Wynnpage Plaza-CS011026 October 26, 2001
Marc Bentley, P.E.
Bentley Engineering, Inc.
702 Gatewood Drive
Garland, Texas 75043
RE: Wyrmpage Plaza Lotl Block A
Fee Assessment Letter
Dear Mr. Bentley:
Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the mount of $5,625.90 and forward the check to
the Engineering Department along with a copy of the Fee Assessment Table. This amount is the
portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy
of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee
can be verified.
Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water
and Sewer Impact Fees until the issuance of a Building Permit.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be
paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be
ordered when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please feel free
to contact me at your convenience.
Sincerely,
Director of Engineering/Public' Works
cc: ~l~,~-~l~onm F~ .~:~3..o~.'.'.-.;: !:-..'-.,..
Rhonda Brothers, Engineering Sccrctm'7
Glenn Hollowel], Assistant Director of Public Works
Oreg Jones, Chief B~Iding OfficiaI
Gary Sims, Director of Leisure Services
255 PARKWAY ~ P O BOX 478 1It COPPELL TX 75019 dr TEL 972./462 0022 ~' FAX 9721304 3673
DEVELOPMENT FEE TABLE
Project: Wynnpage Plaza Lotl Block A
Date: 10/26/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,100.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $142.10
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigationffireline) $62.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $5,625.90 $5,625.90
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $9,590.25
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,625.90
DEVELOPMENT FEE WORKSHEE1
PROJECT: Wynnpage Plaza l. otl Block
DATE: 10/26/2001
Water Impact Fee:
Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's
Irrigation Meter(s): I - 1 inch = 2.5 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 7.5 ESU's @ $280.00 ea. $2,100.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: I Domestic Meter(s) @ $142.10 $142.10
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $62.25 $62.25
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due pdor to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: I Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5 @ $280.00 ea. $1,400.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea. $50.00
(100% due pdor to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: 1 Lots (~ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE. WORKSHEr' r
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0 Single-family @ $0.00 per lot $0.00
0 Multi-family (~ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $5,625.90
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULA'I~IONS
PROJECT: Wynnpage Plaza Lotl Block A
DATE: 10/26/2001
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Office
Land Use ** General Office Bldg.
Building Area (sO 4,700
Development Units ** 4.70
Vehicle Miles per Development Unit **
Fee per Vehicle Mile *** [ $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $$,625.90
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
] AMOUNTDUE: $5,625.90