Loading...
Rolling Oaks MC Ph 2-SY190213FEB 13, 2019 PREPARED BY: TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-10008000 PK NO. 2052-18.449 7557 RAMBLER ROAD SUITE 1400 DALLAS, TX 75231-2388 ROLLING OAKS MEMORIAL CENTER EXPANSION DRAINAGE STUDY COTTONWOOD BRANCH TRIBUTARY CITY OF COPPELL, DALLAS COUNTY, TEXAS Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 i EXECUTIVE SUMMARY MKEC Engineering, Inc has retained the services of Pacheco Koch to provide a drainage analysis of a tributary to Cottonwood Branch associated with Rolling Oaks Memorial Center expansion. The project is located adjacent to Ruby Road in the north portion of the City of Coppell. The purpose of this study is to: · Determine pre- and post-project conditions hydrology (100-year); · Compare pre- and post-project hydrologic conditions (peak discharges); · Identify post-project detention requirements (outfall configuration); The tributary to Cottonwood Branch studied in this analysis is not mapped by FEMA. The proposed improvement is an expansion to the existing Memorial Center at the intersection of Freeport Parkway and Ruby Road. The expansion improvements include general site grading, continuation and completion of the loop road, new cemetery plots, and a proposed pond. The proposed pond is located in the southeast corner of the property and includes a 15-foot outfall and a 50-foot emergency spillway. The 100-year peak discharges were determined for pre-project and post-project conditions at three (3) comparison points throughout the watershed. The hydrologic model shows that the proposed development will not cause peak discharges at the comparison points to increase. Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 ii CONTACT INFORMATION Description Name Company Email Client Contact Bryce Barkus MKEC Engineering, Inc bbarkus@mkec.com Drainage Supervisor Ryan P. Mortensen, PE, CFM Pacheco Koch rmortensen@pkce.com Drainage Project Manager Christopher Cervenka, PE, CFM Pacheco Koch ccervenka@pkce.com Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 iii TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................ i CONTACT INFORMATION .......................................................................................................... ii TABLE OF CONTENTS ................................................................................................................. iii LIST OF FIGURES & TABLES ......................................................................................................... iv LIST OF APPENDICES ................................................................................................................. v 1.0 INTRODUCTION ................................................................................................................ 1 1.1 Authorization ............................................................................................................... 1 1.2 Purpose ........................................................................................................................ 1 1.3 Background ................................................................................................................. 1 1.4 Project Location.......................................................................................................... 1 1.5 Site Assessment ........................................................................................................... 2 1.6 Proposed Improvements ........................................................................................... 2 2.0 HYDROLOGY .................................................................................................................... 3 2.1 Methodology .............................................................................................................. 3 2.2 Synthetic Storm ........................................................................................................... 3 2.3 Loss Rate ...................................................................................................................... 3 2.4 Lag Time ....................................................................................................................... 4 2.5 Drainage Area ............................................................................................................ 4 2.6 Unit Hydrographs and Routing ................................................................................. 5 2.7 Detention ..................................................................................................................... 