Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST1501A-CS181025 (2)
Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: C-1 1 LS 790,000.00 $790,000.00 0.9 $711,000.00 $711,000.00 90.0%$79,000.00 C-2 2 EA 1,000.00 $2,000.00 2 $2,000.00 $2,000.00 100.0% C-3 1 LS 20,500.00 $20,500.00 0.05 0.35 $1,025.00 $7,175.00 $7,175.00 35.0%$13,325.00 C-4 1 EA 4,300.00 $4,300.00 1 $4,300.00 $4,300.00 100.0% C-5 1 LS 100,000.00 $100,000.00 0.05 0.35 $5,000.00 $35,000.00 $35,000.00 35.0%$65,000.00 C-6 1 LS 390,000.00 $390,000.00 0.05 0.54 $19,500.00 $210,600.00 $210,600.00 54.0%$179,400.00 C-7 67 STA 22,500.00 $1,507,500.00 33.5 $753,750.00 $753,750.00 50.0%$753,750.00 C-8 44,697 SY 4.15 $185,492.55 155.54 18647.576 $645.49 $77,387.44 $77,387.44 41.7%$108,105.11 C-9 20 SY 31.00 $620.00 $620.00 C-10 11 EA 410.00 $4,510.00 7 $2,870.00 $2,870.00 63.6%$1,640.00 C-11 26,000 CY 18.75 $487,500.00 11380.09 $213,376.69 $213,376.69 43.8%$274,123.31 C-12 1 EA 50,000.00 $50,000.00 $50,000.00 C-13 4,910 LF 5.00 $24,550.00 $24,550.00 C-14 12 EA 8,800.00 $105,600.00 $105,600.00 C-15 12 EA 2,150.00 $25,800.00 $25,800.00 C-16 420 LF 28.00 $11,760.00 70 $1,960.00 $1,960.00 16.7%$9,800.00 C-17 1 EA 1,875.00 $1,875.00 $1,875.00 C-18 7 EA 1,120.00 $7,840.00 $7,840.00 C-19 7 EA 1,075.00 $7,525.00 1 $1,075.00 $1,075.00 14.3%$6,450.00 C-20 24 LF 128.00 $3,072.00 $3,072.00 C-21 10 LF 130.00 $1,300.00 $1,300.00 C-23 708 LF 62.00 $43,896.00 $43,896.00 C-24 87 LF 71.00 $6,177.00 70 $4,970.00 $4,970.00 80.5%$1,207.00 C-26 844 LF 101.00 $85,244.00 $85,244.00 C-27 3 EA 6,100.00 $18,300.00 $18,300.00 C-28 8 EA 7,800.00 $62,400.00 $62,400.00 C-29 1 EA 9,000.00 $9,000.00 $9,000.00 C-32 40 LF 46.50 $1,860.00 22 $1,023.00 $1,023.00 55.0%$837.00 C-34 40 LF 33.00 $1,320.00 $1,320.00 C-35 55 LF 27.50 $1,512.50 $1,512.50 C-36 6 EA 3,200.00 $19,200.00 $19,200.00 C-37 30 LF 89.00 $2,670.00 $2,670.00 C-38 258 LF 177.00 $45,666.00 $45,666.00 C-39 1,673 LF 1.00 $1,673.00 70 $70.00 $70.00 4.2%$1,603.00 C-43 285 LF 36.00 $10,260.00 88 88 $3,168.00 $3,168.00 $3,168.00 30.9%$7,092.00 C-44 370 LF 29.00 $10,730.00 370 370 $10,730.00 $10,730.00 $10,730.00 100.0% C-45 2,290 LF 33.00 $75,570.00 150.42 150.42 $4,963.86 $4,963.86 $4,963.86 6.6%$70,606.14 C-46 289 LF 96.00 $27,744.00 30 129 $2,880.00 $12,384.00 $12,384.00 44.6%$15,360.00 C-47 822 LF 87.00 $71,514.00 9 499 $783.00 $43,413.00 $43,413.00 60.7%$28,101.00 C-48 261 LF 64.50 $16,834.50 255 $16,447.50 $16,447.50 97.7%$387.00 C-49 5,164 LF 76.00 $392,464.00 3061 $232,636.00 $232,636.00 59.3%$159,828.00 C-50 1,472 LF 180.00 $264,960.00 530 1442 $95,400.00 $259,560.00 $259,560.00 98.0%$5,400.00 ABANDON EXISTING 16" WATER LINE (IN PLACE) 6" PVC CLASS 200 DR-14 WATER LINE 8" PVC CLASS 200 DR-14 WATER LINE 12" PVC CLASS 150 DR-18 WATER LINE 16" PVC CLASS 150 DR-18 WATER LINE 20" PVC CLASS 150 DR-18 WATER LINE 