Loading...
ST9801-CS000412TELEX 820590 TELEPHONE (214) 358-6581 FAX (214) 352-3201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 !0605 HARRY HINES DALLAS. TEXAS 75354-0787 DALLAS. TEXAS 75220 April 12, 2000 Mr. Kevin C. Young, E.I.T. Freese and Nichols, Inc. 170l N. Market, Suite 500, LB 51 Dallas. Texas 75201 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01. Dear Mr. Young: The following prices are for the various subgrade stabilization/paving options for the SH 121 to Parkway Boulevard portion of the referenced project that were requested on April 12, 2000: Option 1: Cement Stabilization (slurry application) Cement Stabilization 13,436 SY $3.91 per SY $52,495.66 Cement 390 TNS $144.00 per SY $56,160~00 $108,655.66 Option 2: Delete 1" of concrete pavement (credit) Unclassified Excavation Concrete Pavement, delete 1" 422 CY $5.00 per CY $2,110.00 12,803 SY $1.61 per SY $20,612.83 $22,722.83 If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, Project Engineer Company XC: Mr. Kent Col l ins, P.E.. Engineering and Public Works, City of Coppell 255 Parkway Blvd., Coppell, Texas 75019:4409 AN EQUAL OPPORTUNITY EMPLOYER