Town Center L4B1-LR010913 (2) ALPHA TESTING, INC.
2209 Wisconsin St., Suite I00
Dallas, Texas 75229
972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT
FAX: 972/406-8023
TESTED FOR: CONSTRUCTION MANAGEMENT GROUP DATE: 09/13/01
DALLAS, TEXAS
PROJECT: COPPELL TOWN CENTER OUR REPORT NO: 01612-20
COPPELL, TEXAS
TECHNICIAN: J.O.
WEATHER: CLEAR TEMPERATURE RANGE:
THE ALPHA REPRESENTATIVE TRAVELED TO ABOVE REFERENCED PROJECT TO INITIATE PIER OPERATIONS.
WHILE ON SITE ALPHA REPRESENTATIVE REVIEWED FOUNDATION PLANS AND SPECIFICATIONS WITH
CONTRACTORS REPRESENTATIVE. DURING INITIAL OBSERVATION OF PIER EXCAVATION, WATER WAS
ENCOUNTERED AT 12' MIN. PIER DEPTH SPECIFIED. THE ALPHA REPRESENTATIVE INFORMED STRUCTURAL
ENGINEER WHO REVISED SPECIFICATIONS TO ALLOW THE TOTAL PIER DEPTHS TO BE BROUGHT UP TO 9'
MINIMUM.
THE ALPHA REPRESENTATIVE LEFT SITE, AFTER MEETING WITH CONTRACTOR'S REPRESENTATIVE AND
MONITORING INITIAL PIER EXCAVATION, LEAVING AN ALPHA TECHNICIAN ON SITE TO CONTINUE
MONITORING PIER OPERATIONS.
CC:
LARRY DAVES, CITY OF COPPELL
LEE STONE, CITY OF COPPELL
Our test results and repcxts are for the exclusive use of the ctiant (and their cle~gnatsd rectpiants on file in our office Isblbuted exce~ot with expre~, apl:aovel of
ALPHA. The use of our name and test results must receive our ~ al:q)rovel. Test results and rep(xts aPl:dy only to the samples tested and/or olssen~ed, and are no( Indicative of the qualltJse of
apl:xaranUy Identical (x similar specimens.
Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting