Loading...
PA9702-LR000505 CONCRETE COMPRE IVE STRENGTH TES_/' a division 8901 Carpenter Fnvy., Suite #100 Dallas, Texas 75247 DateofService: 04/06/2000 Report No.: 0009228 Report Date 05105/2000 Client No.: COPPELL Project No.: 94991118 Client: City of Co ll Project: Coppell Aquatic/Recreation Ctr Bra ;;id 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ocati~ns~perf~rmrequired~e~dtestand~ast compressive strength samples. PROJECT DATA CONTRACTOR: I-Iisaw & Assoc. MIX I.D.: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 04/06/2000 BATCHTIIV/E: 7:20a111 PtANT: N/A Tram SAMPLED: 8: 15alTl BY: Conan Cantwell SPECIFICATION REQUIREMENTS WEATHER CONnrrlONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)~ Ant 57 F CONCRETE: 68 I~ sLtr~e: 5.0" Max TRUCK NO: 218 T~CKtTNO: 83578 AIR: 3-6% AIRCONTENT(%): 3.2 UNrrWEIGnT(pc~: N/A TEST M~rttOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 pedesum traffic area; northeast side of building ASTM C-39 SAMPLE LOCATION: 10' N, 25' W of NE bldg. comer REPORT OF TESTS ACCtr 4t W vAnns: 10 CYLINDER MEASURED MAXIMLrM COMPRF_,SS1VE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE 1 1 5.00 04/I3/2000 7 102130 3610 1 2 5.00 04/13/2000 7 103750 3670 Average 3640 1 3 5.00 05/04/2000 28 138860 4910 1 4 5.00 05/04/2000 28 141350 5000 Average 4960 Technician: Conan Cantwell Started: 7:00am Finished: 9:00am I~apa~,i27~,inc Report Distribution: ' (1) City of CoppeH (1) City ofCoppell - Engineering (1) Briuldey Sargent Architects (1) City ofCoppell - Bldg. Insp. (1) Turner Engineers (1) City ofCoppull - Leisure Sen, Dept Senior Project Engineer (1) Hisaw & Associates This report is exclusively for the use of die cheat indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1