18" DRILLED SHAFT PIER AND CAP FOR AERIAL SEWER ADDITIONAL DEPTH FOR AERIAL SEWER CROSSING PIERS 20" STRUCTURAL STEEL CASING FOR AERIAL SEWER CRO TRENCH SAFETY FOR SANITARY SEWER IMPROVEMENTS (U ABANDON EXISTING 8" WATER LINE (IN PLACE) ABANDON EXISTING 12" WATER LINE (IN PLACE) 4' DIAMETER STANDARD SANITARY SEWER MANHOLE 5' DIAMETER STANDARD SANITARY SEWER MANHOLE 5' DIAMETER DROP SANITARY SEWER MANHOLE 21" PVC ENCASEMENT FOR SANITARY SEWER PIPE CONCRETE ENCASEMENT FOR SANITARY SEWER CEMENT STABILIZED BACKFILL FOR SANITARY SEWER CONNECT TO EXISTING SANITARY SEWER PIPE 6" PVC SDR-26 SANITARY SEWER PIPE 8" PVC SDR-26 SANITARY SEWER PIPE 12" PVC SDR-26 SANITARY SEWER PIPE 15" PVC SDR-26 SANITARY SEWER PIPE 24" PVC PS-115 SANITARY SEWER PIPE SANITARY SEWER MAIN/MANHOLE CLEANING SANITARY SEWER MANHOLE REHABILITATION (RAVEN COA SANITARY SEWER MANHOLE REHABILITATION (CONE REPL REMOVE SANITARY SEWER PIPE ABANDON EXISTING SANITARY SEWER MANHOLE REMOVE EXISTING SANITARY SEWER MANHOLE RIGHT-OF-WAY PREPARATION REMOVE & DISPOSE OF EXISTING CONCRETE PAVEMENT REMOVE & DISPOSE OF EXISTING ASPHALT PAVEMENT REMOVE & DISPOSE OF STREET LIGHT UNCLASSIFIED EXCAVATION CITY MONUMENT MOBILIZATION PROJECT SIGN PROJECT COMMUNICATION PRE-PROJECT VIDEO SURVEY FURNISH, INSTALL, MAINTAIN AND REMOVE EROSION CO FURNISH, INSTALL AND MAINTAIN TEMPORARY TRAFFIC Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 1 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F C-51 8 LF 262.00 $2,096.00 $2,096.00 C-52 4 EA 4,500.00 $18,000.00 $18,000.00 C-53 10 EA 5,500.00 $55,000.00 3 $16,500.00 $16,500.00 30.0%$38,500.00 C-54 4 EA 5,800.00 $23,200.00 2 $11,600.00 $11,600.00 50.0%$11,600.00 C-55 19 EA 1,300.00 $24,700.00 2 12 $2,600.00 $15,600.00 $15,600.00 63.2%$9,100.00 C-56 16 EA 1,600.00 $25,600.00 1 13 $1,600.00 $20,800.00 $20,800.00 81.3%$4,800.00 C-57 8 EA 2,700.00 $21,600.00 9 $24,300.00 $24,300.00 112.5%-$2,700.00 C-58 17 EA 11,000.00 $187,000.00 14 $154,000.00 $154,000.00 82.4%$33,000.00 C-59 5 EA 21,500.00 $107,500.00 3 5 $64,500.00 $107,500.00 $107,500.00 100.0% C-60 29 EA 1,050.00 $30,450.00 12 $12,600.00 $12,600.00 41.4%$17,850.00 C-63 19 EA 3,700.00 $70,300.00 4 15 $14,800.00 $55,500.00 $55,500.00 78.9%$14,800.00 C-64 18 EA 1,100.00 $19,800.00 6 10 $6,600.00 $11,000.00 $11,000.00 55.6%$8,800.00 C-65 21 TON 2,000.00 $42,000.00 1.52 11.6505 $3,040.00 $23,301.00 $23,301.00 55.5%$18,699.00 C-67 20 LF 78.00 $1,560.00 20 $1,560.00 $1,560.00 100.0% C-68 235 LF 134.00 $31,490.00 235 $31,490.00 $31,490.00 100.0% C-69 102 LF 560.00 $57,120.00 $57,120.00 C-70 2 EA 7,000.00 $14,000.00 2 $14,000.00 $14,000.00 100.0% C-71 1 EA 13,000.00 $13,000.00 $13,000.00 C-72 1 EA 5,000.00 $5,000.00 1 $5,000.00 $5,000.00 100.0% C-73 797 SY 116.00 $92,452.00 $92,452.00 C-74 8,016 LF 1.00 $8,016.00 569 5386 $569.00 $5,386.00 $5,386.00 67.2%$2,630.00 C-75 1,200 