Wynnpage-CS 920313March 13, 1992
Mr. Ken Griffin, P.E.
City Engineer
City of Coppell
P.O. Box 478 ~~
Coppell, Texas 75019
Re: ~W~ynnpage ~~
-Cop~ 1~' Texas
90051-0
Dear Ken:
It appears that all required work within public Right-of-Way will
be completely constructed by the end of this week. Please schedule
a final construction walk through with your staff and other City
Departments at your earliest convenience. As you are aware, we are
trying to get Wynnpage Drive accepted in order that model homes can
begin. We would like to break the acceptance of this addition into
two phases. The first being those lots either side of Wynnpage
Drive, and the second acceptance would be for the entire
subdivision. The final walk through of the entire subdivision
should be scheduled one week after the initial walk through of the
Wynnpage Drive acceptance.
If you have any questions, please feel free to call.
Sincerely,
Kevin R. Kendrick, P.E.
Project Manager, Associate
KRK/Dp
xc: Larry Davis / City of Coppell, Engineering Department
Steve Gorum / City of Coppell, Utility Department
Floyd Key / Legend Construction
Bill Black / L.H. Lacy Company
Greg Rich / Siepiela Interests, Inc.
Waymon Levell / JWL Investments
Ray Gonzales / city of Coppell, Department of Finance
PAUL $ U,",Z;CKER. PE DAV'D M. SCH?~UF~BUSCH, P.E. KEVIN RAY KENDRICK PE. DAVID F. McCUL~.AH R PL.S
Pres.aent Vice P-es.cle,~t Prqec Manager · Associa:e Sa.'vey Manager · Assoc,ate