5 3.0 RESULTS ............................................................................................................................. 6 3.1 Hydrologic Results ....................................................................................................... 6 4.0 CONCLUSION................................................................................................................... 9 5.0 DEFINITIONS & ACRONYMS ........................................................................................... 10 6.0 REFERENCES ................................................................................................................... 11 Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 iv LIST OF FIGURES & TABLES Figure 1: Location Map ................................................................................................................ 2 Figure 2: Drainage Area .............................................................................................................. 4 Figure 3: Hydrologic Comparison Points .................................................................................... 6 Figure 4: Hydrograph Comparison Point A ............................................................................... 7 Figure 5: Hydrograph Comparison Point B ................................................................................ 8 Table 1: Point Rainfall Depths ...................................................................................................... 3 Table 2: Proposed Detention Pond Stage-Storage Table ....................................................... 5 Table 3: 100-Year Peak Discharge Comparison ....................................................................... 7 Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 v LIST OF APPENDICES APPENDIX A – SUPPORTING DOCUMENTS FIRM Map No. 48113C0135K Site Plan APPENDIX B – HYDROLOGIC ANALYSIS Drainage Area Map Soils Map Pre-Project Impervious Area Map Post-Project Impervious Area Map Lag Time Calculations Impervious Percentage Calculations Curve Number Calculations Hydrologic Parameters Report HMS Model Output Detention Pond Curve APPENDIX C – DIGITAL DATA HEC-HMS Model GIS Supporting Data Digital Copy of Report Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 1 1.0 INTRODUCTION 1.1 Authorization MKEC has retained the services of Pacheco Koch to provide a drainage analysis of a tributary to Cottonwood Branch associated with Rolling Oaks Memorial Center expansion. The project is located adjacent to Ruby Road in the north portion of the City of Coppell. This report documents the procedures and findings of the drainage analysis. Technical supporting documentation is provided in accompanying appendices. 1.2 Purpose This study is intended to evaluate proposed site improvements based on the Local, State and Federal permitting requirements related to drainage. The study objectives are outlined below: · Determine pre- and post-project conditions hydrology (100-year); · Comparison of pre- and post-project hydrologic conditions (peak discharges); · Identify proposed detention requirements (outfall configuration); The proposed drainage improvements in this report are for review purposes only and will be incorporated into separate construction documents. 1.3 Background The floodplain of the tributary Cottonwood Branch is defined by the Flood Insurance Study (FIS1) for Dallas County and the effective Flood Insurance Rate Map (FIRM) Number 48113C0135K, dated, July 7, 2014. The FIRM indicates the tributary to Cottonwood Branch has no floodplain designation. A copy of the effective FIRM is provided in Appendix A. As-built plans for the road and the existing upstream detention pond were used to help model the off-site flows coming to the project site. Environmental permitting was not included in this drainage study. Environmental Permitting for this project will be handled by Terracon, a subconsultant of MKEC. 1.4 Project Location The project is located northeast of the intersection of Freeport Parkway and Ruby Road along a tributary to Cottonwood Branch in the City of Coppell. The stream flows from South to North on the east edge of the site. Figure 1 shows the location of the site. 1 FIS: https://msc.fema.gov/portal/home Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 2 Figure 1: Location Map 1.5 Site Assessment The entire watershed is located within the City of Coppell. The pre-project land use within the watershed consists of parks, industrial and single-family residential areas based on the aerial imagery from ArcGIS Online. 