.Nuti TC ISMI PIne:IN.Yf.1161 P.a: blJlISIN T.LLP.L 14�Inn1iM \1Mar: F11i0 E u ,� W FREEPORT PKWY. (CONCRETE) Oa NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT. WORTH WATER, SANITARY AND STORM SEWER LINES i ' CAUTION!!! 3 EXIST, BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER 81 STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT Z LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, W SCALE t"=40' CAUTION !III / W CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES a'L^ PRIOR TO CONSTRUCTION Lu �r zlx _Luo o z � f b� I / m o 0 W RCPLLJ c Riw cric� sc6I� _ cciC.� �� _iclr. _ _ cc�c_ _ w 172+00 173+00 U) w w U) ❑ O 0+00 IV ❑ M 00 ti Q W �a w Z oil \E a a a F u P \ ao Know, what's belOW. Call before you dig. WATER NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON , SANITARY AND STORM SEWER LINES REV DESCRIPTION BY APVD DATE NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. Pxweer cone: FREEPORT PKWY. 360 NETWORK znvzee COPPELL, TX PLAN SHEET ec usco, croco. RCPmia,cco uR IAPPV — I<nl<oo_inur vnl_.:vv nu nvnn_ _vro.wro _ auiosco nl n,wlt a: m Pu,r mnaur wa nol canclR cv cawarx SHEET 016 OF 021 APPROVED ORIGINAL ISSUE 05/21/18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR, IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, DESCRIPTION � UNIT � QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT - 144ct FIBER OPTIC CABLE (RISER) FT - 144ct FIBER OPTIC CABLE NEW (U/G) FT 529 6M STRAND FT - 1-4" GALV. U -GUARD E/W 2-1.25" HDPE FT - DOWN GUY & ANCHOR EA - OVERHEAD GUY FT - AERIAL SLACK LOOP FT - TRENCH 4-2" HDPE LF - DIR. BORE 4-2" HDPE LF - DIR. BORE 1-4" HDPE CASING LF 1-1" HDPE FT - 1 -MULE TAPE FT - 1.25" HDPE FT - 10GA TRACER WIRE FT - 36"X60"48" HH EA - 3'X5'X4' MH - PULL CABLE THRU EXIST, AT&T CONDUIT - PULL CABLE THRU EXIST, ZAYO CONDUIT 529 1-4" CORE BORE ISF - SLACK COIL IN HH/MH - EXCAVATE & EXPOSE - REMOVE & RESTORE CONCRETE PAVEMENT - REMOVE & RESTORE ASPHALT PAVEMENT SF - 144ct FIBER OPTIC CABLE (TOTAL) FT 529 CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION CALL BEFORE YOU DIG 1-800-245-4545 a8 HOURS NOTICE REQUIRED DALLAS COUNTY COPPLLL, TX STA 173+88 TO STA 179+17 PULL (529) OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE FREEPORT PKWY. (CONCRETE) NOTE: CONTRACTOR MUST MAINTAIN 3' SEPARATION FROM ALL CITY OF FORT. WORTH WATER, SANITARY AND STORM SEWER LINES CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CAN, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION NOTE: CONTRACTOR MUST MAINTAIN 2' SEPARATION FROM ALL CITY OF ARLINGTON WATER, SANITARY AND STORM SEWER LINES Know what's below. 0211 hefore you dig. NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. ITIS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. "�iBx C0N1�0R _ Pxa[cr: PRaccr caa: REv DESCRIPTION BY APVD DATE FREEPOR7 PKWY, Arapato Pe.�r. N9,4tflsr ® 360 NETWORK COPPELL, TX ZAY299 PLAN SHEET rs PRJPIRET/iM uro s:uu Ror r£ usrn, Ta REPM W P T rnn x�wrro: coRsort�owv Pr�rn DRAWN GXT APPY — pyp NP. ZAY299}REEPORI_360�lETWORK3_ 017.DWG RCV - SHEET 017 OF 021 APPROVED ORIGINAL ISSUE OS 21 18 NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, DESCRIPTION CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPLLL, TX STA 179+17 TO STA 184+47 \pGQ`� �— PULL (530') OF 144ct FIBER OPTIC CABLE O THRU EXIST, ZAYO CONDUIT AND O\ i- REMOVE 1=144 FIBER OPTIC CABLE �G w w Cn W W (0 180+00 �� � � � � � � � � � � 181+00 1 +00 _ — — _ .............................................................1.1...11.......... 