Loading...
ST1501A-CS181129 (3) Priscilla Martinez From:Marcus Marion Sent:Thursday, November 29, 2018 3:44 PM To:Priscilla Martinez Subject:Freeport - RFI 26 - Beam Pins This is the response for the RFI 26 From: Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com> Sent: Thursday, November 29, 2018 10:21 AM To: Darryl Zbranek <dzbranek@coppelltx.gov>; Claudio Segovia <claudio@jvolkconsulting.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jay Volk <jay@jvolkconsulting.com>; Eugene Lee, P.E. <Eugene.Lee@aguirre-fields.com> Subject: RE: Freeport - RFI 26 - Beam Pins Darryl, The use of dowels at interior bents is a standard TXDOT Bridge practice to ensure lateral stability of the superstructure. The receiving end of the bridge girder uses a slotted hole which allows for some longitudinal tolerance during installation, so we would not expect any issue to arise during placement. We recommend to keep the dowels as shown in the drawings, unless the contractor has a more specific concern about the placement of the beams. Thanks, Geoff Scheid, P.E. A GUIRRE & F IELDS LP 5320 North Tarrant Parkway, Suite 260 Fort Worth, TX 76244 (682) 325-5446 (Direct) (817) 509-8300 (Main) From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Thursday, November 29, 2018 10:02 AM To: Claudio Segovia <claudio@jvolkconsulting.com>; Jay Volk <jay@jvolkconsulting.com>; Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - RFI 26 - Beam Pins 1 Claudio, Please see RFI 26 from TSC on the beam pins. Please advise. Thanks, Darryl Zbranek Chief Construction Inspector City of Coppell, TX O – (972)304-7090 C – (469) 507-9095 dzbranek@coppelltx.gov From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Sent: Thursday, November 29, 2018 9:27 AM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com> Subject: Freeport - RFI 26 - Beam Pins Darryl, An answer for this is needed before we set the beams in 3 weeks. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | 2