1.6 Proposed Improvements The proposed improvements are an expansion to the existing Memorial Center. The expansion improvements include general site grading, continuation and completion of the loop road, new cemetery plots, and a proposed pond. The proposed pond is located in the southeast corner of the property and includes a 15-foot outfall and a 50-foot emergency spillway. A map showing the general site plan for the expansion is provided in Appendix A. Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 3 2.0 HYDROLOGY 2.1 Methodology Floodplain hydrology was analyzed in this study using the computer program HEC-HMS2, Hydrologic Modeling System, developed by the Hydrologic Engineering Center of the US Army Corps of Engineers (USACE) (Version 4.2.1, March 2017). A hydrologic model was developed to determine peak discharges for the 100-year pre- and post-project watershed conditions. The techniques employed and resulting predictions of the computed peak discharges are explained in the subsequent sections. 2.2 Synthetic Storm The hydrologic model is based on a 24-hour duration storm which uses the USDA-NRCS, formerly the Soil Conservation Service (SCS), Type III rainfall distribution. Point rainfall depth of 9.6 inches was determined for the 100-year recurrence interval storm event. The 2- and 5-year storm events were also analyzed to size the detention outfall structures. The point rainfall depth was obtained from the US Department of Commerce Weather Bureau, Technical Paper No. 40 (TP-403), Rainfall Frequency Atlas of the United States. Storm Frequency Depth (inches) 2-Year 4 5-Year 5.4 100-Year 9.6 Table 1: Point Rainfall Depths 2.3 Loss Rate Loss rates and initial abstractions were determined from the Curve Number method outlined in US Department of Agriculture, Technical Release No. 55 (TR-554), Urban Hydrology for Small Watersheds. Composite Curve Numbers for each sub-basin were computed using hydrologic soil types and the impervious areas were identified and traced on the 2018 aerial photos. The impervious percentage for the post-project conditions includes the future buildings and pond associated with future phases of the expansion. The entire study area consists of hydrologic soil type B and D. Hydrologic soil types were determined from the USDA-NRCS Soil Survey Division’s 2009 Soil Map for Dallas County, Texas. Curve Number schematics, showing impervious areas and hydrologic soil types along with Curve Number computations are provided in Appendix B. 2 USACE: http://www.hec.usace.army.mil/software/hec-hms/ 3 TP-40: http://www.nws.noaa.gov/oh/hdsc/PF_documents/TechnicalPaper_No40.pdf 4 TR-55: https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 4 2.4 Lag Time Times of concentration were determined for each sub-basin from the method outlined in Chapter 3 of TR-55. Overland flow distances were limited to 50-feet. The shallow concentrated flow components use a K-factor of 16.1 and 20.3 for paved and unpaved conditions. Basin lag times were developed by multiplying the time of concentration by 0.6. Flow paths used in the Lag Time calculations for each sub-basin are shown on the Drainage Area Map. Lag Time calculations are provided in Appendix B. 2.5 Drainage Area The drainage area divides for the watershed were delineated based on aerial LIDAR data and previous drainage plans. A field investigation was also conducted throughout the watershed to visually verify drainage divides. The watershed was divided into 4 sub- basins. Sub-basins are designated DA_A through DA_D. The total watershed drainage area is 93.54 acres (0.15 square-miles) at the Tributary’s confluence with Cottonwood Branch. Drainage sub-basin DA_D drains to an existing detention pond at the southeast corner of Freeport Parkway and Ruby Road. The existing detention pond exits through a storm pipe under Ruby Road that outfalls just South of the proposed detention pond. Figure 3 shows the sub-basin delineation. A Drainage Area Map with contours is provided in Appendix B. Figure 2: Drainage Area Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 5 2.6 Unit Hydrographs and Routing The Soil Conservation Service Dimensionless Unit Hydrograph Method was used to produce a synthetic hydrograph for the given 24-hour storms. The hydrograph parameters used for each sub-basin were based on the sub-basin Lag Time and the composite Curve Numbers (discussed above). Hydrographs from each sub-basin were routed to combination points using the Muskingum-Cunge Routing Method with approximated trapezoidal sections based on 1-foot aerial contours. 