Northpoint Addn-CS190212Design Development Consultants, Inc.
• 400 Chisholm Place. Suite 410, Plano, TX 75075.
Ph: 214-868-9320. Fax: 1-866-531-8263. Email: abed.ddc@gmail.com
abed@ddc-engineeri_ng.com
February 12, 2019
Kumar Gali, PE.
Assistant director of Engineering
City of Coppell
Mr. Gali,
We propose revisions to the pavement design as we decided to go with 1(One) inch extra thickness of Fire Lane
pavement in lieu of Lime stabilization which is also mentioned in Geotech Report as an alternate solution.
General Contractor found lime stabilization is rather challenging when working around installed Storm Pipes
without any damage by the equipment.
Sincerely,
S.I. Abed. PE. CFM.
DDC, Inc.
214-868-9320
abed.ddc@gmail.com
abed@ddc-engineering.co
05 T
*w'
e c7�•1j 9,x.'3 s•,e••0
...••°°°•� ' psi