3+00 ...........................................................................................................................1111........................... ------ 184+00 CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT Z LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, SCALE 1"=40 CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION 144ct FIBER OPTIC CABLE 144ct FIBER OPTIC CABLE NEW (U/G) 6M STRAND 1-4" GALV. U -GUARD E/W 2-1.25" HDPE DOWN GUY & ANCHOR DIR. BORE 4-2" HDPE DIR. BORE 1-4" HDPE 1-1" HDPE 1 -MULE TAPE 1.25" HDPE 10GA TRACER WIRE PULL CABLE THRU EXIST. SLACI< COIL IN HH/N EXCAVATE &EXPOSE 44ct FIBER OPTIC CABLE UNIT I QUANTITY 530 530 CALL BEFORE YOU DIG — I-aoo-zas-rias 530 48 HGURS NOTICE REGUIRED Lu O r O W W 2 W (n a N ti �t ao a w z J 2 U a Know what's belOW. CB�� before you dlg. NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR, rxarcr: rawcci moe: REV DESCRIPTION RY APVD DATE FREEPORT PKWY, u>•s nnowV �•.4 s.wem aa.ti.. nxrw: ® 360 NETWORK COPPELL, TX ZAY299 PLAN SHEET — _ _— _ rHs D0OA1ENr PIMPE HOi 5 A40 SM1WL a uscu. CtoxoD . uvmidrtm ax oattoseo ry m� oa w owr DRAWN G%T APPV — ZAY299JREEPORT_3601JETWORK3_OiS.DWG _ - _ NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS I COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, D Ll Ll 2 Ll W 0 QO N 00 F— w z J U DESCRIPTION CONTRACTOR: IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION 185+00 186+00 UNIT I QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — 144ct FIBER OPTIC CABLE (RISER) FT — 144ct FIBER OPTIC CABLE NEW (U/G) FT 529 6M STRAND FT — 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — OVERHEAD GUY FT — AERIAL SLACK LOOP FT — TRENCH 4-2" HDPE LF — DIR. BORE 4-2" HDPE LF — nIR nr1RC 1-d" wnPF recwr. I LF 1—MULE TAPE 7.25" HDPE tOGA TRACER WIRE 36"X60"48" HH 3�WX4' MH SLACK COIL IN HH/MH EXCAVATE &EXPOSE REMOVE & RESTORE CONCRETE PAVEMENT REMOVE & RESTORE ASPHALT PAVEMENT 144ct FIBER OPTIC CABLE (TOTAL) 529 0 CALL BEFORE YOU DIG — 1-800-245-4545 48 HOURS NOTICE REQUIRED DALLAS COUNTY COPPLLL, TX STA 184+47 TO STA 189+76 PULL (529') OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE 187+00 188+00 FREEPORT PKWY. (CONCRETE) CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER 8 STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION Know what's below, 0811 before you dig. NOTE; UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION, COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. Ma,E � ra�M � REV DESCRIPTION BY APVD DATE FREEPORT PKWY. 360 NETWORK � 0 COPPELL, TX zAY299 11w an A..P.w Rr4RMrcfss — — — PLAN SHEET R44Nra TC tf011 — — ly RO-OWtOR ON MS DDauurt DRAWN GXT owv xo: n TIIP.L Re{LI YY.Men F11M — — — — — 5 y WT ZAY299}itEEPORT_360—lETWORK�_OI9.DHG — K u , carom. Rcarowicm M APPV — mr wwrtv+ca:surtm0r Pcwrn SHEET 019 OF 021 APPROVED ORIGINAL ISSUE 05 21 18 m. NOTE: FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET / COUNTY ROAD INTERSECTIONS, DESCRIPTION 144ct FIBER OPTIC CABLE CONTRACTOR: ITIS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION DALLAS COUNTY COPPLLL, TX STA 189+76 TO STA 195+06 PULL (530') OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND REMOVE 1-144 FIBER OPTIC CABLE CAUTION!!I EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION N O 190+00 191+00 I I 192+00 193+00 LL] 144ct FIBER OPTIC CABLE NEW (U/G) 6M STRAND 1 -4" GALV. U -GUARD E/W 2-1.25" HDPE DOWN GUY & ANCHOR DIR. BORE 4-2" HDPE DIR. BORE 1-4" HDPE 1-1" HDPE 1-MVLG Ir�rr 1.25" HDPE tOGA TRACER WIRE PULL CABLE THRU EXIST. PULL CABLE THRU EXIST. 