Loading...
Wynnpage-CS 911231P. O1 DECEMBER 31,1991 MR. LARRY DAVIS CITY OF COFPELL PO.BOX 478 COPPELL, TEXAS 75019 RE; WYNNPAGE ESTATES LHL # 435 DEAR; LARRY ENCLOSED HEREWIDTH IS A LIME/CEMENT SERIES FROM MAXIM LAB. FOR THE ABOVE REFRENCED PROJECT IN THE CITY OF COPPELL, WITH THEIR RECOMENDATION, IF YOU HAVE ANY COMENTS OR QUESTION$ CALL ME, THANK YOU IN ADVANCE FOR YOUR IMMEDIATE ATTENTION IN THIS REGARD. RESPECTFULLY, L, H, LACY CO, PROJECT MANAGER L. H. Lacy Company General Contractors 214/357-0146 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 Mr. Bill Jones L. H. Lacy Company December 30, 1991 Revised December 3X, XgOX Page 3 Re= Lime/Cement Stabili=ation Test Results Wynn Page Berates It is our understandingtha~ cement stabilization will be utilized at this site within the upper six (6) inches of pavement subgrade. Therefore, it is rooomm~..ended that three (3) percent cement (approximate%y.15 pounds per square yard) be used ~o e~abilize the subgrade soils We trust the information submitted herein is sufficiently detailed for your use. Please contao~ us if we may be of further Sincerely, MAXIM ENGINEERS, INC. Robert E. Dose; P.E. Manager Geotechnioal % ,,$.q. Engineering Division \sks