Wynnpage-CS 920327 MEMO
DATE: March 27, 1992
TO: Howard Pafford, Water Utilities Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Troy Glidewell, Fire Marshal
Gary L. Sieb, Director of Planning and Community Services
Ben dela Cruz, Engineering Technician
Ken Griffin, City Engineer
Shohre Daneshmand, Civil Engineer
Taryon Bowman, P&Z Coordinator
Dale Jackson, Building Inspections
FROM: Larry D .3Con, .cUo,
RE: WYNNPAGE ADDITION - FINAL WALK THRU
A final walk thru of the above listed project has been requested for
Wednesday, April 1, 1992, at 9:00 a.m.,for paving and utilities.
If I can be of further assistance, please let me know.
Thank you.
CLD/lsg
WYNPWLK.THR
COPPELLMEMORANDuMPUBLIC WORKS ~~
DATE: March 27, 1992 ~
TO: Larry Davis, Const. Inspector
FROM: Roy Gonzales, Streets Superintendent~
RE: Wynnpage -- Second Walk Thru Temporary Release
Staff looked at this project again this morning and found that two
(2) of the discrepancies still exist. These are as follows:
-- Curb joint(s) still need repair.
-- Left turn buttons need to be placed.
Please advise when these items are complete.
RG/bc
STWYNN.RG
d ' ,, l
COPPELI~ PIJBLIC WORKS [
DATE~ March 27, 1992
TO= Larry Davis, Construction Inspector
FROM~ Howard Pafford, Utility Superintenden \
Final Walk-through for Wynnpage Addition
Water/Sanitary Sewer Only
Field personnel conducted a partial final walk-through on the above
referenced subdivision yesterday morning at 8=30 a.m. The
contractor was able to correct those deficient items found during
the walk-through and field staff looked at those corrections at
3=00 p.m.
At this time no deficient items are found to exist in the area
designated for partial release on this project.
If you have any questions regarding this matter, please advise.
cc~ Steven G. Goram
Director of Public Works