Loading...
Windsor Estates-CS 980707Kimley-Horn and Associates, Inc. · FO. Box ~218 July 7, 1998 Suite 102 8200 S:cnebrook ParKway F'i$co. "exas 7503z Mr. Mike Martin Assistant City Engineer City of Coppell 255 Parkway Blvd. Coppell. Texas 75019 Re: l~ndsor Estates - Construction Drawing Submittal #1 Dear Mike: Per our recent telephone conversation, enclosed you will find two (2) sets of the engineering construction drawings for the Windsor Estates Subdivision. Thc Developer/Owner (Kelly Jordan) has instructed KHA to submit the construction drawings to begin the City's review process. We would like to inform the City of a few elements of the design that are relevant to the City's 1~ review: · Shallow sewer system (approved during Preliminary Site Plan and Platting process). · Deforest offsite roadway has been raised out of the floodplain (to Allen). · Ron Morrison to complete the tlood study (Initial submittal already reviewed by Halff & Associates). · The proposed Entry Drive has not been revised from the original design. We appreciate you and your staff's assistance with this review process. If there are any other questions or comments concerning our submittal, please don't hesitate to call. Sincerely, KIMLEY~HORN AND ASSOCIATES, INC. Michael S. Allen Analyst cc: Kelly Jordan (vd attach) Ron Morrison (w/attach) Greg Burns File (v,7 attach) TEL 972 335 3580 FAX 972 335 3779 -.