Loading...
Windsor Estates-CS010913 T H E C I T Y O F COl'FELL September 13, 2001 Bryan Peck Excel Group, Inc. 2539 Walnut Hill Ln., Suite 218 Dallas, TX 75229 RE: Windsor Estates Subdivision Fees Dear Mr. Peck: This letter is written as a follow-up to our conversation on September 12, 2001 in which we discussed additional fees associated with a 1 V:-inch irrigation meter. During the course of our conversation the actual number of lots developed in the Windsor Estates Subdivision came into question. Our previous assessment of this project on November 10, 1999 calculated the impact fees based on only 21 lots in the subdivision, with no assessment for an irrigation meter. Because there was some confusion over the number of lots, I referred to the approved plat for Windsor Estates, at which time I noticed that there were 22 residential lots on the approved plat. There are also four common areas. Because there are 22 lots instead of 21, I have revised your impact fees for this development. In addition to revising the impact fees to reflect 22 lots, I included the two irrigation meters as we discussed. One is a 5/8-inch meter; the other is a proposed 1 l/2-inch irrigation meter. The attached Development Fee Worksheet shows 22 domestic meters, one 1 l/2-inch irrigation meter and one 5/8" irrigation meter. Also attached to this letter is a Development Fee Table, which shows the various fees due and payable on Windsor Estates, and also the amounts previously paid, and date(s) we received those payments. The addition of one residential lot and two irrigation meters has increased your Water Impact Fee by $3,150 and your Wastewater Impact Fee by $450. The one additional residential lot increased your Park Fee by $1,285 and your Roadway Impact Fee by $855. In addition to those increases based on an increase in the number of lots, I also noticed that to date, you have not paid your Street Light Assessment or your Street Sign Assessment, and an outstanding Overtime Inspection Fee. Based on my calculation, you have outstanding fees due at this time of $8,541.11 on the Windsor Estates development. This amount needs to be paid prior to acceptance of this development by the City of Coppell. Please contact this office as soon as possible to rectify this fee reassessment issue. Thank you for your consideration of this matter. Sincerely, D[ ~ I-~7..1 [~ {J.~ 0/4 ', Kenneth M. Griffin, P.E. C-~'[~Cx 3"Dr',,) ~'$ , Director of Engineering & Public Works $'/~19~ % I NL ~ .......... DEVELOPMENT FEE TABLE Project: Windsor Estates Revised Date: 9/13/2OOl TOTAL ADDITIONAL FEES DUE AMOUNT DUE BASED ON 22 LOTS Water Impact Fee $12,600.00 $3,150.00 paid 8/23/00 $9,450.00 Water Tap Inspection Fee $1,200.00 $150.00 paid 8/23/00 $1,050.00 Water Meter Fee (Domestic) $564.74 $25.74 paid 8/23/00 $539.00 Water Meter Fee (Irrigationffireline) $161.33 $161.33 $0.00 Water Meter Deposit (Domestic) $770.00 $35.00 paid 8/23/00 $735.00 Irrigation/Fireline Meter Deposit $60.00 $60.00 $0.00 Wastewater Impact Fee $9,900.00 $450.00 paid 8/23/00 $9,450.00 Wastewater Tap Inspection Fee $1,100.00 $50.00 paid 8/23/00 $1,050.00 Utility, Final Inspection Fee $1,100.00 $50.00 paid 8/23/00 $1,050.00 Park Fee $28.270.00 $1,285.00 paid 8/23/00 $26,985.00 Roadway Impact Fee $18,810.00 $855.00 paid 8/23/00 $17,955.00 Street Light Fee $1,760.40 $1,760.40 (100% due prior to Acceptance of Project $0.00 Street Sign Fee $388.64 $388.64 (100% due prior to Acceptance of Project $0.00 Construction Inspection Fee $14,237.92 $120.00 grading paid 5/10/00 $1,000.00 construction paid 8/25/00 $12,997.92 overtime paid 1/17/00 $120.00 overtime $120 due 1/13/0l $0.00 TOTAL $90,923.03 ADDITIONAL AMOUNT DUE BASED ON 22 LOTS $8,541.11 D._/ELOPMENT FEE WORKSHI= 'T PROJECT: Windsor Estates Revised DATE: 9/13/2001 Water Impact Fee: Domestic Meter(s): 22 - 5/8 inch X 314 inch = 22 ESU's Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's 1 - 5/8 inch X 3/4 inch = 1 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 28 ESU's @ $450.00 ea. $12,600.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 24 Connections @ $50.00 ea. $1,200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 22 Domestic Meter(s) @ $25.67 $564.74 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $135.66 $135.66 Total #: 1 Additional Irrigation Meter(s) @ $25.67 $25.67 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 22 Meter(s) @ $35.00 ea. $770.00 (100% due prior to issuance of water meters) Irrigation/Yire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 22 @ $450.00 ea. $9,900.00 Wastewater Tap Inspection Fee: Total #: 22 Connections @ $50.00 ea. $1,100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 22 Lots @ $50.00 ea. $1,100.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Park Development Zone: Zone 2 22 Single-family @ $1,285.00 per lot $28,270.00 0 Multi-family @ $1,285.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $18,810.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. $1,760.40 This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. $388.64 (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. $14,237.92 The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROA~ WAY IMPACT FEE CALCULA'~ ~ONS PROJECT: Windsor Estates Revised DATE: 9/13/2001 ROADWAY IMPACT FEE: Service Area * 2 Category ** Residential Land Use ** Single-Family Detached No. Lots/Units 22 Development Units ** 22.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 ]R°adway impact Fee due = (Devel°pment Units) x ~ ] (Vehicle Miles per Development Unit) x (Fee per Vehicle.. Mile) = $18,810.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) [ A~IOUNTDUE: $18,810.00