Loading...
Waterside P2-CS 930719 (3) DEVELOPMENT FEES IIPROJECT NAME: Waterside Estates II Phase II IENGINEER: Dan M. Dowdey IREVISION DATE: 7/19/93 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 1/27/92 * Park Fee $5,100.00 $5,100.00 4/22/92 Water Impact Fee $44,200.00 $44,200.00 4/22/92 Wastewater Impact Fee $15,300.00 $15,300.00 4/22/92 Street Sign $989.23 $989.23 4/22/92 Street Light $2,926.00 $2,926.00 7/17/92 Construction Inspection $3,862.50 $3,862.50 2/12/93 Paving Inspection $4,548.34 $4,548.34 4/8/93 Irrigation $7,095.00 $7,095.00 * 8/4/92 Street Escrow Street Cut Permit 4/22/93 Overtime Inspection $232.00 5/13/93 Overtime Inspection $116.00 $116.00 6/29/93 7/16/93 Overtime Inspection $232.00 $232.00 7/19/93 7/19/93 Overtime Inspection $116.00 Grading Inspection $316.84 $316.84 9/16/92 Erosion Control $2,500.00 $2,500.00 8/19/92 Total Fees Fees Paid Amount Owed TOTALS $87,533.91 $87,185.91 $348.00 NOTES * Waterside II Phase II fees were seperated from Phase I * Irrigation fees were paid including: Impact, deposit, inspection,and meter 2/9/93 Informed David Carlton he still needed const, inspection fees, contracts & EPA-NOI Prior To Construction Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. 2/15/93 E.P.A.-N.O.I. Recd. Paving Bond Recd. 2/9/92 Cont. Plan Recd. Utilities Bond Recd. 5/2/92 Irrigation Plan Recd. Irrigation Plan Approved Homeowner's Maint. Erosion Control Escrow