Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1723 - 10-2018 Update
Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal Float1723 - Freeport1723 - Freeport40127109-Apr-18 A15-Jan-200A1000Project Start0009-Apr-18 A7 DayA1320Duration53044709-Apr-18 A15-Jan-207 Day0A1530Bridge ROW Issue0009-Apr-18 A25-Apr-18 A7 DayA1600Project Time Charges52344709-Apr-18 A15-Jan-207 Day0A1330Milestone 119011126-Apr-18 A12-Feb-197 Day6A1670Start Time Charges0026-Apr-18 A7 DayA3550Time Charges Start to Utility Stop1026-Apr-18 A03-Aug-18 A7 DayA3540Stop Time Charges due to Utility Conflicts0003-Aug-18 A7 DayA1340Milestone 211911913-Feb-1912-Jun-197 Day163A1350Milestone 315215214-Jun-1913-Nov-197 Day15A1020Project Finish0015-Jan-207 Day0Stage 1Stage 1141109-Apr-18 A25-Oct-185 Day308WaterWater9009-Apr-18 A27-Apr-18 A5 DayA1650Sawcut for Removals - Water Line & Detour3009-Apr-18 A11-Apr-18 A5 DayA1550Water Line 45+80 to 48+256012-Apr-18 A17-Apr-18 A5 DayA1380Crossing @ 44+703018-Apr-18 A18-Apr-18 A5 DayA1370Crossing @36+164019-Apr-18 A25-Apr-18 A5 DayA1360Crossing @ 28+263026-Apr-18 A27-Apr-18 A5 DayTCP Setup Stage 2TCP Setup Stage 2141112-Apr-18 A25-Oct-185 Day308A1660Sawcut for Removals - Bridge Sidewalk1012-Apr-18 A20-Apr-18 A5 DayA1050Remove Sidewalk SB5023-Apr-18 A15-May-18 A5 DayA2600Railroad Crossing Arm Delay15026-Apr-18 A25-Jun-18 A5 DayA1070Remove Bridge Median1015-May-18 A15-May-18 A5 DayA1090Removals - Detours1016-May-18 A16-May-18 A5 DayA1100Install Stage Detours3016-May-18 A18-May-18 A5 DayA1080Set & Pin PCTB - Demo Edge2021-May-18 A21-May-18 A5 DayA1610Railroad Install Temp Crossing Arms0027-Jun-18 A5 DayA1060Set PCTB - Center Stripe1125-Oct-1825-Oct-185 Day5Storm DrainStorm Drain0025-Oct-1825-Oct-185 Day6A1390Storm Drain Rehab @ 17+230025-Oct-1825-Oct-185 Day6Stage 2 - NB Dividend to BethelStage 2 - NB Dividend to Bethel1646117-May-18 A12-Feb-19210A1620Switch Traffic to Stage 21021-May-18 A21-May-18 A5 DayA1630Remove Concrete Pavement & Sidewalk - South of RR8025-May-18 A13-Jun-18 A5 DayA2420Complete Pavement Removal North of RR3026-Jun-18 A13-Jul-18 A5 DaySanitary SewerSanitary Sewer2017-May-18 A18-May-18 A5 DayA1490Install SS @ 26+56 w/ Temp Connection2017-May-18 A18-May-18 A5 DayStorm DrainStorm Drain515109-Nov-1824-Jan-195 Day10A1500Storm Drain Impovements NB131309-Nov-1827-Nov-185 Day30A1860Complete Inlet Tops after Paving181831-Dec-1824-Jan-195 Day10Water LineWater Line1161422-May-18 A16-Nov-18257AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2018201920201723 - FreeportProject StartStart Time ChargesStop Time Charges due to Utility ConflictsProject FinishStage 1WaterTCP Setup Stage 2Railroad Install Temp Crossing ArmsSet PCTB - Center StripeStorm DrainStorm Drain Rehab @ 17+23Stage 2 - NB Dividend to BethelSanitary SewerStorm DrainStorm Drain Impovements NBComplete Inlet Tops after PavingWater Line1723 - Freeport TEXAS STERLINGCONSTRUCTION CO.Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 1 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA1400Steel Casing 23+81 to 26+1616022-May-18 A23-May-18 A5 DayA1440Install 16" Main in Bore3024-May-18 A24-May-18 A5 DayA1430Install 16" Main 27+13 to 36+168025-May-18 A06-Jun-18 A5 DayA1640Install 16" Main 36+16 to 45+807007-Jun-18 A22-Jun-18 A5 DayA1420Install 16" Main 19+00 to 23+104026-Jun-18 A10-Jul-18 A5 DayA1460Connect to Existing @ 19+081005-Jul-18 A06-Jul-18 A5 DayA3030Test Line A5011-Jul-18 A24-Jul-18 A5 DayA1690Install 20" Waterline on Southwestern11016-Jul-18 A26-Jul-18 A5 DayA1450Install Hydrants, Crossings, etc 19+00 to45+804024-Jul-18 A21-Aug-18 A5 DayA1410Install Hydrants, Crossing, etc Dividend to 19+006022-Aug-18 A23-Aug-18 A5 DayA1470Finish Connecting Services2024-Aug-18 A27-Aug-18 A5 DayA1480Grout Existing Water Line10025-Sep-18 A28-Sep-18 A5 DayA356020" WL on Southwestern8001-Oct-18 A12-Oct-18 A5 DayA3570Tie in Shop Drawings and manufacturing211513-Oct-18 A08-Nov-187 Day425A3580Install Tie in2209-Nov-1812-Nov-185 Day293A1700Replace Pavement on Southwestern3313-Nov-1816-Nov-185 Day293BridgeBridge1484924-May-18 A25-Jan-1914A1030Demo Existing Bridge5024-May-18 A15-Jun-18 A5 DayA1040Grading Proposed Bridge1016-Jun-18 A18-Jun-18 A5 DayA2610Drill Sub Mobilization10019-Jun-18 A20-Jun-18 A5 DayA1110Drill Shafts4021-Jun-18 A22-Jun-18 A5 DayA1560Drill Shaft Utility Conflict1023-Jun-18 A08-Oct-18 A7 DayA3590Drill Shaft Weather Delay1709-Oct-18 A01-Nov-187 Day25A2960Complete Drill Shafts5502-Nov-1808-Nov-185 Day17A1120Bent 2 Columns2209-Nov-1812-Nov-185 Day17A1180Drill Shaft Cure3309-Nov-1812-Nov-187 Day29A1130Bent 3 Columns2212-Nov-1814-Nov-185 Day17A1190Bent 2 Column Cure3312-Nov-1815-Nov-187 Day32A1140Abut 1 Cap2214-Nov-1816-Nov-185 Day17A1200Bent 3 Column Cure3314-Nov-1817-Nov-187 Day33A1150Abut 4 Cap2216-Nov-1820-Nov-185 Day17A1210Abut 1 Cap Cure3316-Nov-1819-Nov-187 Day41A1160Bent 2 Cap2221-Nov-1823-Nov-185 Day17A1220Abut 4 Cap Cure3321-Nov-1824-Nov-187 Day37A1680Install CTB @ Abutments3321-Nov-1826-Nov-185 Day40A1170Bent 3 Cap2223-Nov-1827-Nov-185 Day17A1230Bent 2 Cap Cure3323-Nov-1826-Nov-187 Day35A1240Bent 3 Cap Cure3327-Nov-1830-Nov-187 Day30A1510Install Riprap Under New Bridge3327-Nov-1804-Dec-185 Day17A1250Set Beams1105-Dec-1805-Dec-185 Day17A1260Set Overhang111106-Dec-1821-Dec-185 Day17A1270Install Precast Panels & PMD4421-Dec-1828-Dec-185 Day17A1280Tie Deck Steel2228-Dec-1831-Dec-185 Day17A1290Pour Deck1131-Dec-1802-Jan-195 Day17A1300Cure Deck8802-Jan-1910-Jan-197 Day24A1310Install Ped Rail on Deck w/ Conduit101010-Jan-1925-Jan-195 Day16RoadwayRoadway1286116-Jul-18 A12-Feb-194A1710Balance Subgrade 1+55 to 36+009016-Jul-18 A25-Jul-18 A5 DayAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Tie in Shop Drawings and manufacturingInstall Tie inReplace Pavement on SouthwesternBridgeDrill Shaft Weather DelayComplete Drill ShaftsBent 2 ColumnsDrill Shaft CureBent 3 ColumnsBent 2 Column CureAbut 1 CapBent 3 Column CureAbut 4 CapAbut 1 Cap CureBent 2 CapAbut 4 Cap CureInstall CTB @ AbutmentsBent 3 CapBent 2 Cap CureBent 3 Cap CureInstall Riprap Under New BridgeSet BeamsSet OverhangInstall Precast Panels & PMDTie Deck SteelPour DeckCure DeckInstall Ped Rail on Deck w/ ConduitRoadwayRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 2 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA2390Balance Subgrade 36+00 to 67+689026-Jul-18 A06-Aug-18 A5 DayA3060Spectrum Conflict at 65+0071406-Aug-18 A08-Nov-187 Day7A3070Frontier Conflict 45+00 to 67+687006-Aug-18 A23-Oct-18 A7 DayA3190Century Link Conflict at 9+1371406-Aug-18 A08-Nov-187 Day7A1960Retaining Wall 45+51 to 48+24111125-Oct-1809-Nov-185 Day35A3530Finish Balance Subgrade after Conflict3309-Nov-1811-Nov-187 Day7A1970Retaining Wall 63+82 to 65+156609-Nov-1816-Nov-185 Day35A1720Fine Grade Subgrade6612-Nov-1819-Nov-185 Day5A17304" HMAC Ty B8819-Nov-1803-Dec-185 Day5A1740Tie Steel - Paving Pass 15503-Dec-1810-Dec-185 Day5A1800Paving - Pass 13310-Dec-1813-Dec-185 Day5A1750Tie Steel - Paving Pass 25513-Dec-1820-Dec-185 Day5A1870Cure Paving - Pass 13313-Dec-1816-Dec-187 Day12A1780Tie Steel - 2nd Half Cross Streets2217-Dec-1819-Dec-185 Day29A1760Tie Steel - Turn Lanes (13 turn lanes)2220-Dec-1824-Dec-185 Day6A1810Paving - Pass 23320-Dec-1826-Dec-185 Day5A1820Pave - Turn Lanes2226-Dec-1827-Dec-185 Day6A1880Cure Paving - Pass 23326-Dec-1829-Dec-187 Day8A1890Cure - Turn Lanes3328-Dec-1831-Dec-187 Day11A1770Tie Steel - 1st Half Cross Streets2231-Dec-1803-Jan-195 Day14A1950Backfill Pavement3331-Dec-1804-Jan-195 Day8A1830Pave - 1st Half Cross Streets2203-Jan-1907-Jan-195 Day14A1980Grade for Sidewalk121207-Jan-1922-Jan-195 Day4A1900Cure - 1st Half Intersections3308-Jan-1911-Jan-197 Day20A1840Pave - 2nd Half Cross Streets2211-Jan-1915-Jan-195 Day14A1910Cure 2nd Half Intersections3315-Jan-1918-Jan-197 Day20A1930Install Colored Stamped Concrete5515-Jan-1922-Jan-195 Day18A1790Tie Steel - Driveways2218-Jan-1923-Jan-195 Day14A1940Cure Stamped Concrete3322-Jan-1925-Jan-197 Day24A1990Pave Sidewalk & Trail8823-Jan-1901-Feb-195 Day4A1850Pave - Driveways3323-Jan-1928-Jan-195 Day14A1920Cure - Driveways3328-Jan-1931-Jan-197 Day18A2000Backfill Sidewalk & Trail2204-Feb-1905-Feb-195 Day4A2010Grass & Landscape Outside5505-Feb-1912-Feb-195 Day4RailroadRailroad707025-Oct-1805-Feb-195 Day9A1570Railroad Installed Ped Crossing Arms NB1125-Oct-1825-Oct-185 Day76A1580Connect Pavement NB2231-Dec-1803-Jan-195 Day31A1590Build Sidewalk at RR Crossing NB2204-Feb-1905-Feb-195 Day9Traffic SignalsTraffic Signals4431-Dec-1804-Jan-195 Day4A1520Signal Drill Shafts at Southwestern NB2231-Dec-1802-Jan-195 Day4A1540Install Conduit from NB Corners w/ Pull Boxes2202-Jan-1904-Jan-195 Day4Stage 3A - SB Dividend to FritzStage 3A - SB Dividend to Fritz606012-Feb-1919-May-1914A3840Switch Traffic to Stage 3A1112-Feb-1913-Feb-195 Day4A3890Remove Concrete Pavement2213-Feb-1915-Feb-195 Day9WaterWater9918-Feb-1928-Feb-195 Day33A2280Remove & Replace Existing Hydrants3318-Feb-1920-Feb-195 Day33A2290Complete Crossing @ 13+602221-Feb-1922-Feb-195 Day33AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Spectrum Conflict at 65+00Century Link Conflict at 9+13Retaining Wall 45+51 to 48+24Finish Balance Subgrade after ConflictRetaining Wall 63+82 to 65+15Fine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Tie Steel - 2nd Half Cross StreetsTie Steel - Turn Lanes (13 turn lanes)Paving - Pass 2Pave - Turn LanesCure Paving - Pass 2Cure - Turn