LF 27.00 $32,400.00 $32,400.00 C-76 150 EA 360.00 $54,000.00 $54,000.00 C-77 100 CY 39.00 $3,900.00 $3,900.00 C-78 9 EA 1,200.00 $10,800.00 $10,800.00 C-79 20 EA 1,200.00 $24,000.00 $24,000.00 C-80 1 EA 1,200.00 $1,200.00 $1,200.00 C-81 1 EA 1,200.00 $1,200.00 $1,200.00 C-82 1 EA 1,200.00 $1,200.00 $1,200.00 C-83 1 EA 550.00 $550.00 $550.00 C-84 2 EA 275.00 $550.00 $550.00 C-85 1 EA 550.00 $550.00 $550.00 C-86 255 LF 25.00 $6,375.00 $6,375.00 C-87 169 LF 14.50 $2,450.50 $2,450.50 C-88 45 LF 3.80 $171.00 $171.00 C-89 202 LF 11.50 $2,323.00 $2,323.00 C-90 10 LF 17.00 $170.00 $170.00 C-91 10 LF 17.00 $170.00 $170.00 C-92 10 LF 21.25 $212.50 $212.50 C-93 75 LF 3.80 $285.00 $285.00 C-94 30 LF 5.70 $171.00 $171.00 C-95 10 LF 17.00 $170.00 $170.00 REMOVE EXISTING 30" RCP STORM DRAIN REMOVE EXISTING 33" RCP STORM DRAIN REMOVE EXISTING 36" RCP STORM DRAIN REMOVE EXISTING 42" RCP STORM DRAIN REMOVE EXISTING 54" RCP STORM DRAIN REMOVE EXISTING 60" RCP STORM DRAIN REMOVE EXISTING 27" HEADWALL REMOVE EXISTING 54" HEADWALL REMOVE EXISTING 18" RCP STORM DRAIN REMOVE EXISTING 21" RCP STORM DRAIN REMOVE EXISTING 24" RCP STORM DRAIN REMOVE EXISTING 27" RCP STORM DRAIN REMOVE EXISTING SMALL CURB INLET (4' - 8') REMOVE EXISTING LARGE CURB INLET (10'12') REMOVE EXISTING Y-INLET REMOVE EXISTING 4' X 4' MANHOLE REMOVE EXISTING 6' X 6' MANHOLE REMOVE EXISTING 21" HEADWALL BLOW-OFF VALVE (TYPE 1) PERMANENT REINFORCED CONCRETE PAVEMENT REPAIR (W TRENCH SAFETY FOR WATER LINE IMPROVEMENTS STORM DRAIN CLEANING AND TELEVISION INSPECTION DENSITY TESTING OF EXISTING BACKFILL EXCAVATE AND RE-COMPACT EXISTING TRENCH BACKFILL WATER LINE DUCTILE IRON FITTINGS 24" PVC ENCASEMENT FOR WATER LINE 24" STEEL ENCASEMENT FOR WATER LINE 24" BORE & STEEL ENCASEMENT FOR WATER LINE 2" AIR RELEASE VALVE (TYPE 1) 4" AIR RELEASE VALVE (TYPE 2) 12" GATE VALVES 16" GATE VALVES 20" GATE VALVES CONNECT TO EXISTING WATER LINE STANDARD FIRE HYDRANT ASSEMBLY REMOVE EXISTING FIRE HYDRANT 24" PVC CLASS 150 DR-18 WATER LINE 1" IRRIGATION WATER SERVICE & METER 2" DOMESTIC WATER SERVICE & METER 2" IRRIGATION WATER SERVICE & METER 6" GATE VALVES 8" GATE VALVES EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 2 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F C-96 15 LF 11.50 $172.50 $172.50 C-97 12 LF 17.00 $204.00 $204.00 C-98 16 LF 268.00 $4,288.00 $4,288.00 C-99 104 LF 123.00 $12,792.00 $12,792.00 C-100 231 LF 99.00 $22,869.00 $22,869.00 C-101 59 LF 102.00 $6,018.00 $6,018.00 C-102 160 LF 142.00 $22,720.00 $22,720.00 C-103 10 LF 448.00 $4,480.00 $4,480.00 C-104 10 LF 410.00 $4,100.00 $4,100.00 C-106 75 LF 203.00 $15,225.00 $15,225.00 C-107 45 LF 432.00 $19,440.00 $19,440.00 C-108 10 LF 952.00 $9,520.00 $9,520.00 C-109 15 LF 700.00 $10,500.00 $10,500.00 C-110 16 LF 855.00 $13,680.00 $13,680.00 C-111 11 EA 4,700.00 $51,700.00 $51,700.00 C-112 2 EA 