Town Center L4B1-LR011126 (2) ALPHA TESTING, INC.
Concrete
Test
P209 Wisconsin St., Suito 100 , om ,resslon
(972) 620-8911
Tested For: CONSTRUCTION MANAGEMENT GROUP Our Report No.: 01612-36
ATTN: MR. JEFF MILLER Issue Date: 11/26/2001
.o, .c. ... ,.u. s... .._s, . ,.o, _
Fax Numbe~ '% "
Project I~sc: COPPELL TOWN CENTEy
~.~PPELL, TX_
FIELD DA TA
Placement Location: GRADE BEAM, 30'S & 4'E FROM THE NW CORNER OF THE BUILDING
Date Placed: 10/25/01 Plant Number: 89-3000
Time Placed: 12:30 PM DallveryTicket No.: 89003910
Slump (ASTM C-143): 5 Made By: ALPHA
Air Content: N/A
Air Temperature: 85 Cured Specification: ASTM C-31
Specimen Temperature: 88
Date Received: 10/25/01
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By: YEOMAN, RONALD
Mix Data Submitted By:. BF_.ALL
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max ~
60 LAB HOLD HOLD 12 N/A 6 28.27
Specifications: 28 3000
Resulta to Data: PASS
Notes:
CC: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP
w~th express approval of AU~HA. The use of our mlnte and ~ results must receive our wrlt~n approval. Test ~lts and repons apply only to the samples tested and/or
observed, and are not Indicative of ~e qualities of apparent~/Identical or dmllar specimens.
.~.~;~ ..... I~ ~ I1~1 III I I~IF~
~..; ....... _. ....... ,, ,. ,~_~..,, II1~11' I1' ........ "I I1' '1' :ri,":::: :': _._:-::: ::: :.:::::~