2.7 Detention Detention is proposed to reduce post-project peak discharges to or below pre-project release rates. The proposed detention pond was modeled using the Level Pool Routing Method to determine attenuation effects related to storage within the pond. The proposed pond has 1.43 ac-ft of storage above the normal pool. Detailed stage-storage- discharge curves are provided in Appendix B. Table 2 shown below is an elevation-area table for the proposed detention pond above the normal pool elevation. As indicated in the table below, the walls surrounding the pond are vertical above the normal pool elevation. Elevation Area (ac) 505.50 0.634495 506.0 0.634495 506.50 0.634495 507.0 0.634495 507.75 0.634495 Table 2: Proposed Detention Pond Stage-Storage Table Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 6 3.0 RESULTS 3.1 Hydrologic Results HEC-HMS was used to compute the 100-year peak discharges for the pre-project and post-project site conditions. The pre- and post-project 100-year peak discharge was compared at 3 combination points throughout the watershed. Figure 3 shows the location of each comparison point. Figure 3: Hydrologic Comparison Points N.T.S.I Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 7 The hydrologic model shows the proposed detention area will reduce peak discharges at Comparison Points A and B. Comparison Point A is located at the Tributary’s confluence with Cottonwood Branch. Table 3 below shows the comparison of the 100- year peak discharges and the computed difference at each location. A negative number indicates a decrease from pre-project to post-project conditions. Comparison Point 100-year Peak Discharge (cfs) Pre-Project Post-Project Difference A 220 220 0 B 407 397 -10 C 536 525 -11 Table 3: 100-Year Peak Discharge Comparison The hydrologic model shows the post-project development will decrease the 100-year peak discharges at the comparison points downstream of the site. Figures 5 and 6 are overlays of the pre-project and post-project hydrographs at comparison points A and B. Figure 4: Hydrograph Comparison Point A DISCHARGE (CFS)TIME (HOURS) JUNCTION A PRE-PROJECT POST-PROJECT Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 8 Figure 5: Hydrograph Comparison Point B DISCHARGE (CFS)TIME (HOURS) JUNCTION B PRE-PROJECT POST-PROJECT Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 9 4.0 CONCLUSION This study determines hydrologic impacts of Rolling Oaks Memorial Center Expansion on a tributary to Cottonwood Branch through a comparison of pre-project and post-project conditions. The drainage analysis in this study is based on the 100-year storm event. Comparisons include review of: · Determine pre- and post-project conditions hydrology (100-year); · Comparison of pre- and post-project hydrologic conditions (peak discharges); · Identify post-project detention requirements (outfall configuration); Results from the analysis of the Cottonwood Branch Tributary watershed shows that the post-project development will cause peak discharges from the site to decrease at comparison points A and B. There is no change in peak discharge at comparison point C which is upstream of the site. Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 10 5.0 DEFINITIONS & ACRONYMS 100-Year Flood. The flood event that has a 1-percent chance of being equaled or exceeded each year, also referred to as the 1-percent annual chance flood. AC-FT. Acre-Feet City. City of Coppell FEMA. Federal Emergency Management Agency FIRM. Flood Insurance Rate Map FIS. Flood Insurance Study FPS. Feet Per Second HEC-HMS. The Hydrologic Engineering Center – Hydrologic Modeling System is designed to simulate the precipitation-runoff processes of dendritic drainage basins. This includes large river basin water supply and flood hydrology, and small urban or natural watershed runoff. Hydrographs produced by the program are used directly or in conjunction with other software for studies of water availability, urban drainage, flow forecasting, future urbanization impact, reservoir spillway design, flood damage reduction, floodplain regulation , and systems operation. Jurisdictional Waters of the US. All waters which are currently used, or were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide. All interstate waters including interstate wetlands. All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds, the use, degradation or destruction of which could affect interstate or foreign commerce including any such waters. NAD83. 1983 North American Datum NAVD88. 