ST9801-CS000317P.O. Box 478 Coppell, Texas 75019 972'-462-0022 March 17, 2000 RE: Coppell Road Project #ST98-01 (Sandy Lake Road to SH121) Dear Coppell Citizen: The Coppell Road reconstruction project' has progressed over the past. few months with. the focus being on completion of the water line and progress on storm drain work. The contractor for the project has notified the city that Phase One of the paving construction will begin on March 29th. Phase One will include paving and drainage improvements to the east-west portion of Coppell Road and will entail closure of the road from the SH121 frontage road to the main entrance of The Mansions Apartments (see map on back of this letter). Again, Coppell Road from SH 121 to the main entrance of The Mansions will be closed to all traffic beginning March 29, 2000. The estimated time of the phase one construction is eight weeks. Advanced signing will be used to wam motorists of the closure and direct traffic to other routes; particularly Canyon Drive, Coppell Road and SH121 Frontage Road. Please plan on using these altemate routes for the duration of.Phase One. Details on the later phases of paving construction are still under consideration, but the City will work to maintain traffic flow as much as possible. Any long-term lane closures will require approval from Staff and City Council. If you have any questions regarding this project or any information provided in this letter, please contact Larry Davis, Inspector, or me at (972)304-3679, or Gary Pryor with Ed Bell Construction at (214)358-6581. Respectfully Yours, Kent Collins, P.E. Civil Engineer A N SCALE'. 1° = 500' !~1 Business Road ~ ~//111,31 ~11111-1 L ... ~ SANDY LAKE ROAD ID