Loading...
Waterside P2-CS 930513May 13, 1993 Superior Utilities, Inc. P.O. Box 810545. Dallas, TX 75381-0545 RE: Waterside Estates No. 2 Phase Two Dear Sir: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, May 8, 1993. The overtime rate including salary and benefits is $29.00 per hour. Four hours were charged to your company on that date. Please send a check for $116.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. Sincerely,~_ ~ Larry Davis Construction Inspector cc: Finance Department Doug Stevens, Engineering Technician file/ovt.ltr MIqY-13-1993 01:02PM FROM SUPERIOR UTILITIES, INC. TO 39~0948 P.02 SUPERIOR UTILITIES, I c. May 5, 1993 Larry Davis City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Reference: Waterside Estates No. 2 Phase Two Dear Mr. Davis: We ·request pemission to install work on the referenced pmoject Saturday, May 8, 1993, weather permitting. If' you should need any further information please contact Sincerely, SUPERIOR UTILITIES, lINC George ~. Woodley, Jr. Vice President GWW:pc cc% File P.O. Box 810545 - Dallas, Texas 75381-0545 · 214-247~6564 - FAX 214-247-5643 TOTRL P.02