8,300.00 $16,600.00 $16,600.00 C-113 14 EA 9,700.00 $135,800.00 $135,800.00 C-114 2 EA 12,000.00 $24,000.00 $24,000.00 C-115 1 EA 8,500.00 $8,500.00 $8,500.00 C-116 2 EA 15,000.00 $30,000.00 $30,000.00 C-117 1 EA 4,200.00 $4,200.00 $4,200.00 C-118 2 EA 4,500.00 $9,000.00 $9,000.00 C-119 1 EA 7,100.00 $7,100.00 $7,100.00 C-120 4 EA 1,300.00 $5,200.00 $5,200.00 C-121 3 EA 700.00 $2,100.00 $2,100.00 C-122 936 LF 1.00 $936.00 $936.00 C-123 1 LS 10,000.00 $10,000.00 0.05 0.6 $500.00 $6,000.00 $6,000.00 60.0%$4,000.00 C-124 50,049 SY 14.75 $738,222.75 $738,222.75 C-125 42,526 SY 75.00 $3,189,450.00 $3,189,450.00 C-126 2,687 SY 75.00 $201,525.00 $201,525.00 C-127 1,575 SY 113.00 $177,975.00 $177,975.00 C-128 1,758 SY 78.00 $137,124.00 $137,124.00 C-129 47,528 SF 5.00 $237,640.00 $237,640.00 C-130 31,046 SF 6.00 $186,276.00 $186,276.00 C-131 13 SY 113.00 $1,469.00 $1,469.00 C-132 431 SY 85.00 $36,635.00 $36,635.00 C-133 280 SY 156.00 $43,680.00 $43,680.00 C-135 980 SF 114.50 $112,210.00 $112,210.00 C-136 795 LF 72.00 $57,240.00 $57,240.00 C-137 325 LF 25.00 $8,125.00 $8,125.00 C-138 4 EA 1,950.00 $7,800.00 $7,800.00 C-139a 2 EA 518.75 $1,037.50 $1,037.50 TXDOT TYPE 7 PEDESTRIAN RAMP CONCRETE RETAINING WALL INTEGRAL W/ SIDEWALK OR TXDOT TYPE E PEDESTRIAN HANDRAIL TXDOT METAL BEAM GUARD FENCE METAL BEAM GUARD FENCE TRANSITION METAL BEAM GUARD RAIL END TREATMENT (MBGF-11) 11" REINFORCED STAMPED CONCRETE PAVEMENT 6" REINFORCED STAMPED CONCRETE IN MEDIANS 10' WIDE HIKE/BIKE TRAIL - 6" REINFORCED CONCRET 4" REINFORCED CONCRETE SIDEWALK (ALL WIDTHS) TXDOT TYPE 2 PEDESTRIAN RAMP TXDOT TYPE 3 PEDESTRIAN RAMP ADJUST EXISTING RCP MITER SLOPE TO GRADE TRENCH SAFETY FOR DRAINAGE IMPROVEMENTS RAILROAD CROSSING COORDINATION 4" ASPHALT (HMAC) BASE LAYER ON 6" COMPACTED SUB 11" REINFORCED CONCRETE STREET PAVEMENT (NO. 6 B 11" REINFORCED CONCRETE DRIVEWAY PAVEMENT (NO. 3 4' X 4' STORM MANHOLE 6' X 6' STORM MANHOLE 21" TXDOT TYPE CH-FW-0 HEADWALL 27" TXDOT TYPE CH-FW-0 HEADWALL 54" TXDOT TYPE CH-FW-0 HEADWALL ADJUST EXISTING STORM MANHOLE RIM TO GRADE 66" REINFORCED CONCRETE PIPE STORM DRAIN 8' X 5' REINFORCED CONCRETE BOX STORM DRAIN 10' RECESSED CURB INLET 15' STANDARD CURB INLET 15' RECESSED CURB INLET 20' RECESSED CURB INLET 27" REINFORCED CONCRETE PIPE STORM DRAIN 30" REINFORCED CONCRETE PIPE STORM DRAIN 33" REINFORCED CONCRETE PIPE STORM DRAIN 42" REINFORCED CONCRETE PIPE STORM DRAIN 54" REINFORCED CONCRETE PIPE STORM DRAIN 60" REINFORCED CONCRETE PIPE STORM DRAIN REMOVE EXISTING 66" RCP STORM DRAIN REMOVE EXISTING 72" RCP STORM DRAIN REMOVE EXISTING 8' X 5' RCB STORM DRAIN 18" REINFORCED CONCRETE PIPE STORM DRAIN 21" REINFORCED CONCRETE PIPE STORM DRAIN 24" REINFORCED CONCRETE PIPE STORM DRAIN EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 3 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F C-139b 2 EA 3,350.00 $6,700.00 $6,700.00 C-140 117 CY 446.00 $52,182.00 $52,182.00 C-141 1,000 LF 12.25 $12,250.00 $12,250.00 C-142 1 LS 182,000.00 $182,000.00 0.03 0.2 $5,460.00 $36,400.00 $36,400.00 20.0%$145,600.00 C-143 67 STA 3,590.00 $240,530.00 $240,530.00 C-144 6,735 SF 5.96 $40,140.60 $40,140.60 C-145 69 EA 375.00 $25,875.00 $25,875.00 C-146 1 LS 5,250.00 $5,250.00 $5,250.00 C-147 62 STA 160.00 $9,920.00 $9,920.00 C-148 2,287 EA 3.75 $8,576.25 $8,576.25 C-149 1 EA 3,500.00 $3,500.00 $3,500.00 C-150 4 EA 8,000.00 $32,000.00 4 $32,000.00 $32,000.00 100.0% B-1 512 CY 110.00 $56,320.00 $56,320.00 B-2 164 LF 61.00 $10,004.00 $10,004.00 B-3 1,076 LF 128.00 $137,728.00 164.5 $21,056.00 $21,056.00 15.3%$116,672.00 B-4 119 CY 900.00 $107,100.00 $107,100.00 B-5 134 CY 1,200.00 $160,800.00 $160,800.00 B-6 26,780 SF 18.00 $482,040.00 $79,238.21 $79,238.21 16.4%$402,801.79 B-7 227 CY 500.00 $113,500.00 $113,500.00 B-8 3,360 LF 154.00 $517,440.00 $517,440.00 B-9 473 CY 104.00 $49,192.00 $49,192.00 B-10 260 CY 90.00 $23,400.00 $23,400.00 B-11 478 LB 15.00 $7,170.00 $7,170.00 B-12 1,048 LF 300.00 $314,400.00 $314,400.00 B-13 174 LF 75.00 $13,050.00 $13,050.00 B-14 1 LS 200,000.00 $200,000.00 0.5 $100,000.00 $100,000.00 50.0%$100,000.00 B-15 4,570 SF 9.00 $41,130.00 $41,130.00 B-16 7,857 SF 7.00 $54,999.00 $54,999.00 L-1 1,880 LF 20.00 $37,600.00 $37,600.00 L-2 147 SF 11.44 $1,681.68 $1,681.68 L-3 532 LF 6.60 $3,511.20 $3,511.20 L-4 23 EA 50.45 $1,160.35 $1,160.35 L-5 14 EA 50.45 $706.30 $706.30 L-6 22 EA 50.45 $1,109.90 $1,109.90 L-7 5 EA 50.51 $252.55 $252.55 L-8a 2,421 SF 18.00 $43,578.00 $43,578.00 L-8b 1,928 SF 11.00 $21,208.00 $21,208.00 L-9 4 EA 1,065.50 $4,262.00 $4,262.00 L-10 13 EA 897.00 $11,661.00 $11,661.00 L-11 19 EA 355.00 $6,745.00 $6,745.00 L-12 31 EA 253.00 $7,843.00 $7,843.00 L-13 86 EA 12.20 $1,049.20 $1,049.20 COLORED CONCRETE - RE CIVIL, SIM ALLEE ELM - 100 GAL. CHINKAPIN OAK - 100 GAL. CRAPE MYRTLE 'RED ROCKET' - 30 GAL. TEXAS REDBUD - 30 GAL. TEXAS SAGE 'THUNDER CLOUD' - 5 GAL. DRY RIVER BED STACKED CHOPPED LEUDER EDGE (2 COU BOULDER TYPE A (24"L X 14"W X 18"H) BOULDER TYPE B (18"L X 12"W X 14"H) BOULDER TYPE C (10"L X 12"W X 20"H) BOULDER TYPED (12"L X 14"W X 18"H) STAMPED & COLORED CONCRETE (TO MATCH MEDIAN NOSE SEALED EXPANSION JOINT (4 IN) (SEJ-A) REMOVE & DISPOSE OF EXISTING BRIDGE STRUCTURE BRIDGE MEDIAN BRIDGE SIDEWALK CONCRETE MOWSTRIP (9" WIDTH) - RE: E/L1.9 DRY RIVER BED OKLAHOMA FLAGSTONE (3" THICK) - RE APPROACH SLAB (HPC) PRESTR CONC GIRDER (TX54) RIPRAP (STONE PROTECTION)(12 IN) RIPRAP (STONE PROTECTION)(30 IN) STR STEEL (MISC NON-BRIDGE) RAIL(PEDESTRIAN)(SPL) CEM STABIL BKFL DRILL SHAFT (18 IN) DRILL SHAFT (36 IN) CL C CONC (ABUT)(HPC) CL C CONC (BENT)(HPC) REINF CONC SLAB (HPC) STREET SIGNS RAILROAD CROSSING SIGNAGE, STRIPING AND MARKINGS PAVEMENT STRIPING & MARKINGS TRAFFIC BUTTONS