Loading...
ST1501A-CS181218 Daily Field Report - Dec 18, 2018 KLF Project #: 20183887.001A byPatrick MartinCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:TSCTime Start:12:15 PM Types of Tests/Observations Performed: Concrete Documents Referenced: Observations/Remarks: I arrived on project site located off of Freeport Parkway in Coppell, Texas. I was onsite to perform concrete testing and sampling. The mix design being used was Argos #4674CB, with a 3600 PSI. The slump specification was 5-7, with air at 0-3. Jimmy wanted break days of 7, 28, 28, 28, H. When I showed up to the job site, the concrete truck was already dumping his load. They poured the concrete into a bucket that was transported to the desired location with a crane. They poured a Abutment 1 Backwall & Wing Wall containing 10 yards of concrete. I casted 1 set of 5(4x8) cylinders for lab compression testing. Kleinfelder Representative Signature Patrick Martin Kleinfelder Representative Print Name 83820 Reviewed by: Cody Solvin on 12/21/2018 3:44:36 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063