Loading...
Town Center L4B1-LR010918 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 220~ Wisconsin St., Suite 100 Dallas, Texas 75229 972/62~8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR CONSTRUCTION MANAGEMENT GROUP DATE 09/18/01 DALLAS, TEXAS PROJECT COPPELL TOWN CENTER OUR REPORT NO. 01612-16 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 24 09/18/01 FG 1 15.5 101 15.6 98 97 1 -A 25 09/18/01 FG 1 15.5 101 17.5 102 101 1-A 26 09/18/01 FG 1 15.5 101 18.0 99 98 1-A 27 09/18/01 FG 1 15.5 101 18.1 101 100 1-A 28 09/18/01 FG 1 15.5 101 17.6 100 99 1-A TEST LOCATION: 24 WEST PARKING AREA, 15' NORTH AND 20' EAST FROM SOUTHWEST CORNER 25 WEST PARKING AREA, 24' NORTH AND 20' WEST FROM SOUTHEAST CORNER 26 WEST PARKING AREA, 65' NORTH AND 45' WEST FROM SOUTHEAST CORNER 27 WEST PARKING AREA, 25' EAST AND 25' SOUTH FROM NORTHWEST CORNER 28 WEST PARKING AREA, 35' WEST AND 20' SOUTH FROM NORTHEAST CORNER 3. LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Our test results & reports are for the excl~lslye use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or dis exp,'ess appraisal ALPHA. The use of out'name&test results must receive our written approval Test results & repo.s apply only to the samples tested and/or ob .... d, and ffibuted ex, iR:~ are not intJlcatlve of the ( )f apparently idi~htical o~' similar specimens. Geotechnical Engineenng · Construction Materials Teshng · Environmental Engineering · Consulting