POST-PROJECT VIDEO SURVEY PORTABLE CHANGEABLE MESSAGE SIGN METAL BEAM GUARD RAIL END TREATMENT (SGT8-14) GABION BASKETS TREE ROOT BARRIER RESTORE IRRIGATION SYSTEM RESTORE PARKWAYS AND DISTURBED AREAS RESTORE LANDSCAPE BEDS EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 4 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F L-14 105 EA 12.20 $1,281.00 $1,281.00 L-15 120 EA 11.40 $1,368.00 $1,368.00 L-16 18 EA 15.85 $285.30 $285.30 L-17 233 EA 15.85 $3,693.05 $3,693.05 L-18 358 EA 15.85 $5,674.30 $5,674.30 L-19 116 EA 12.50 $1,450.00 $1,450.00 L-20 174 EA 15.85 $2,757.90 $2,757.90 L-21 12 EA 5.00 $60.00 $60.00 L-22 80 EA 6.10 $488.00 $488.00 L-23 32 EA 5.00 $160.00 $160.00 L-24 152 EA 5.60 $851.20 $851.20 L-25 266 EA 5.00 $1,330.00 $1,330.00 L-26 90 EA 6.50 $585.00 $585.00 L-27 246 EA 5.00 $1,230.00 $1,230.00 L-28 20,684 SF 1.00 $20,684.00 $20,684.00 L-29 100 SF 0.54 $54.00 $54.00 L-30 1,777 SF 3.08 $5,473.16 $5,473.16 L-31 8,619 SF 1.26 $10,859.94 $10,859.94 L-32 1,475 SF 0.56 $826.00 $826.00 L-33 1 LS 4,907.15 $4,907.15 $4,907.15 L-34 1 LS 3,000.00 $3,000.00 $3,000.00 L-35 1 LS 3,351.23 $3,351.23 $3,351.23 L-36 8,619 SF 17.67 $152,297.73 $152,297.73 L-37 136,480 SF 0.12 $16,377.60 $16,377.60 T-1 42 EA 1,225.00 $51,450.00 $51,450.00 T-2 10 EA 3,175.00 $31,750.00 $31,750.00 T-3 8 EA 3,095.00 $24,760.00 $24,760.00 T-4 8 EA 1,530.00 $12,240.00 $12,240.00 T-5 42 EA 1,425.00 $59,850.00 $59,850.00 T-6 12,401 LF 17.00 $210,817.00 $210,817.00 T-7 1,014 LF 15.00 $15,210.00 $15,210.00 T-8 400 LF 6.10 $2,440.00 $2,440.00 T-9 29 EA 625.00 $18,125.00 $18,125.00 T-10 7,308 LF 1.00 $7,308.00 $7,308.00 T-11 14,616 LF 1.10 $16,077.60 $16,077.60 T-12 4 EA 5,200.00 $20,800.00 $20,800.00 TS-1 26 LF 295.00 $7,670.00 $7,670.00 TS-2 44 LF 360.00 $15,840.00 $15,840.00 TS-3 40 LF 6.10 $244.00 $244.00 TS-4 110 LF 17.00 $1,870.00 $1,870.00 TS-5 290 LF 11.90 $3,451.00 $3,451.00 TS-6 30 LF 12.50 $375.00 $375.00 DRILL SHAFT (TRF SIG POLE) (36 IN) DRILL SHAFT (TRF SIG POLE) (48 IN) CONDUIT (PVC) (SCH 40) (2") CONDUIT (PVC) (SCH 40) (2") (BORE) CONDUIT (PVC) (SCH 40) (3") CONDUIT (PVC) (SCH 40) (4") CONDUIT (PVC) (SCH 40) (2") (BRIDGE) CONDUIT (PVC) (SCH 40) (2") (TRENCH) GROUND BOX TYPE A ELEC CONDR (NO. 8) BARE ELEC CONDR (NO. 8) INSULATED POWER SERVICE PEDESTAL & EQUIPMENT DRILL SHAFT (RDVVY ILL POLE) (24 IN) BRIDGE BANNER POLE ASSEMBLY BRIDGE ILLUMINATION POLE ANTIQUE LUMINAIRE - TYPE ZP26A INSTALL ROADWAY ILLUM ASSEMBLY (LED) (MATERIALS CONDUIT (PVC) (SCH 40) (2") (BORE) MULCH (TYP. 1' BAND AT BACK OF CURB) FERTILIZERS PRUNE BRANCHES TO 8' CLEAR ON EXISTING OVERHANGI ADJUST EXISTING RET. WALL & REPAIR EXISTING LAND IRRIGATION SYSTEM (IN MEDIANS) TEMPORARY IRRIGATION SYSTEM (FOR TURF OUTSIDE ST PINK SKULLCAP - 1 GAL. FALL ASTER - 1 GAL. SOLID SOD BUFFALO GRASS SOLID SOD BERMUDA GRASS DECOMPOSED GRANITE - RE: F/L1 9 BED PREPERATION & TOP MULCH RED YUCCA - 3 GAL. RUSSIAN SAGE - 1 GAL. AUTUMN SAGE - 1 GAL. MEXICAN BUSH SAGE - 1 GAL. 