Loading...
Waterside P2-CS 930722 COPPELL PUBLIC WORKS MEMORANDUM DATE: JUly 22, 1993 TO: Larry Davis, Construction Inspector FROM: ~0~ey Gonzales, Streets Superintendent RE: ~Waterside II Estates Phase II - Walk Through Staff has performed a follow up walk through of this subdivision and found that the following items need to be corrected: 1. Greenway and Westlake Drive - The southwest corner @ Redwood curb needs to be patched. 2. Westlake Drive - Clean out wood and debris from the first drop inlet. 3. Shorewood - At the existing concrete and new concrete in the westbound lane @ Redwood needs to be resealed. 4. Shorewood & Westlake - Westbound @ the last curb on Redwood - ear missing. /dm cc: file WALKTHRU.HLP/WATRSIDE.RG