Loading...
ST9801-CS000403 (2)FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 April 3, 2000 Mr. Kevin C. Young, E.I.T. Freese and Nichols, Inc. 1701 N. Market, Suite 500, LB 51 Dallas. Texas 75201 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Mr. Young: The following prices are for the various subgrade stabilization/paving options for the SH 121 to Parkway Boulevard portion of the referenced project that were discussed at the March 30, 2000 progress meeting: Option 1: Cement Stabilization (dry application) Cement Stabilization 13,436 SY Cement 390 TNS $3.91 per SY $52,495.66 $100.00 per SY $39,000.00 $91,495.66 Option 2: Cement Stabilization (slurry application) EBCC currently doesn't have the equipment necessary to apply slurried cement. Option 3: Extra 1" of concrete pavement on lime treated subgrade Unclassified Excavation 422 CY $5.00 per CY Extra 1" of Concrete Pavement 12,803 SY $3.71 per SY $2,110.00 $47,499.13 $49,609.13 Option 4: Extra V2 sack of cement for pavement on lime treated subgrade Cement (Extra ¼ sack) 3,275 CY $2.44 per CY $7,991.00 If you have any questions regarding this information, don't hesitate to contact our office. Si, n~rely, kl,~.l~l~o struct~! Company Robert D. Weber Project Engineer xc: Mr. Kent Collins, P.E., Engineering and Public Works, City of Coppell 255 Parkway Blvd., Coppell, Texas 75019-4409 AN EQUAL OPPORTUNITY EMPLOYER