Loading...
Wynnpage-CS 920313March 13, 1992 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 ~~ Coppell, Texas 75019 Re: ~W~ynnpage ~~ -Cop~ 1~' Texas 90051-0 Dear Ken: It appears that all required work within public Right-of-Way will be completely constructed by the end of this week. Please schedule a final construction walk through with your staff and other City Departments at your earliest convenience. As you are aware, we are trying to get Wynnpage Drive accepted in order that model homes can begin. We would like to break the acceptance of this addition into two phases. The first being those lots either side of Wynnpage Drive, and the second acceptance would be for the entire subdivision. The final walk through of the entire subdivision should be scheduled one week after the initial walk through of the Wynnpage Drive acceptance. If you have any questions, please feel free to call. Sincerely, Kevin R. Kendrick, P.E. Project Manager, Associate KRK/Dp xc: Larry Davis / City of Coppell, Engineering Department Steve Gorum / City of Coppell, Utility Department Floyd Key / Legend Construction Bill Black / L.H. Lacy Company Greg Rich / Siepiela Interests, Inc. Waymon Levell / JWL Investments Ray Gonzales / city of Coppell, Department of Finance PAUL $ U,",Z;CKER. PE DAV'D M. SCH?~UF~BUSCH, P.E. KEVIN RAY KENDRICK PE. DAVID F. McCUL~.AH R PL.S Pres.aent Vice P-es.cle,~t Prqec Manager · Associa:e Sa.'vey Manager · Assoc,ate