Loading...
Woodridge-CS 860318GINN, INC. March 18, 1986 Ms. Stephanie Fess Lomas and Nettleton 2001 Bryan Tower, #3500 Dallas, TX 75201 C()NSI LTING ENGINEERS Re: Woodridge Street Lighting Project Dear Ms. Fess: Please find enclosed copies of the latest correspondence on the above referenced project. In August 1985, Mayor Duggan stated that he had been assured by the Lomas & Nettleton Development Company that they would be willing to donate as much as $7,500.00 toward this project. After reviewing the scope of work required to install the twelve lights, TP&L estimates that the total preliminary cost of these improvements will be approximately $3,719.00 (see enclosed letter). TP&L will be sending you a contract agreement for the installation of the twelve lights and appurtenances. During the interim, we would greatly appreciate a letter of commitment from Lomas and Nettleton acknowledging their intent to execute the contract which would cover the installation and materials cost for these lights. This letter will enable TP&L and the Woodridge Homeowners Association to start the next phase, which is procuring easements needed to install the conduit runs for these lights (see enclosed letter). We appreciate your time and efforts in this matter. call if you have any questions. Please Sincerely, Kevin Peiffer /sr Enclosures CC: Mayor Lou Duggan Frank Proctor Ed Powell Glenn Fabian Wayne Ginn