1988 North American Vertical Datum Rolling Oaks Memorial Center City of Coppell, TX February 13, 2019 11 6.0 REFERENCES Department of Agriculture. Natural Resources Conservation Service. Technical Release 55, Urban Hydrology for Small Watersheds. Washington, DC: GPO, 1986. United States Army Corps of Engineers. Hydrologic Engineering Center: HEC-HMS Hydrologic Modeling System, Version 4.2.1 (computer software), March 2017. United States Army Corps of Engineers. Hydrologic Engineering Center: HEC-HMS Hydrologic Modeling System User’s Manual, Version 4.2 Washington, DC: GPO, August 2016. United States Army Corps of Engineers. Hydrologic Engineering Center: HEC-HMS Hydrologic Modeling System Technical Reference Manual. Washington, DC: GPO, March 2000. United States Army Corps of Engineers. Hydrologic Engineering Center: HEC-HMS Hydrologic Modeling System Applications Guide. Washington, DC: GPO, March 2015. United States. Department of Commerce. Weather Bureau. Technical Paper No. 40, Rainfall Frequency Atlas of the United States. Washington, DC: GPO, 1961. United States. Federal Emergency Management Agency. Flood Insurance Rate Map, No. 48113C0135K, Dallas County, Texas and Incorporated Areas. Washington, DC: GPO, July 7, 2014. United States. Federal Emergency Management Agency. Flood Insurance Study, Dallas County, Texas and Incorporated Areas. Washington, DC: GPO, July 7, 2014. Appendix A Supporting Documents •FIRM Map No. 48113C0135K •Site Plan FIRM Map No. 48113C0135K Site Plan SITE PLAN ROLLING OAKS MEMORIAL CENTER N.T.S.VICINITY MAP I 0 200100Feet 1 inch = 200 feet ° MAP 1 OF 1February 14, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\SITE PLAN.mxdRUBY ROAD CREEKVIEW DR FREEPORT PKWYKEY TO FEATURES PROPERTY BOUNDARY SITE PLAN Appendix B Hydrologic Analysis •Drainage Area Maps •Soils Map •Pre-Project Impervious Area Map •Post-Project Impervious Area Map •Lag Time Calculations •Impervious Percentage Calculations •Curve Number Calculations •Hydrologic Parameters Report •HEC-HMS Model Output •Detention Pond Curve Drainage Area Maps !=DA_B 32.7 !=DA_A 22.37 !=DA _D 26.49 !=D A_C 11.98 505 490 485 510505500 480 49549050549549051551 0 505 5004 9 5 500495485520 4 9 5 530520510520 51551 0 5 0 5 5 0 0 4 9 0 5105055 1 5 5 1 0505495525520 525 520 520 515 520 515520515 5 2 0 515515 5 1 0 510500495 515490510495 495510505495 520525 5205155155205 2 0520 5 2 0 520 5205 1 0 510510 5 1 0 5155155 1 5515515515 515510 5155 0 5 505500 5004955 0 0 495 485 4 8 5490 4 8 0 48 04 8 0 4754755 2 0 520 520520 5 1 5 5 1 5 515 515 5 1 5 515 515 5 1 5 5 1 5 5 1 5 515 51 5 515 515 5 1 0 PRE-PROJECTDRAINAGE AREA MAP ROLLING OAKS MEMORIAL CENTER N.T.S. VICINITY MAP I 0 400200 Feet 1 inch = 400 feet ° MAP 1 OF 1February 13, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\SITE PLAN.mxdFLOW PATHS OVERLAND SHALLOW GUTTER PIPE BOX CHANNEL RUBY ROAD FREEPORT PKWY S COPPELL RDCREEKVIEW DR FREEPORT PKWYKEY TO FEATURES DRAINAGE AREA SURFACE CONTOURS MAJOR MINOR !=DA _B 32.7 !=DA _A 22.37 !=DA_D 26.49 !=DA _C 11.98 5 1 5 5 1 0505 515490490 485 500 480 520 495 5 1 0500515510 5004 8 5 505500495520 4954954 9 0 530520510520 51551 0 5 0 5 5 0 0 4 9 0 5 1 5 5 1 0510505525520 525 520 520 515 520 515520515 5 2 0 5 1 5 5 1 5 5 1 0 5 1 0 5 0 5 495 520 5104 9 5 495510500495 485 485520525 5205155155205 2 0520 5 2 0 520520510 5 1 0 515515515515 5155 1 5 515 515515510 5155155 0 5 500 5004955 0 0 495 485490 4904 8 0 4 8 0 480 4755 2 0 520 520520 5 1 5 5 1 5 515 5 1 5 515 5 1 5 5 1 5 515 5 15 515 515 5 1 0 POST-PROJECTDRAINAGE AREA MAP ROLLING OAKS MEMORIAL CENTER N.T.S. VICINITY MAP I 0 400200 Feet 1 inch = 400 feet ° MAP 1 OF 1February 12, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\PROPOSED DA.mxdFLOW PATHS OVERLAND SHALLOW GUTTER PIPE BOX CHANNEL RUBY ROAD FREEPORT PKWY S COPPELL RDCREEKVIEW DR FREEPORT PKWYKEY TO FEATURES DRAINAGE AREA SURFACE CONTOURS MAJOR MINOR Soils Map !=DA _B 32.7 !=DA _A 22.37 !=DA_D 26.49 !=DA _C 11.98 SOILS MAP ROLLING OAKS MEMORIAL CENTER N.T.S. VICINITY MAP I 0 400200 Feet 1 inch = 400 feet ° MAP 1 OF 1February 12, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\SOILS.mxdKEY TO FEATURES DRAINAGE AREA HYDROLOGIC GROUP B D FREEPORT PKWY S COPPELL RDCREEKVIEW DR FREEPORT PKWY Pre-Project Impervious Area Map !=DA _B 32.7 !=DA _A 22.37 !=DA_D 26.49 !=DA _C 11.98 PRE-PROJECTIMPERVIOUS AREA MAP ROLLING OAKS MEMORIAL CENTER N.T.S. VICINITY MAP I 0 400200 Feet 1 inch = 400 feet ° MAP 1 OF 1February 13, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\IMPERVIUOS AREA.mxdKEY TO FEATURES DRAINAGE AREA LANDUSE IMPERVIOUS OPEN SPACE (FAIR CONDITION) RUBY ROAD FREEPORT PKWY S COPPELL RDCREEKVIEW DR FREEPORT PKWY Post-Project Impervious Area Map !