LanesTie Steel - 1st Half Cross StreetsBackfill PavementPave - 1st Half Cross StreetsGrade for SidewalkCure - 1st Half IntersectionsPave - 2nd Half Cross StreetsCure 2nd Half IntersectionsInstall Colored Stamped ConcreteTie Steel - DrivewaysCure Stamped ConcretePave Sidewalk & TrailPave - DrivewaysCure - DrivewaysBackfill Sidewalk & TrailGrass & Landscape OutsideRailroadRailroad Installed Ped Crossing Arms NBConnect Pavement NBBuild Sidewalk at RR Crossing NBTraffic SignalsSignal Drill Shafts at Southwestern NBInstall Conduit from NB Corners w/ Pull BoxesStage 3A - SB Dividend to FritzSwitch Traffic to Stage 3ARemove Concrete PavementWaterRemove & Replace Existing HydrantsComplete Crossing @ 13+60Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 3 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA2300Complete Crossing @ 16+052225-Feb-1926-Feb-195 Day33A2310Complete Crossing @ 22+682227-Feb-1928-Feb-195 Day33Storm DrainStorm Drain444401-Mar-1901-May-195 Day4A2400Storm Drain Impovements SB6601-Mar-1908-Mar-195 Day33A2410Complete Inlet Tops after Paving9918-Apr-1901-May-195 Day4Sanitary SewerSanitary Sewer262618-Feb-1926-Mar-195 Day4A2360Install SS 32+33 to 23+898818-Feb-1927-Feb-195 Day9A2320Drill Shafts for Aerial SS Crossing3320-Feb-1925-Feb-195 Day4A2330Columns for Aerial SS Crossing3325-Feb-1928-Feb-195 Day4A2340Caps for Aerial SS Crossing2228-Feb-1904-Mar-195 Day4A2350Casing for Aerial SS Crossing3304-Mar-1907-Mar-195 Day4A2370Install SS 23+89 to 17+398807-Mar-1919-Mar-195 Day4A2380Rehab Existing SS Manholes5519-Mar-1926-Mar-195 Day4BridgeBridge565613-Feb-1910-May-1918A2030Demo Existing Bridge5513-Feb-1920-Feb-195 Day4A2040Grading Proposed Bridge1120-Feb-1921-Feb-195 Day19A2050Drill Shafts5521-Feb-1928-Feb-195 Day19A2060Bent 2 Columns2228-Feb-1901-Mar-195 Day19A2200Drill Shaft Cure3328-Feb-1903-Mar-197 Day29A2210Bent 2 Column Cure3302-Mar-1905-Mar-197 Day35A2070Bent 3 Columns2204-Mar-1905-Mar-195 Day19A2080Abut 1 Cap2205-Mar-1907-Mar-195 Day19A2220Bent 3 Column Cure3305-Mar-1908-Mar-197 Day33A2090Abut 4 Cap2208-Mar-1912-Mar-195 Day19A2230Abut 1 Cap Cure3308-Mar-1911-Mar-197 Day39A2100Bent 2 Cap2212-Mar-1914-Mar-195 Day19A2240Abut 4 Cap Cure3312-Mar-1915-Mar-197 Day35A2190Install CTB @ Abutments3312-Mar-1915-Mar-195 Day38A2110Bent 3 Cap2214-Mar-1919-Mar-195 Day19A2250Bent 2 Cap Cure3314-Mar-1917-Mar-197 Day33A2260Bent 3 Cap Cure3319-Mar-1922-Mar-197 Day28A2180Install Riprap Under New Bridge4419-Mar-1925-Mar-195 Day19A2120Set Beams1125-Mar-1926-Mar-195 Day19A2130Set Overhang6626-Mar-1902-Apr-195 Day19A2140Install Precast Panels & PMD5502-Apr-1909-Apr-195 Day19A2150Tie Deck Steel2209-Apr-1911-Apr-195 Day19A2160Pour Deck1111-Apr-1912-Apr-195 Day19A2270Cure Deck8812-Apr-1920-Apr-197 Day27A2170Install Ped Rail on Deck w/ Conduit101022-Apr-1906-May-195 Day20A2020Form & Pour West Sidewalk & Median4406-May-1910-May-195 Day20RoadwayRoadway575718-Feb-1919-May-190A2430Balance Subgrade6618-Feb-1926-Feb-195 Day25A2440Fine Grade Subgrade2226-Mar-1927-Mar-195 Day5A24504" HMAC Ty B3328-Mar-1902-Apr-195 Day4A2460Tie Steel - Paving Pass 12202-Apr-1904-Apr-195 Day4A2520Paving - Pass 12204-Apr-1908-Apr-195 Day4A2470Tie Steel - Paving Pass 22208-Apr-1909-Apr-195 Day4A2660Cure Paving - Pass 13308-Apr-1911-Apr-197 Day5AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Complete Crossing @ 16+05Complete Crossing @ 22+68Storm DrainStorm Drain Impovements SBComplete Inlet Tops after PavingSanitary SewerInstall SS 32+33 to 23+89Drill Shafts for Aerial SS CrossingColumns for Aerial SS CrossingCaps for Aerial SS CrossingCasing for Aerial SS CrossingInstall SS 23+89 to 17+39Rehab Existing SS ManholesBridgeDemo Existing BridgeGrading Proposed BridgeDrill ShaftsBent 2 ColumnsDrill Shaft CureBent 2 Column CureBent 3 ColumnsAbut 1 CapBent 3 Column CureAbut 4 CapAbut 1 Cap CureBent 2 CapAbut 4 Cap CureInstall CTB @ AbutmentsBent 3 CapBent 2 Cap CureBent 3 Cap CureInstall Riprap Under New BridgeSet BeamsSet OverhangInstall Precast Panels & PMDTie Deck SteelPour DeckCure DeckInstall Ped Rail on Deck w/ ConduitForm & Pour West Sidewalk & MedianRoadwayBalance SubgradeFine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 4 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA2480Tie Steel - Turn Lanes2210-Apr-1912-Apr-195 Day4A2530Paving - Pass 22211-Apr-1915-Apr-195 Day3A2540Pave - Turn Lanes2215-Apr-1917-Apr-195 Day3A2670Cure Paving - Pass 23315-Apr-1918-Apr-197 Day6A2680Cure - Turn Lanes3317-Apr-1920-Apr-197 Day4A2590Backfill Pavement2217-Apr-1918-Apr-195 Day13A2490Tie Steel - 1st Half Cross Streets1122-Apr-1922-Apr-195 Day2A2550Pave - 1st Half Cross Streets2223-Apr-1924-Apr-195 Day2A2690Cure - 1st Half Intersections3325-Apr-1928-Apr-197 Day3A2500Tie Steel - 2nd Half Cross Streets1129-Apr-1929-Apr-195 Day2A2510Tie Steel - Driveways2230-Apr-1901-May-195 Day10A2560Pave - 2nd Half Cross Streets2230-Apr-1901-May-195 Day2A2620Grade for Sidewalk4401-May-1907-May-195 Day4A2570Pave - Driveways2202-May-1903-May-195 Day10A2700Cure 2nd Half Intersections3302-May-1905-May-197 Day2A2710Cure - Driveways3303-May-1906-May-197 Day14A2580Install Colored Stamped Concrete8806-May-1915-May-195 Day1A2630Pave Sidewalk2207-May-1909-May-195 Day4A2640Backfill Sidewalk1109-May-1910-May-195 Day4A2650Grass & Landscape Outside2210-May-1913-May-195 Day4A2720Cure Stamped Concrete3316-May-1919-May-197 Day1LightingLighting2226-Mar-1928-Mar-195 Day4A2850Install Conduit Between Medians2226-Mar-1928-Mar-195 Day4Stage 3B - Median Dividend to AirlineStage 3B - Median Dividend to Airline474720-May-1931-Jul-19103A3850Switch Traffic to Stage 3B1120-May-1920-May-195 Day0A3900Remove Concrete Pavement1121-May-1921-May-195 Day0RoadwayRoadway161622-May-1914-Jun-19102A2730Balance & Fine Grade Subgrade2222-May-1923-May-195 Day0A27404" HMAC Ty B1123-May-1924-May-195 Day0A2750Tie Steel - Paving Pass 12224-May-1928-May-195 Day0A2780Pave - Pass 11128-May-1929-May-195 Day0A2760Tie Steel - Paving Pass 22229-May-1930-May-195 Day0A2810Cure Pass 13329-May-1901-Jun-197 Day2A2790Pave - Pass 21103-Jun-1903-Jun-195 Day0A2770Tie Steel - Paving Pass 32204-Jun-1905-Jun-195 Day0A2820Cure Pass 23304-Jun-1907-Jun-197 Day168A2800Pave - Pass 31105-Jun-1906-Jun-195 Day0A2830Cure Pass 33306-Jun-1909-Jun-197 Day0A2840Colored