Woodridge-CS 870107 (2) MINUTES
CITY OF COPPELL
DEVELOPMENT REVIEW COMMITTEE
Janurary 7, 1987
DRC MEMBERS PRESENT:
Taryon Bowman, Chairperson, Dale Jackson, Troy
Glidewell, Steve Morton, Richard Milner, Jerry
Davis, Glen Fabian and Terry Phillips.
Page 2
PETITIONER:
Rod Zielke, P.C.
Lichliter/Jameson & Associates
1420 W. Mockingbird, Suite 300
Dallas, Texas 75247
ENGINEER
or
Consultant:
Lichliter/Jameson & Associates
1420 Mockingbird, Suite 300
Dallas, Texas 75247
1st Review of:
WOODRIDGE VI - FINAL PLAT:
ENGINEERING: Contact Shohre Daneshmand @ 462-0022
1) Delineate owner's name and their addresses on the cover
sheet.
2) Coordinate with Ginn, Inc. on 20' easement on the
southeast corner of the property.
3) Double check the ~mlets collecting flow from drainage
area B-I, B-2 and B-3; also inlets for DA, A-l, A-2 and
A-3; the two inlets on each street can not collect same
amount of flow. One inlet should be larger than the
other.
4) Delineate Floodway Line on Drainage Area Map (if any
filling is required).
5) At street intersections, show an arrow for "Gutter Flow"
(if any).
6) Storm sewer pipes and hydraulic grade line should be
double checked. (Pipes are under pressure).
7) Add Drainage Calculation Chart to the Drainage Area Map.
8) On the storm sewer profiles, show the capacity (CFS) for
each section of the pipe along with Q, S, V, ....
9) Check with Fire Marshal for fire hydrants. On Pond
Drive, add a fire hydrant.
10) Wherever there is a concrete easement, put a note saying
what the linear footage of encasing is.
11) Check the distance between the M.H. on line "A" S.S. and
7' X 2' box culvert crossing, concrete encasing may be
required.
12) I have met with the Engineers on Monday, January 1, 1987
and have discussed most of these comments with them.
13) Provide Construction Cost Estimate six (6) working days
prior to Final Plat submittal to City Council.
Page 3
BUILDING INSPECTION:
1) Need clarification on whether screening wall is required
where rear lots are adjacent to landscaped area along
MacArthur from P & Z.
2) List number of lots on plat.
3) Need clarification on whether SF-O setbacks would apply
to TH-1 zoning.
FIRE:
1) Highland Street - name needs to be changed.
LONE STAR GAS:
1) No representative was present.
GENERAL TELEPHONE:
1) Final Plat is not acceptable. See attached easement
request submitted 11/86 - with corrections will be OK.
COPPELL CABLEVISION:
1) Service is available.
2) Change T P & L easement to Utility Easement 5' BL to 5'
utility easement.
U.S. POSTAL SERVICE:
1) Cluster boxes (NDCBU) recommended.
DEVELOPMENT INSPECTOR:
1) Permission to drain and temporary construction easements
on all Discharge Points.
2) Brick pavers on entry should be shown on paving plans.
TEXAS POWER AND LIGHT:
1) Final Plat is acceptable.
PARKS AND RECREATION:
1) Unable to obtain comments from Public Works Department,
please contact Steve Goram, Director of Public Works.
PLANNING AND DEVELOPMENT:
1) The following lots must face north on the front yard;
Block 6, Lot 20; Block 5, Lot 17; Block 4, Lot 16: Block
3, Lot 12; and Block 2, Lot 10.
Page 4
2)
3)
4)
5)
The following lots must face south on the front yard; Block 5,
Lot 18; Block 4, Lot 17; Block 3, Lot 13; Block 2, Lot 11; and
Block 1, Lot 19. This information must be shown on the f~nal
plat or plans.
Revisions must be submitted by 3:00 p.m. on Monday, January
12, 1987 to be eligible for January 15, 1987 Planning and
Zoning Commission action.
This item is tentatively scheduled for January 15, 1987
Planning and Zoning Commission action.
Please submit a written response to all comments in the form
of a letter when corrections are returned.