Loading...
Waterside P2-CS 920914 COPPELL PUBLIC WORKS MEMORANDUM DATE: September 14, 1992 /~ TO: Larry Davis, Construction Inspector FROM: Howard Pafford, Water Superintendent RE: Punch List Items for Water Side Estates Phase II-A As per our discussion I am sending this memorandum to your office in order to note punch list items on the above referenced project that have not been corrected. The following items remain deficient: 1) The valves located in the brick pavers at the intersection of Waterside and MacArthur need to be set. The pavers will have to be installed before acceptance. Please ensure these items are corrected and maintenance bonds and asbuilts are sent to Public Works prior to acceptance of this project. HLP/sm