Woodlands-LR 951013ALPHA TESTING, INC.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF CONCRETE
COMPRESSION TEST
TESTED FOR:
W.O.C. INVESTMENTS, INC.
C/O FINLEY DEVELOPMENT
ADDISON, TEXAS
D~EOFISSUE: OCTOBER 13, 1995
PROJECT:
WOODLANDS OF COPPELL
COPPELL, TEXAS
OUR REPORT NO.:
95230-58
FIELD DATA
LOCATION OF CONCRETE PLACEMENT
DATE PLACED
TIME
SLUMP (ASTM C-143)
AIR CONTENT (ASTM C-231 [] OR C-173 [] )
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMITTED BY
INLET, THROATS STATION 9+42
MANCHESTER LN.
10/06/95 PLANT N/A
N/A DELIVER TICKET NO N/A
N/A MIX PROPORTIONS (SSD) N/A
N/A CEMENT N/A
N / A WATER N / A
N / A FINE AGGREGATE N / A
10/07/95 COARSE AGGREGATE N/A
CL I ENT ADMIXTURE N/A
MIX DATA SUBMITTED BY
SPEC,MENS CAPPED ,N ACCORDA.CE []
COMPRESSION TEST RESULTS
(NOMINAL CYUNDER SIZE 6" X 12")
(AS'TM C-39)
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH, PSI
79 [.AB 10/13/95 ? 109,910 28.27 3,890
80 LAB 11/03/95 28 28.27
Specifications 2 8 3,0 0 0
REblARKS
.[~ Cylindem made by ALPHA · representedve.
[] Cylindem made by Amhitect's
or Contractor's representative.
Cl~yli~ers picked up by ALPHA
laborato~.
[] Cylindem delivered to ALPHA
laboraton/.
[] Compression test results comply with
applicable specifications.
[] Compression test results do not comply
[~b,~lcable specifications.
NT MADE
lly Submitted
STING, INC.
DAVID P. STETTNER