'BLONDE AMBITION' BLUE GRAMMA - 1 GAL. BLACKEYED SUSAN - 1 GAL. ABELIA 'CANYON CREEK' - 5 GAL. ROSEMARY 'TUSCAN BLUE' - 5 GAL. SOFTLEAF YUCCA - 5 GAL. WHITE CLOUD MUHLY - 3 GAL. MEXICAN FEATHER GRASS - 3 GAL. GULF MUHLY 'REGAL MIST' - 3 GAL. EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 5 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F TS-7 485 LF 22.50 $10,912.50 $10,912.50 TS-8 2,050 LF 1.00 $2,050.00 $2,050.00 TS-9 1,810 LF 1.05 $1,900.50 $1,900.50 TS-10 360 LF 1.20 $432.00 $432.00 TS-11 6 EA 675.00 $4,050.00 $4,050.00 TS-12 2 EA 14,150.00 $28,300.00 $28,300.00 TS-13 1 EA 1,500.00 $1,500.00 $1,500.00 TS-14 8 EA 225.00 $1,800.00 $1,800.00 TS-15 4 EA 225.00 $900.00 $900.00 TS-16 8 EA 225.00 $1,800.00 $1,800.00 TS-17 8 EA 225.00 $1,800.00 $1,800.00 TS-18 8 EA 225.00 $1,800.00 $1,800.00 TS-19 4 EA 225.00 $900.00 $900.00 TS-20 16 EA 510.00 $8,160.00 $8,160.00 TS-21 8 EA 60.00 $480.00 $480.00 TS-22 4 EA 75.00 $300.00 $300.00 TS-23 410 LF 1.20 $492.00 $492.00 TS-24 1,437 LF 1.40 $2,011.80 $2,011.80 TS-25 535 LF 3.60 $1,926.00 $1,926.00 TS-26 1,145 LF 5.65 $6,469.25 $6,469.25 TS-27 2,385 LF 1.95 $4,650.75 $4,650.75 TS-28 2 EA 8,900.00 $17,800.00 $17,800.00 TS-29 1 EA 35,100.00 $35,100.00 $35,100.00 TS-30 1 EA 35,450.00 $35,450.00 $35,450.00 TS-31 8 EA 1,850.00 $14,800.00 $14,800.00 TS-32 1 EA 1,700.00 $1,700.00 $1,700.00 TS-33 16 EA 650.00 $10,400.00 $10,400.00 TS-34 2 EA 3,300.00 $6,600.00 $6,600.00 TS-35 1 EA 7,500.00 $7,500.00 $7,500.00 TS-36 4 EA 1,400.00 $5,600.00 $5,600.00 TS-37 1 EA 450.00 $450.00 $450.00 TS-38 1,390 LF 2.50 $3,475.00 $3,475.00 TS-39 1 EA 7,300.00 $7,300.00 $7,300.00 TS-40 4 EA 880.00 $3,520.00 $3,520.00 TS-41 1 EA 3,500.00 $3,500.00 $3,500.00 TS-42 1,333 LF 0.95 $1,266.35 $1,266.35 TS-43 4 EA 3,200.00 $12,800.00 $12,800.00 X-1 1 LS 39,068.86 $39,068.86 $39,068.86 1 EA 2,657.26 $2,657.26 1 $2,657.26 $2,657.26 100.0% 1 EA 2,304.81 $2,304.81 1 $2,304.81 $2,304.81 100.0% 205.83 LF 29.00 $5,969.07 205.83 $5,969.07 $5,969.07 100.0% X-2 1 LS 50,000.00 $50,000.00 $50,000.00 ILLUMINATED STREET NAME SIGNS PROJECT ALLOWANCE FOR WATER IMPROVEMENTS PROJECT ALLOWANCE FOR SANITARY SEWER IMPROVEMENT '12" Plug at Gateway Change Hydrant Location at 8+05 ABANDON EXISTING 12" WATER LINE (Overrun) VIVDS SET-UP SYSTEM VIVDS COMMUNICATION CABLE (COAXIAL) BBU SYSTEM (EXTERNAL BATT CABINET) UNI-DIRECTIONAL OPTICOM DETECTOR PHASE SELECTOR OPTICOM DETECTOR CABLE PED POLE ASSEMBLY PEDESTRIAN PUSH BUTTON POST PED DETECT PUSH BUTTON (APS) PED DETECTOR CONTROLLER UNIT VIVDS PROCESSOR SYSTEM VIVDS CAMERA ASSEMBLY TRF SIG CBL (TY A) (14 AWG) (12 CONDR) TRF SIG CBL (TY A) (14 AWG) (16 CONDR) TRF SIG CBL (TY C) (12 AWG) (2 CONDR) INS TRF SIG PL AM(S)1ARM(36') INS TRF SIG PL AM(S)1ARM(55') INS