1-4" CORE BORE SLACI( COIL IN HH/MH EXCAVATE & EXPOSE ra 1 CABLE PAVEMENT UNIT I QUANTITY 7i F FREEPORT PKWY. (CONCRETE) — momma o aNTPACM e 530 REV DESCRIPTION BY APVD DATE zayof IIHI xAnpi. Pro GluiU — — — — CALL BEFORE YOU DIG ^°""fJ4LS6 - 1-800-245-4545 t.U.�.1_Pei4ln.b. MnOrr. FAN 48 HOURS NOTICE REQUIRED — — — P�ih�scP Know what's below. Call before you dig. NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR, raoxcr cac: FREEPORT PKWY, 360 NETWORK zAY2ee COPPELL, TX PLAN SHEET a PROP"E`w"' "'° � NOT ZAY299}TIEEPORT_3601JETWORK�_020.0 - a uun, covco. �scAaauw ort APPV — mnu�ur���+ma�rsort�� ��+ SHEET 020 OF 021 APPROVED ORIGINAL ISSUE 05/21/18 NOTE: CONTRACTOR: D A L L A S COUNTY FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTING IT IS YOUR RESPONSIBILITY TO CALL THE TxDOT INSPECTOR ' STREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OF 48 HOURS PRIOR TO START OF CONSTRUCTION C 0 P P E LL, TX DESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGE I OF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGER BORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. IN ADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET/ ' COUNTY ROAD INTERSECTIONS, STA 195+06 TO STA 197+00 I PULL (194') OF 144ct FIBER OPTIC CABLE THRU EXIST, ZAYO CONDUIT AND I REMOVE 1=144 FIBER OPTIC CABLE I STA 197+00 I EXIST, ZAYO HH O PLACE 100' SLACK COIL I N O ' L W W W------------------------ LLI 196+00 197+00 U) O q} Iv Io O Ln rn Q U) W z J U H Q I DESCRIPTION I UNIT I QUANTITY 144ct FIBER OPTIC CABLE (AERIAL) FT — I YYI:I ripGR Vrlll. l./ipLL kRIJLR) — 144ct FIBER OPTIC CABLE NEW (U/G) FT CALL BEFORE YOU DIG 1-800-245-4545 48 HOURS NOTICE REQUIRED REV DESCRIPTION BY APVD DATE IIH Pan. aAma X7M I Gee.0 Ane:MLLSIIN — — — ay — mbntnW1glSSIN — T.LLP.LPaYaMan F11M CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION 198+00 \ 199+00 FREEPORT PKWY. (CONCRETE) PPOJECT: PNOJ[CT CODF. FREEPORT PKWY. 360 NETWORK znY2se COPPELL, TX GXT PLAN SHEET 194 6M STRAND FT — 1-4" GALV. U—GUARD E/W 2-1.25" HDPE FT — DOWN GUY & ANCHOR EA — OVERHEAD GUY FT — AERIAL SLACK LOOP FT — TRENCH 4-2" HDPE LF — DIR. BORE 4-2" HDPE LF — AR. BORE 1-4" HDPE CASING LF 1-1" HDPE FT — 1—MULE TAPE FT — 1.25" HDPE FT — tOGA TRACER WIRE FT — 36"X60"48" HH EA — 3'X5'X4' MH EA — PULL CABLE THRU EXIST. AT&T CONDUIT FT — PULL CABLE THRU EXIST, ZAYO CONDUIT FT 194 1-4" CORE BORE EA — SLACK COIL IN HH/MH FT 100 EXCAVATE & EXPOSE SF — REMOVE & RESTORE CONCRETE PAVEMENT SF — REMOVE & RESTORE ASPHALT PAVEMENT SF — 144ct FIBER OPTIC CABLE (TOTAL) FT 294 CALL BEFORE YOU DIG 1-800-245-4545 48 HOURS NOTICE REQUIRED REV DESCRIPTION BY APVD DATE IIH Pan. aAma X7M I Gee.0 Ane:MLLSIIN — — — ay — mbntnW1glSSIN — T.LLP.LPaYaMan F11M CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING, CAUTION 1111 CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION 198+00 \ 199+00 FREEPORT PKWY. (CONCRETE) PPOJECT: PNOJ[CT CODF. FREEPORT PKWY. 360 NETWORK znY2se COPPELL, TX GXT PLAN SHEET