Loading...
Wynnpage-CS 920406 (2) ~IEPIELA INTER~T$, IRC;. Re~], Est,gte De:e~)'.)me,,t a;':d Investme,'ts , By: Engineering April 6, 1992 Mr. Lan5' Davis City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 RE: Irrigation System and Grass in median of Denton Tap Road - Wynnpage Dear Lan3': We are aware that we need to complete the irrigation installation in the median of Denton Tap Road. Lacy had installed a sleeve to cart3~ the control wires under the new median paving section. Upon investigation the irrigation contractor has found the he cannot get through this sleeve. Lacy has contacted the Park Director to rezone the irrigation system and complete the installation. We recognize the problem and will resolve the situation within the week. My understanding from the pre-construction meeting was the the Parks Department was to handle the grass replacement in the median section where there was construction because they had not determined if they wanted to change their plans for grass. If that is not the understanding of the Parks Department, then upon completion of the irrigation system, we will hydromulch the median to establish grass in that median. Thank you for your consideration in this matter. If you have any questions, please feel free to contact me at my office. Best regards, c: Waymon Levell Kevin Kendrick Bill Jones L.H. Lacy Id 5001 LBJ FREEWAY, SUITE 830 · DALLAS, TEXAS 75244 · (214) 960-2777 FAX: (214) 960-2660