=DA_B 32.7 !=DA _A 22.37 !=DA _D 26.49 !=D A_C 11.98 POST-PROJECT IMPERVIOUS AREA MAP ROLLING OAKS MEMORIAL CENTER N.T.S. VICINITY MAP I 0 400200 Feet 1 inch = 400 feet ° MAP 1 OF 1February 12, 2019 CITY OF COPPELL, TEXAS TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00DATUM NAD 1983 Texas State Plane North Central Zone FIPS 4202 Path: M:\DWG-20\2052-18.449\Design\GIS\Maps\PROPOSED IMPERVIOUS AREA MAP.mxdKEY TO FEATURES DRAINAGE AREA LANDUSE OPEN SPACE IMPERVIOUS* RUBY ROAD FREEPORT PKWY S COPPELL RDCREEKVIEW DR FREEPORT PKWY*FUTURE EXPANSION PHASES INCLUDED IN POST-PROJECT IMPERVIOUS AREAS Lag Time Calculations PRE-PROJECT TIME OF CONCENTRATION REPORT EQUATIONS: P-2YR = 4.0 INCH MNIMUM SLOPE USED - 0.5% DA_A FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 3.48 0.1 9.020.000.410 GUTTER G-10 545 2.81 3.9 2.3223.370.018 PIPE 24" RCP 829 3.12 11.8 1.1766.870.014 CHANNEL NATRL TRAP (B=4,Y=3,SS=3:1)503 1.38 5.0 1.6942.290.050 1,927 14.19 Lag (min):8.52 DA_B FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 1.20 0.1 13.800.000.410 SHALLOW UNPAVED 414 2.47 2.5 2.7316.100.000 CHANNEL NATRL TRAP (B=4,Y=3,SS=3:1)801 2.36 6.5 2.0542.290.050 1,265 18.58 Lag (min):11.15 DA_C FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 2.30 0.1 10.640.000.410 SHALLOW UNPAVED 112 1.90 2.2 0.8416.100.000 PIPE 18" RCP 393 0.50 3.9 1.6855.200.014 PIPE 30" RCP 411 0.50 5.5 1.2577.590.014 PIPE 36" RCP 234 0.50 6.2 0.6387.620.014 1,201 15.04 Lag (min):9.03 Page 1 of 2 DA_D FLOW TYPE LENGTH ROUGHNESSSLOPE (%) K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 2.30 0.1 10.640.000.410 SHALLOW UNPAVED 72 3.98 3.2 0.3716.100.000 PIPE 24" RCP 544 0.50 4.7 1.9266.870.014 666 12.93 Lag (min):7.76 Page 2 of 2 POST-PROJECT TIME OF CONCENTRATION REPORT EQUATIONS: P-2YR = 4.0 INCH MNIMUM SLOPE USED - 0.5% DA_A FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 3.48 0.1 9.020.000.410 GUTTER G-10 545 2.81 3.9 2.3223.370.018 PIPE 24" RCP 829 3.12 11.8 1.1766.870.014 CHANNEL NATRL TRAP (B=4,Y=3,SS=3:1)503 1.38 5.0 1.6942.290.050 1,927 14.19 Lag (min):8.52 DA_B FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 1.20 0.1 13.800.000.410 SHALLOW UNPAVED 14 2.47 2.5 0.0916.100.000 GUTTER G-12 18 0.50 1.7 0.1823.640.018 PIPE 24" RCP 367 3.96 13.3 0.4666.870.014 CHANNEL NATRL TRAP (B=4,Y=3,SS=3:1)726 2.36 6.5 1.8642.290.050 1,175 16.40 Lag (min):9.84 DA_C FLOW TYPE LENGTH ROUGHNESSSLOPE (%)K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 2.30 0.1 10.640.000.410 SHALLOW UNPAVED 112 1.90 2.2 0.8416.100.000 PIPE 18" RCP 393 0.50 3.9 1.6855.200.014 PIPE 30" RCP 411 0.50 5.5 1.2577.590.014 PIPE 36" RCP 234 0.50 6.2 0.6387.620.014 1,201 15.04 Lag (min):9.03 Page 1 of 2 DA_D FLOW TYPE LENGTH ROUGHNESSSLOPE (%) K VALUE VELOCITY (fps) Tc (min)SURFACE OVERLAND GRS-BERM 50 2.30 0.1 10.640.000.410 SHALLOW UNPAVED 72 3.98 3.2 0.3716.100.000 PIPE 24" RCP 544 0.50 4.7 1.9266.870.014 666 12.93 Lag (min):7.76 Page 2 of 2 K VALUE LOOK UP TABLE EQUATIONS: SHALLOW SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) PAVED UNDEFINED SHALLOW PAVED FLOW 0.000 20.3 UNPAVED UNDEFINED SHALLOW UNPAVED FLOW 0.000 16.1 PIPE SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) 15" RCP 15 INCH REINFORCED CONCTRETE PIPE 0.014 1.2 3.9 0.3 48.9 18" RCP 18 INCH REINFORCED CONCTRETE PIPE 0.014 1.8 4.7 0.4 55.2 21" RCP 21 INCH REINFORCED CONCRETE PIPE 0.014 2.4 5.5 0.4 61.2 24" RCP 24 INCH REINFORCED CONCTRETE PIPE 0.014 3.1 6.3 0.5 66.9 27" RCP 27 INCH REINFORCED CONCTRETE PIPE 0.014 4.0 7.1 0.6 72.3 30" RCP 30 INCH REINFORCED CONCTRETE PIPE 0.014 4.9 7.9 0.6 77.6 33" RCP 33 INCH REINFORCED CONCRETE PIPE 0.014 5.94 5.9 0.7 82.7 36" RCP 36 INCH REINFORCED CONCTRETE PIPE 0.014 7.1 9.4 0.8 87.6 42" RCP 42 INCH REINFORCED CONCTRETE PIPE 0.014 9.6 11.0 0.9 97.1 48" RCP 48 INCH REINFORCED CONCTRETE PIPE 0.014 12.6 12.6 1.0 106.1 54" RCP 54 INCH REINFORCED CONCTRETE PIPE 0.014 15.9 14.1 1.1 114.8 60" RCP 60 INCH REINFORCED CONCTRETE PIPE 0.014 19.6 15.7 1.3 123.2 72" RCP 72 INCH REINFORCED CONCTRETE PIPE 0.014 28.3 18.8 1.5 139.1 78" RCP 78 INCH REINFORCED CONCRETE PIPE 0.014 33.2 20.4 1.6 146.7 OVERLAND SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) GRS-BERM BERMUDA GRASS 0.410 0.0 GRS-DENSE DENSE GRASS 0.240 0.0 GRS-SHORT SHORT GRASS PRAIRIE 0.150 0.0 PAVEMENT SMOOTH SURFACE (CONCRETE, ASPHALT, GRAVEL OR BARE SOIL) 0.011 0.0 RANGE NATURAL RANGE 0.130 0.0 WD-DENSE WOODS, DENSE UNDERBRUSH 0.800 0.0 WD-LIGHT WOODS, LIGHT UNDERBRUSH 0.400 0.0 Page 1 of 3 GUTTER SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) A-10 PARABOLIC ALLEY, 6" DEEP, 