Loading...
Windsor Estates-CS 981106 · . Coppell. Texas 75019 November 6, 1998 COA, LLC Kelly Jordan · 308 Park Meadow Way Coppell, TX 75019-3342 Dear Mr. Jordan: This letter is written in response to the on-going review of the flood study for the reclamation of Windsor Estates prepared by Ron Morrison with Morrison Hydrology Engineering, Inc. and reviewed by Walter Skipwith with Halff Associates, Inc. As you are aware the complexity associated with this reclamation far exceeded the original scope of review as is typical on a reclamation project. An additional invoice in the amount of $1,576.35 has been submitted to the City by Halff Associates, Inc. That amount should be paid to the City prior to the submittal of the flood study to FEMA. At this time, I am unsure of the exact status of the finalization of the flood study. As you may be aware, Ron Morrison suffered a heart attack on October 30, 1998. I did speak with his wife on November 2nd and at that time Ron was still in the hospital awaiting additional tests. Quite honestly, I am unsure what impact this will have on the finalization of your report and the submittal to FEMA. However, the project cannot move forward until the report has been finalized, accepted by the City and submitted to FEMA for their review. If you should have any questions please feel free to contact me at your convenience. Sincerely, ~ Kenneth M. Grif-f'm~ P.E. Director of Engineering and Public Works