Loading...
ST9801-CS000403'~~p~;eBoC~t4yTy~th A Beautiful Future COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 April 3, 2000 Robert Weber Ed Bell Construction Co. P.O. Box 540787 Dallas, TX 75354-0787 RE: ST98-01 / Coppell Road Reconstruction (SH 121 to Sandy Lake Road) Dear R. Weber: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, April 1, 2000. The overtime rate including salary and benefits is $30.00 per hour. Seven hours were charged to your company on that date. Please send a check for $210.00 payable to the City of Coppeil to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely, Larry 'elY~isC/"~""" Construction Inspector CC: Finance DeparUnem Debi Ingrain, Engineering Secretary ~ent By: EBCC; FAX (2t 4) 352-3201 2143523201; Map,;~a~00 12:55PM; Page 2/2 TELEPHONE (214) 358-6~81 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10806 HARRY HINES DALLAS. TEXAS 75354-0787 DALLAS. TEXAS 76220 FebruaW 16, 2000 Mr. Larry Davis Engh~eering and Public Works City of Coppcll 255 Parkway BIrd. Copptdl, Texas 75019-4409 Coppell Road Reconstruction SH 121 to Sandy Lake Road Copper Project #: ST 98-01 Dear Larry; It is our intent to begin rcmoval of the asphalt paving on ph_ase 1 of the referenced project on April 1, 2000. As a result, we request that wc I~c permitted to wodc on April 1, 2000 'aDd Lhat the appropriate level of inspection be available on that day. If you have m~y questions regarding this request, don't hesitate to contact our office. Sincerely, ~ Bcl~onr~: 'on Company Robert D. Weber Project Engineer AN EQUAL OPPORTUNITY EMPLOYER FAX (214) 352-3201 TELEPHONE (214) 358.-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 March 30, 2000 Mr. Larry Davis Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Larry: It is our intent to begin removal of the asphalt paving on phase 1 of the referenced project on April 1, 2000. As a result, we request that we be permitted to work on April 1, 2000 and that the appropriate level of inspection be available on that day. If you have any questions regarding this request, don't hesitate to contact our office. Sincerely, E~C~sC~on Company Robert D. Weber Project Engineer AN EQUAL OPPORTUNITY EMPLOYER