Loading...
Woodlands-LR 951013ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: W.O.C. INVESTMENTS, INC. C/O FINLEY DEVELOPMENT ADDISON, TEXAS D~EOFISSUE: OCTOBER 13, 1995 PROJECT: WOODLANDS OF COPPELL COPPELL, TEXAS OUR REPORT NO.: 95230-58 FIELD DATA LOCATION OF CONCRETE PLACEMENT DATE PLACED TIME SLUMP (ASTM C-143) AIR CONTENT (ASTM C-231 [] OR C-173 [] ) AIR TEMPERATURE CONCRETE TEMPERATURE DATE RECEIVED FIELD DATA SUBMITTED BY INLET, THROATS STATION 9+42 MANCHESTER LN. 10/06/95 PLANT N/A N/A DELIVER TICKET NO N/A N/A MIX PROPORTIONS (SSD) N/A N/A CEMENT N/A N / A WATER N / A N / A FINE AGGREGATE N / A 10/07/95 COARSE AGGREGATE N/A CL I ENT ADMIXTURE N/A MIX DATA SUBMITTED BY SPEC,MENS CAPPED ,N ACCORDA.CE [] COMPRESSION TEST RESULTS (NOMINAL CYUNDER SIZE 6" X 12") (AS'TM C-39) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 79 [.AB 10/13/95 ? 109,910 28.27 3,890 80 LAB 11/03/95 28 28.27 Specifications 2 8 3,0 0 0 REblARKS .[~ Cylindem made by ALPHA · representedve. [] Cylindem made by Amhitect's or Contractor's representative. Cl~yli~ers picked up by ALPHA laborato~. [] Cylindem delivered to ALPHA laboraton/. [] Compression test results comply with applicable specifications. [] Compression test results do not comply [~b,~lcable specifications. NT MADE lly Submitted STING, INC. DAVID P. STETTNER