Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Waterside P2-CS 930209 (2)
DEVELOPMENT FEES IIPROJE(T Waterside Estates II Phase II NAME: IENGINEER: Dan M. Dowdey IREVISION DATE: 2/9/93 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 1/27/92 ~ Park Fee $5,100.00 $5,100.00 4/22/92 Water Impact Fee $44,200.00 $44,2.00.00 4/22/92 Wastewater Impact Fee $15,300.00 $15,300.00 4/22/92 Street Sign $989.23 $989.23 4/22/92 Street Light $2,926.00 $2,926.00 7/17/92 Construction Inspection Irrigation $7,095.00 $7,095.00 ' 8/4/92 Street Escrow Street Cut Permit Overtime Inspection Grading Inspection $316.84 $316.84 9/16/92 Total Fees Fees Paid Amount Owed TOTALS $75,927.07 $75,927.07 $0.00 NOTES ' Waterside II Phase II fees were seperated from Phase I ' Irrigation fees were paid including: Impact, deposit, inspection,and meter E.P.A.-N.O.I. Recd. 2/9/92 Const. Plans Approved 5/2/92 Irrigation Plans Recd. Homeowner's Maint.