Stamped Median Pavement2212-Jun-1914-Jun-195 Day116LightingLighting9922-May-1904-Jun-193A2860Install Illumination Drill Shafts (15 ea)2222-May-1924-May-195 Day5A2870Complete Conduit2224-May-1927-May-195 Day6A2890Cure Illumination Drill Shafts6624-May-1929-May-197 Day7A2880Set Illumination & Wiring2230-May-1904-Jun-195 Day4LandscapingLandscaping383806-Jun-1931-Jul-195 Day116A2900Install Irrigation System4406-Jun-1912-Jun-195 Day116A2910Install Landscape Borders2214-Jun-1918-Jun-195 Day116AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Tie Steel - Turn LanesPaving - Pass 2Pave - Turn LanesCure Paving - Pass 2Cure - Turn LanesBackfill PavementTie Steel - 1st Half Cross StreetsPave - 1st Half Cross StreetsCure - 1st Half IntersectionsTie Steel - 2nd Half Cross StreetsTie Steel - DrivewaysPave - 2nd Half Cross StreetsGrade for SidewalkPave - DrivewaysCure 2nd Half IntersectionsCure - DrivewaysInstall Colored Stamped ConcretePave SidewalkBackfill SidewalkGrass & Landscape OutsideCure Stamped ConcreteLightingInstall Conduit Between MediansStage 3B - Median Dividend to AirlineSwitch Traffic to Stage 3BRemove Concrete PavementRoadwayBalance & Fine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Pave - Pass 1Tie Steel - Paving Pass 2Cure Pass 1Pave - Pass 2Tie Steel - Paving Pass 3Cure Pass 2Pave - Pass 3Cure Pass 3Colored Stamped Median PavementLightingInstall Illumination Drill Shafts (15 ea)Complete ConduitCure Illumination Drill ShaftsSet Illumination & WiringLandscapingInstall Irrigation SystemInstall Landscape BordersRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 5 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA2920Install Landscaping181818-Jun-1915-Jul-195 Day116A2930Install City Monument121215-Jul-1931-Jul-195 Day116Stage 4A - SB Fritz to BethelStage 4A - SB Fritz to Bethel989810-Jun-1913-Nov-1910A3860Switch Traffic to Stage 4A1110-Jun-1910-Jun-195 Day0A3910Remove Concrete Pavement8811-Jun-1920-Jun-195 Day0Sanitary SewerSanitary Sewer6621-Jun-1901-Jul-195 Day0A2940Install SS @ Southwestern4421-Jun-1926-Jun-195 Day0A2950Complete SS Rehab Work2227-Jun-1901-Jul-195 Day0Storm DrainStorm Drain717101-Jul-1908-Oct-195 Day11A3080Storm Drain Impovements SB8801-Jul-1912-Jul-195 Day0A3090Complete Inlet Tops after Paving121223-Sep-1908-Oct-195 Day11Water LineWater Line414121-Jun-1920-Aug-195 Day0A3110Bore Casing Under Railroad (102 LF)101021-Jun-1905-Jul-195 Day7A3100Complete SB Water Connections 28+26 to 45+802212-Jul-1916-Jul-195 Day0A3120Install 16" Water Main 45+80 to 67+68151516-Jul-1906-Aug-195 Day0A3140Connect to Existing @ 67+681106-Aug-1907-Aug-195 Day0A3130Complete Connections North of 45+802207-Aug-1912-Aug-195 Day0A3150Remove/Grout Existing Water Line6612-Aug-1920-Aug-195 Day0RoadwayRoadway898921-Jun-1913-Nov-1910A3200Balance Subgrade101021-Jun-1905-Jul-195 Day32A3210Fine Grade Subgrade3320-Aug-1923-Aug-195 Day0A32204" HMAC Ty B6623-Aug-1902-Sep-195 Day0A3230Tie Steel - Paving Pass 13302-Sep-1905-Sep-195 Day0A3290Paving - Pass 13305-Sep-1910-Sep-195 Day0A3240Tie Steel - Paving Pass 23310-Sep-1913-Sep-195 Day0A3430Cure Paving - Pass 13310-Sep-1913-Sep-197 