Loading...
ST1501A-CS181101BMPs Non-Compliance Yes No N/A Corrective action needed Construction Entrance N Silt Fence Y Good Curb Inlet Protection Y Good Drop/Wye/Grate Inlet Protection Y Good Erosion Control Logs Y Good Soil Stabilization N Solid Waste Disposal Y Good Sanitary Septic Y Good Equipment Fueling/Storage Y Good Rock Dam Y Good Concrete washout N Other Site Requirements Yes No N/A Comments Are TPDES permits, for all permittees posted at the construction entrance?Y Is contact information for all permittees posted at the construction entrance?Y Are copies of the inspection reports included with the SWPPP?Y If BMP's have been modified, has the SWPPP been modified?Y Are there any signs of discharge leaving the site?N Are all BMP's functioning as intended?Y Any additional BMP's Required?N Additional Non-Compliance/notes Date: 11/1/2018 Title Inspector Signature Printed Name Greg Bailey In Conformance NOTE: All items of non compliance shall be repaired/installed within (7) days of inspection. Repairs/Installation shall be completed immediately, if storm conditions are imminent. “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” SWPPP - Inspection Report Type of Inspection 14 Day 7 Day Rain Event Project Name: Project Location: Contractor: Date of Inspection Inspector Name Qualifications of Inspector Freeport Parkway Reconstruction Freeport Parkway Coppell, Texas Texas Sterling Construction Co. 11/1/2018 Greg Bailey see SWPPP