10' SPREAD 0.018 3.3 10.1 0.3 39.5 A-20 PARABOLIC ALLEY, 6" DEEP, 20' SPREAD 0.018 6.7 20.0 0.3 39.6 A-30 PARABOLIC ALLEY, 6" DEEP, 30' SPREAD 0.018 10.0 30.0 0.3 39.7 A-40 PARABOLIC ALLEY, 6" DEEP, 40' SPREAD 0.018 13.3 40.0 0.3 39.7 A-50 PARABOLIC ALLEY, 6" DEEP, 50' SPREAD 0.018 16.7 50.0 0.3 39.7 G-10 PARABOLIC GUTTER, 6" CURB, 10' SPREAD 0.018 0.8 5.5 0.2 23.4 G-12 PARABOLIC GUTTER, 6" CURB, 12' SPREAD 0.018 1.0 6.5 0.2 23.6 G-14 PARABOLIC GUTTER, 6" CURB, 14' SPREAD 0.018 1.2 7.5 0.2 23.8 G-16 PARABOLIC GUTTER, 6" CURB, 16' SPREAD 0.018 1.3 8.5 0.2 24.0 G-18 PARABOLIC GUTTER, 6" CURB, 18' SPREAD 0.018 1.5 9.5 0.2 24.1 G-20 PARABOLIC GUTTER, 6" CURB, 20' SPREAD 0.018 1.7 10.5 0.2 24.2 G-25 PARABOLIC GUTTER, 6" CURB, 25' SPREAD 0.018 2.1 13.0 0.2 24.3 G-30 PARABOLIC GUTTER, 6" CURB, 30' SPREAD 0.018 2.5 15.5 0.2 24.4 G-35 PARABOLIC GUTTER, 6" CURB, 35' SPREAD 0.018 2.9 18.0 0.2 24.5 G-40 PARABOLIC GUTTER, 6" CURB, 40' SPREAD 0.018 3.3 20.5 0.2 24.6 CHANNEL SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) CR-2X1 2X1 CONCRETE RECTANGULAR CHANNEL 0.018 2.0 4.0 0.5 52.0 CR-4X1 4X1 CONCRETE RECTANGULAR CHANNEL 0.018 4.0 6.0 0.7 63.0 CT-0.2.1 CONCRETE TRAPAZOIDAL CHANNEL, B=0, Y= 2, SS=1:1 0.018 4.0 5.7 0.7 65.5 CT-0.2.3 CONCRETE TRAPAZOIDAL CHANNEL, B=0, Y= 2, SS=3:1 0.018 12.0 12.6 0.9 79.7 CT-10.6.1 CONCRETE TRAPAZOIDAL CHANNEL, B=10, Y= 6, SS=1:1 0.018 96.0 27.0 3.6 192.5 CT-10.6.3 CONCRETE TRAPAZOIDAL CHANNEL, B=10, Y= 6, SS=3:1 0.018 168.0 47.9 3.5 190.4 CT-4.3.1 CONCRETE TRAPAZOIDAL CHANNEL, B=4, Y= 3, SS=1:1 0.018 21.0 12.5 1.7 116.8 CT-4.3.3 CONCRETE TRAPAZOIDAL CHANNEL, B=4, Y= 3, SS=3:1 0.018 39.0 23.0 1.7 117.5 CT-6.4.1 CONCRETE TRAPAZOIDAL CHANNEL, B=6, Y= 4, SS=1:1 0.018 40.0 17.3 2.3 144.3 CT-6.4.3 CONCRETE TRAPAZOIDAL CHANNEL, B=6, Y= 4, SS=3:1 0.018 72.0 31.3 2.3 143.9 CT-8.5.1 CONCRETE TRAPAZOIDAL CHANNEL, B=8, Y= 5, SS=1:1 0.018 65.0 22.1 2.9 169.3 CT-8.5.3 CONCRETE TRAPAZOIDAL CHANNEL, B=8, Y= 5, SS=3:1 0.018 115.0 39.6 2.9 168.0 NP-10.1 PARABOLIC SWALE, 1' DEEP, 10' SPREAD 0.035 6.7 12.7 0.5 27.7 NP-20.1 PARABOLIC SWALE, 1' DEEP, 20' SPREAD 0.035 13.3 22.7 0.6 29.8 NP-30.1 PARABOLIC SWALE, 1' DEEP, 30' SPREAD 0.035 20.0 32.7 0.6 30.6 NP-40.1 PARABOLIC SWALE, 1' DEEP, 40' SPREAD 0.035 26.7 42.7 0.6 31.0 NT-0.2.3 NATURAL TRAPAZOIDAL CHANNEL, B=0, Y= 2, SS=3:1 0.050 12.0 12.6 0.9 28.7 NT-10.6.3 NATURAL TRAPAZOIDAL CHANNEL, B=10, Y= 6, SS=3:1 0.050 168.0 47.9 3.5 68.6 NT-4.3.3 NATURAL TRAPAZOIDAL CHANNEL, B=4, Y= 3, SS=3:1 0.050 39.0 23.0 1.7 42.3 NT-6.4.3 NATURAL TRAPAZOIDAL CHANNEL, B=6, Y= 4, SS=3:1 0.050 72.0 31.3 2.3 51.8 NT-8.5.3 NATURAL TRAPAZOIDAL CHANNEL, B=8, Y= 5, SS=3:1 0.050 115.0 39.6 2.9 60.5 Page 2 of 3 BOX SURFACE DESCRIPTION K VALUEROUGHNESSHYDRAULIC RADIUS (ft) AREA (ft^2) WETTED PERIMETER (ft) 10X10 RCB 10X10 REINFORCED CONCRETE BOX 0.014 100.0 40.0 2.5 195.5 10X4 RCB 10X4 REINFORCED CONCRETE BOX 0.014 40.0 28.0 1.4 134.6 10X5 RCB 10X5 REINFORCED CONCRETE BOX 0.014 50.0 30.0 1.7 149.2 10X6 RCB 10X6 REINFORCED CONCRETE BOX 0.014 60.0 32.0 1.9 161.4 10X7 RCB 10X7 REINFORCED CONCRETE BOX 0.014 70.0 34.0 2.1 171.8 10X8 RCB 10X8 REINFORCED CONCRETE BOX 0.014 80.0 36.0 2.2 180.8 10X9 RCB 10X9 REINFORCED CONCRETE BOX 0.014 90.0 38.0 2.4 188.6 3X3 RCB 3X3 REINFORCED CONCRETE BOX 0.014 9.0 12.0 0.8 87.6 4X3 RCB 4X3 REINFORCED CONCRETE BOX 0.014 12.0 14.0 0.9 95.8 4X4 RCB 4X4 REINFORCED CONCRETE BOX 0.014 16.0 16.0 1.0 106.1 5X3 RCB 5X3 REINFORCED CONCRETE BOX 0.014 15.0 16.0 0.9 101.7 5X4 RCB 5X4 REINFORCED CONCRETE BOX 0.014 20.0 18.0 1.1 113.9 5X5 RCB 5X5 REINFORCED CONCRETE BOX 0.014 25.0 20.0 1.3 123.2 6X3 RCB 6X3 REINFORCED CONCRETE BOX 0.014 18.0 18.0 1.0 106.1 6X4 RCB 6X4 REINFORCED CONCRETE BOX 0.014 24.0 20.0 1.2 119.9 6X5 RCB 6X5 REINFORCED CONCRETE BOX 0.014 30.0 22.0 1.4 130.5 6X6 RCB 6X6 REINFORCED CONCRETE BOX 0.014 36.0 24.0 1.5 139.1 7X3 RCB 7X3 REINFORCED CONCRETE BOX 0.014 21.0 20.0 1.1 109.7 7X4 RCB 7X4 REINFORCED CONCRETE BOX 0.014 28.0 22.0 1.3 124.7 7X5 RCB 7X5 REINFORCED CONCRETE BOX 0.014 35.0 24.0 1.5 136.5 7X6 RCB 7X6 REINFORCED CONCRETE BOX 0.014 42.0 26.0 1.6 146.1 7X7 RCB 7X7 REINFORCED CONCRETE BOX 0.014 49.0 28.0 1.8 154.1 8X3 RCB 8X3 REINFORCED CONCRETE BOX 0.014 24.0 22.0 1.1 112.5 8X4 RCB 8X4 REINFORCED CONCRETE BOX 0.014 32.0 24.0 1.3 128.6 8X5 RCB 8X5 REINFORCED CONCRETE BOX 0.014 40.0 26.0 1.5 141.5 8X6 RCB 8X6 REINFORCED CONCRETE BOX 0.014 48.0 28.0 1.7 152.0 8X7 RCB 8X7 REINFORCED CONCRETE BOX 0.014 56.0 30.0 1.9 160.9 8X8 RCB 8X8 REINFORCED CONCRETE BOX 0.014 64.0 32.0 2.0 168.5 9X4 RCB 9X4 REINFORCED CONCRETE BOX 0.014 36.0 26.0 1.4 131.9 9X5 RCB 9X5 