TRF SIG PL AM(S)1ARM(60') VEH SIG SEC (12")LED(RED ARW) PED SIG SEC (LED) (COUNTDOWN) BACK PLATE (12") (3 SEC) BACK PLATE (12") (4 SEC) TRF SIG CBL (TY A) (14 AWG) (5 CONDR) TRF SIG CBL (TY A) (14 AWG) (7 CONDR) REMOVING TRAFFIC SIGNALS VEH SIG SEC (12")LED(GRN) VEH SIG SEC (12")LED(GRN ARW) VEH SIG SEC (12")LED(YEL) VEH SIG SEC (12")LED(YEL ARW) VEH SIG SEC (12")LED(RED) CONDUIT (PVC) (SCH 40) (4") (BORE) ELEC CONDUCTOR (NO. 8) INSULATED ELEC CONDUCTOR (NO. 6) BARE ELEC CONDUCTOR (NO. 6) INSULATED GROUND BOX TY C (162911) W/APRON INSTALL HVVY TRAF SIG (ISOLATED) EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 6 of 7 Progress Estimate - Unit Price Work Contractor's Application For (Contract):Application Number: Application Period:Application Date: Total Completed and Stored to Date % Balance to Finish Bid Item No.Description Item Quantity Units Unit Price Total Value of Item ($) G H I Item Contract Information Estimated Quantity Billed this Period Estimated Quantity Billed to Date Value of Work Billed this Period Value of Work Billed to Date Materials Presently Stored FREEPORT PARKWAY 007 September 25, 2018 to October 25, 2018 October 25, 2018 A B C D E F X-3 1 LS 50,000.00 $50,000.00 $50,000.00 X-4 1 LS 50,000.00 $50,000.00 $50,000.00 X-5 1 LS 50,000.00 $50,000.00 $50,000.00 X-6 1 LS 25,000.00 $25,000.00 $25,000.00 X-7 1 LS 25,000.00 $25,000.00 $25,000.00 $15,819,808.64 $243,764.35 $3,326,383.63 $79,238.21 $3,405,621.84 21.5%$12,414,186.80 PROJECT ALLOWANCE FOR ILLUMINATION IMPROVEMENTS PROJECT ALLOWANCE FOR LANDSCAPING IMPROVEMENTS Totals PROJECT ALLOWANCE FOR STORM DRAIN IMPROVEMENTS PROJECT ALLOWANCE FOR PAVING IMPROVEMENTS PROJECT ALLOWANCE FOR BRIDGE IMPROVEMENTS EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 7 of 7 Stored Material Summary Contractor's Application For (Contract):Application Number: Application Period:Application Date: B E G 1610 594232 BEXAR 7/2018 $72,025.45 $72,025.45 $72,025.45 1610 594940 BEXAR 7/2018 $2,049.86 $2,049.86 $2,049.86 1610 595067 BEXAR 7/2018 $3,923.64 $3,923.64 $3,923.64 1610 595252 BEXAR 7/2018 $1,239.26 $1,239.26 $1,239.26 $79,238.21 $79,238.21 $79,238.21 Supplier Invoice No. Submittal No. (with Specification Section No.) A C Bid Item No. Storage Location Description of Materials or Equipment Stored FREEPORT PARKWAY 007 Tuesday, September 25, 2018 D F September 25, 2018 to October 25, 2018 Stored Previously Incorporated in Work Date Placed into Storage (Month/Year) Amount ($) Date (Month/ Year) Amount ($) Materials Remaining in Storage ($) (D + E - F) Amount Stored this Month ($) Subtotal Amount Completed and Stored to Date (D + E) Slab Deck Panels Slab Deck Panels Slab Deck Panels Slab Deck Panels Totals EJCDC® C-620 Contractor's Application for Payment © 2013 National Society of Professional Engineers for EJCDC. All rights reserved. Page 1 of 1