Loading...
Wynnpage-CS 911126 t By.-"Engin~efing By: Engineering November 26, 1991 ' Mr. Russell Graeber T~tT ~P~ L.H. Lacy Company P.O. Box 541297 Dallas, Texas 75354-1297 Re: Wynnpage Estates Coppell, Texas 90051-0 Dear Russell: I have been informed by Floyd Key, President of Legend Construction Company, Inc. the Utility Contractor within the referenced addition that all utilities have been completed per plans prepared by this office. Our survey crews are onsite today verifying that all street grades have been re-established (plus or minus 0.2 feet to design grades). Please accept this letter. as your notification to begin construction of all paving improvements associated with this project. Per your contract agreement, you have 35 working days to complete this work beginning Wednesday, November 27, 1991. Once you have completed the initial paving within: Wynnpage, please provide us with a written notice so that theiUtility Contractor can be notified to return back to the site and complete all inlets, water meters, manhole adjustments or other work he needs to do for City acceptance. If you have any questions, 'please feel free to call. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bp xc: Mr. Waymon Levell / JWL Investments Mr. Larry Davis / city of Coppell, Inspection Dept. y/ Ms. Shohre Daneshmand / City of Coppell, Engineering Dept. Mr. Jim Siepiela / Siepiela Interests, Inc. Mr. David Chaney / Legend Construction Company, Inc. ~'-" ~'~"¥i"%5 :~%~ ~L= 'E ;~ "b%~-~E~ :~.! a~ ~c~ -~-~- .':.~.-!..: - .:, _.- ,.-:..~:~o