Loading...
Waterside P2-CS 930722 (4) DA,--'~. DOWDEY AND ASSOCIATES,CC. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 July 22, 1993 Mr. Ken Griffin, P. E. City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: Erosion Control Waterside Estates No.2 Phase Two Dear Ken: Per Larry Davis' request, I have estimated the cost of the silt fence on this project. The total linear footage is approximately 925 L.F. The unit cost is $1.35/L.F. The total cost is $1248.75. the check written by Standard Pacific of Texas is $1250.00 I understand that this money is in an escrow fund for two years and will be refunded to the developer two years after .the final acceptance of the development. Sincerely, William A. Anderson, P. E. WAA; j rb / Standard Pacific of ri eXa, aC. TEA~ L~,~'N]-K 2 6 7 5 Now known ~ [}a.k {H .~x~ NA //5525 ~,IAC.ARTHUR BLVD., SUITE 580 PH. 214-550-0426 5,~c,,.,~,,n~ /,/-- . IRVING, TEXAS 75038 7/22 ~9 ~3 32-97/1110 One thousand, two hundred, fifty & NO/100 .1,250 00 DOLLARS $ ' PAY. TO THE City of Coppell ORDER OF ,'OOi]F~?5,' I."h~-~.oooq?3,: ,'5?P, OOO],h3,°,ll' DETACH AND RETAIN THIS STATEMENT STANDARD PACIFIC OF TEXAS, INC. The A~AC}~ED CH~CK IS IN PAYMENT OF ~rEMs O~CR'O~O B=LOW' DELUXE FORM WVO-4 V-4744 OISTRIBUTIONS DATE DESCRIPTION AMOUNT ACCT. NO. AMOUNT 7/22/93 Escrow money for Waterside Estates Phase II - ~rosion Cont]'ol 52/117 ~ 0024 1,250.00 M729 3-2DDAD-35