Day0A3250Tie Steel - Turn Lanes (6 turn lanes)2213-Sep-1918-Sep-195 Day1A3300Paving - Pass 23313-Sep-1918-Sep-195 Day0A3310Pave - Turn Lanes3318-Sep-1923-Sep-195 Day0A3440Cure Paving - Pass 23318-Sep-1921-Sep-197 Day16A3450Cure - Turn Lanes3323-Sep-1926-Sep-197 Day0A3260Tie Steel - 1st Half Cross Streets2227-Sep-1901-Oct-195 Day0A3360Backfill Pavement4427-Sep-1902-Oct-195 Day11A3320Pave - 1st Half Cross Streets3301-Oct-1904-Oct-195 Day0A3370Install Gabions @ 61+803303-Oct-1908-Oct-195 Day11A3460Cure - 1st Half Intersections3304-Oct-1907-Oct-197 Day0A3270Tie Steel - 2nd Half Cross Streets2207-Oct-1909-Oct-195 Day0A3390Grade for Sidewalk101009-Oct-1922-Oct-195 Day11A3280Tie Steel - Driveways2210-Oct-1914-Oct-195 Day27A3330Pave - 2nd Half Cross Streets3310-Oct-1914-Oct-195 Day0A3340Pave - Driveways3314-Oct-1917-Oct-195 Day27A3470Cure 2nd Half Intersections3315-Oct-1918-Oct-197 Day0A3480Cure - Driveways3317-Oct-1920-Oct-197 Day38A3350Install Colored Stamped Concrete101018-Oct-1901-Nov-195 Day0A3400Pave Sidewalk101022-Oct-1905-Nov-195 Day11A3490Cure Stamped Concrete3301-Nov-1904-Nov-197 Day23A3410Backfill Sidewalk2205-Nov-1907-Nov-195 Day11AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Install LandscapingInstall City MonumentStage 4A - SB Fritz to BethelSwitch Traffic to Stage 4ARemove Concrete PavementSanitary SewerInstall SS @ SouthwesternComplete SS Rehab WorkStorm DrainStorm Drain Impovements SBComplete Inlet Tops after PavingWater LineBore Casing Under Railroad (102 LF)Complete SB Water Connections 28+26 to 45+80Install 16" Water Main 45+80 to 67+68Connect to Existing @ 67+68Complete Connections North of 45+80Remove/Grout Existing Water LineRoadwayBalance SubgradeFine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Paving - Pass 1Tie Steel - Paving Pass 2Cure Paving - Pass 1Tie Steel - Turn Lanes (6 turn lanes)Paving - Pass 2Pave - Turn LanesCure Paving - Pass 2Cure - Turn LanesTie Steel - 1st Half Cross StreetsBackfill PavementPave - 1st Half Cross StreetsInstall Gabions @ 61+80Cure - 1st Half IntersectionsTie Steel - 2nd Half Cross StreetsGrade for SidewalkTie Steel - DrivewaysPave - 2nd Half Cross StreetsPave - DrivewaysCure 2nd Half IntersectionsCure - DrivewaysInstall Colored Stamped ConcretePave SidewalkCure Stamped ConcreteBackfill SidewalkRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 6 of 7Run Date 26-Oct-18Data Date 25-Oct-18 Activity IDActivity NameOriginalDurationRemaining DurationStartFinishCalendarTotal FloatA3420Grass & Landscape Outside4407-Nov-1913-Nov-195 Day11RailroadRailroad989821-Jun-1906-Nov-195 Day15A2970Railroad Installed Concrete Panels SB1121-Jun-1921-Jun-195 Day111A2980Railroad Installed Ped Crossing Arms SB1121-Jun-1921-Jun-195 Day111A2990Connect Pavement SB1123-Sep-1924-Sep-195 Day46A3000Build Sidewalk at RR Crossing SB1105-Nov-1906-Nov-195 Day15Traffic SignalsTraffic Signals111118-Oct-1906-Nov-1914A3020Signal Drill Shafts at Southwestern SB2218-Oct-1921-Oct-195 Day14A3040Install Conduit from SB Corners w/ Pull Boxes2221-Oct-1924-Oct-195 Day17A3050Signal Drill Shaft Cure6621-Oct-1927-Oct-197 Day19A3010Install Signal Poles & Wire8828-Oct-1906-Nov-195 Day15Stage 4B - Median Airline to BethelStage 4B - Median Airline to Bethel39127109-Apr-18 A15-Jan-200A3870Switch Traffic to Stage 4B1113-Nov-1914-Nov-195 Day11A3920Remove Concrete Pavement2214-Nov-1918-Nov-195 Day11BridgeBridge141414-Nov-1909-Dec-1923A3160Form & Pour NB Sidewalk2214-Nov-1915-Nov-195 Day23A3170Cure NB Sidewalk3315-Nov-1918-Nov-197 Day37A3180Form & Pour NB Traffic Rail101019-Nov-1905-Dec-195 Day24A3380Illumination and Banner Poles on Bridge2205-Dec-1909-Dec-195 Day24RoadwayRoadway363618-Nov-1915-Jan-200A3630Balance & Fine Grade Subgrade2218-Nov-1919-Nov-195 Day11A36404" HMAC Ty B2219-Nov-1921-Nov-195 Day11A3650Tie Steel - Paving Pass 11121-Nov-1922-Nov-195 Day11A3680Pave - Pass 11122-Nov-1925-Nov-195 Day11A3660Tie Steel - Paving Pass 21125-Nov-1926-Nov-195 Day11A3720Cure Pass 13325-Nov-1928-Nov-197 Day28A3730Cure Pass 23326-Nov-1929-Nov-197 Day17A3690Pave - Pass 21102-Dec-1902-Dec-195 Day18A3670Tie Steel - Paving Pass 31103-Dec-1903-Dec-195 Day18A3700Pave - Pass 31104-Dec-1904-Dec-195 Day18A3740Cure Pass 33304-Dec-1907-Dec-197 Day27A3500Tie Steel - Pass 41105-Dec-1905-Dec-195 Day18A3510Pave Pass 41109-Dec-1909-Dec-195 Day17A3520Cure Pass 43310-Dec-1913-Dec-197 Day26A3830Colored Stamped Cross Walk2213-Dec-1917-Dec-195 Day16A3710Colored Stamped Median Pavement2217-Dec-1919-Dec-195 Day16A3820Permanent Striping5508-Jan-2015-Jan-205 Day0LightingLighting171702-Dec-1930-Dec-1910A3750Install Illumination Drill Shafts (27 ea)8802-Dec-1911-Dec-195 Day10A3760Complete Conduit4412-Dec-1917-Dec-195 Day10A3780Cure Illumination Drill Shafts6612-Dec-1917-Dec-197 Day17A3770Set Illumination & Wiring8818-Dec-1930-Dec-195 Day10LandscapingLandscaping38627109-Apr-18 A15-Jan-200A3880Duration53044709-Apr-18 A15-Jan-207 Day0A3790Install Irrigation System121201-Nov-1919-Nov-195 Day0A3800Install Landscape Borders8819-Nov-1903-Dec-195 Day0A3810Install Landscaping242403-Dec-1908-Jan-205 Day0AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar201820192020Grass & Landscape OutsideRailroadRailroad Installed Concrete Panels SBRailroad Installed Ped Crossing Arms SBConnect Pavement SBBuild Sidewalk at RR Crossing SBTraffic SignalsSignal Drill Shafts at Southwestern SBInstall Conduit from SB Corners w/ Pull BoxesSignal Drill Shaft CureInstall Signal Poles & WireStage 4B - Median Airline to BethelSwitch Traffic to Stage 4BRemove Concrete PavementBridgeForm & Pour NB SidewalkCure NB SidewalkForm & Pour NB Traffic RailIllumination and Banner Poles on BridgeRoadwayBalance & Fine Grade Subgrade4" HMAC Ty BTie Steel - Paving Pass 1Pave - Pass 1Tie Steel - Paving Pass 2Cure Pass 1Cure Pass 2Pave - Pass 2Tie Steel - Paving Pass 3Pave - Pass 3Cure Pass 3Tie Steel - Pass 4Pave Pass 4Cure Pass 4Colored Stamped Cross WalkColored Stamped Median PavementPermanent StripingLightingInstall Illumination Drill Shafts (27 ea)Complete ConduitCure Illumination Drill ShaftsSet Illumination & WiringLandscapingInstall Irrigation SystemInstall Landscape BordersInstall LandscapingRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestonePage 7 of 7Run Date 26-Oct-18Data Date 25-Oct-18