REINFORCED CONCRETE BOX 0.014 45.0 28.0 1.6 145.6 9X6 RCB 9X6 REINFORCED CONCRETE BOX 0.014 54.0 30.0 1.8 157.1 9X7 RCB 9X7 REINFORCED CONCRETE BOX 0.014 63.0 32.0 2.0 166.7 9X8 RCB 9X8 REINFORCED CONCRETE BOX 0.014 72.0 34.0 2.1 175.0 9X9 RCB 9X9 REINFORCED CONCRETE BOX 0.014 81.0 36.0 2.3 182.3 Page 3 of 3 Impervious Percentage Calculations PRE-PROJECT PERCENT IMPERVIOUS REPORT DA_A WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 403,203 41.4 OPEN SPACE (FAIR CONDITION)0.0 571,132 0.0 974,335 41.4 DA_B WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 365,667 25.7 OPEN SPACE (FAIR CONDITION)0.0 1,058,712 0.0 1,424,379 25.7 DA_C WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 413,398 79.2 OPEN SPACE (FAIR CONDITION)0.0 108,351 0.0 521,749 79.2 DA_D WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 795,594 68.9 OPEN SPACE (FAIR CONDITION)0.0 358,530 0.0 1,154,124 68.9 Page 1 of 1 POST-PROJECT PERCENT IMPERVIOUS REPORT DA_A WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 403,203 41.4 OPEN SPACE (FAIR CONDITION)0.0 571,132 0.0 974,335 41.4 DA_B WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 574,810 40.4 OPEN SPACE (FAIR CONDITION)0.0 849,569 0.0 1,424,379 40.4 DA_C WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 413,398 79.2 OPEN SPACE (FAIR CONDITION)0.0 108,351 0.0 521,749 79.2 DA_D WEIGHTED PERCENTLANDUSESHAPE AREA (ft^2)PERCENT IMPERVIOUS IMPERVIOUS 100.0 795,594 68.9 OPEN SPACE (FAIR CONDITION)0.0 358,530 0.0 1,154,124 68.9 Page 1 of 1 Curve Number Calculations PERVIOUS CURVE NUMBER REPORT DA_A SHAPE AREA AREA WEIGHTED CNCURVE NUMBERSOIL TYPE B 69 489,539 34.7 D 84 484,796 41.8 974,335 76.5 DA_B SHAPE AREA AREA WEIGHTED CNCURVE NUMBERSOIL TYPE B 69 397,780 19.3 D 84 1,026,599 60.5 1,424,379 79.8 DA_C SHAPE AREA AREA WEIGHTED CNCURVE NUMBERSOIL TYPE D 84 521,749 84.0 521,749 84.0 DA_D SHAPE AREA AREA WEIGHTED CNCURVE NUMBERSOIL TYPE D 84 1,154,124 84.0 1,154,124 84.0 Page 1 of 1 Hydrologic Parameters Report PRE-PROJECT HYDROLOGIC PARAMETERS REPORT 22.4 14.2 76.5 41.4DA_A 8.5 32.7 18.6 79.8 25.7DA_B 11.1 12.0 15.0 84.0 79.2DA_C 9.0 26.5 12.9 84.0 68.9DA_D 7.8 BASIN AREA (acres) Tc (minutes)PERCENT IMPERVIOUSPERVIOUS CNBASIN ID Lag (minutes) Page 1 of 1 POST-PROJECT HYDROLOGIC PARAMETERS REPORT 22.4 14.2 76.5 41.4DA_A 8.5 32.7 16.4 79.8 40.4DA_B 9.8 12.0 15.0 84.0 79.2DA_C 9.0 26.5 12.9 84.0 68.9DA_D 7.8 BASIN AREA (acres) Tc (minutes)PERCENT IMPERVIOUSPERVIOUS CNBASIN ID Lag (minutes) Page 1 of 1 HEC-HMS Model Output Project: ROLLING OAKS MEMORIALSimulation Run: EXISTING 100-YRStart of Run: 16Jan2019, 12:00 Basin Model: EXISTINGEnd of Run: 17Jan2019, 12:02 Meteorologic Model: 100-YRCompute Time:13Feb2019, 17:16:22 Control Specifications:Control 1HydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(IN)DA-A0.034950144.517Jan2019, 00:107.89DA-B0.051093194.817Jan2019, 00:127.74DA-C0.01871583.717Jan2019, 00:109.18DA-D0.041399189.817Jan2019, 00:088.98EXISTING POND0.041399142.817Jan2019, 00:168.43Junction-A0.146157535.117Jan2019, 00:148.15Junction-B0.111207406.517Jan2019, 00:148.23Junction-C0.060114219.717Jan2019, 00:148.66Reach-10.01871581.917Jan2019, 00:129.17Reach-20.060114219.417Jan2019, 00:168.66Reach-30.111207404.617Jan2019, 00:148.23 Project: ROLLING OAKS MEMORIALSimulation Run: PROPOSED 100-YRStart of Run: 16Jan2019, 12:00 Basin Model: PROPOSEDEnd of Run: 17Jan2019, 12:02 Meteorologic Model: 100-YRCompute Time:13Feb2019, 17:20:58 Control Specifications:Control 1HydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(IN)DA-A0.034950144.517Jan2019, 00:107.89DA-B0.051093206.917Jan2019, 00:128.10DA-C0.01871583.717Jan2019, 00:109.18DA-D0.041399189.817Jan2019, 00:088.98EXISTING POND0.041399142.817Jan2019, 00:168.43Junction-A0.146157524.317Jan2019, 00:148.26Junction-B0.111207397.017Jan2019, 00:168.37Junction-C0.060114219.717Jan2019, 00:148.66PROP POND0.060114217.317Jan2019, 00:168.61Reach-10.01871581.917Jan2019, 00:129.17Reach-20.060114216.617Jan2019, 00:188.60Reach-30.111207396.817Jan2019, 00:168.37 Detention Pond Curve Storage (AC-FT)0.00.20.40.60.81.01.21.4Elev (ft)505.40505.71506.03506.34506.66506.97507.29507.6012:00 15:00 18:00 21:00 00:00 03:00 06:00 09:00 12:0016Jan201917Jan2019Flow (cfs)050100150200Reservoir "PROP POND" Results for Run "PROPOSED 100-YR"Run:PROPOSED 100-YR Element:PROP POND Result:StorageRun:PROPOSED 100-YR Element:PROP POND Result:Pool ElevationRun:PROPOSED 100-YR Element:PROP POND Result:OutflowRun:PROPOSED 100-YR Element:PROP POND Result:Combined Inflow100-YEAR WSEL: 507.5 Appendix C Digital Data • HEC-HMS Model • GIS Supporting Data • Digital Copy of Report