Loading...
Wynnpage-CS 910927 unzicker * sch. nurbusch · associates civil engineers · surveyors ° planners 8z'oo sternmons freeway, suite ~.oo dallas, texas ~24t September 27, 1991 (214) 654-55oo Mr. Gary Hendrix, P.E. City of Coppell Engineering Department P.O. Box 478 Coppell, Texas 75019 Re: Wynnpage Coppell, Texas 90051-0 Dear Mr. Hendrix: We have reviewed the Final Plat and Engineering Plans for the referenced addition consistent with the comments found on the returned set of markups from your second review. These plans have also been revised according to our telephone conversation during the week of September 2nd. I apologize for not having these plans returned to you earlier, but I have been ill and out of the office for the past two weeks. I would appreciate it very much if you would schedule a preconstruction meeting at your earliest convenience (October 4th) as the excavation contractor is nearly finished with the rough grade work within this subdivision. Please find below an itemized listing of all changes to each exhibit found in the set of development plans. They are as follows: COVER SHEET 1. This sheet, as well as all sheets within this plan set, have been sealed by a Registered Engineer in the State of Texas. WATER PLAN 1. The detail of the blow off valve has been revised to show an eight inch water main. 2. An eight inch tee and a second eight inch valve have been called out for the water line located at the intersection of Tealwood Drive and Hearthwood Drive. SEWER PLAN 1. A detail of a drop manhole has been added to this set of Engineering Plans. Please see sheet 20 for this detail which was taken from the Dallas Water Utilities Design Standards. 2. The two existing manholes along the West line of this tract are to be adjusted to grade. These existing manholes are located in the proposed alley Right-of-Way. PAUL S. UNZICKER, P.E. DAVID M. SCNNURBUSCH. P.E. PRESIDENT VICE-PRESIDENT Mr. Gary Hendrix, P.E. September 27, 1991 Page Two 3. Sanitary sewer line "S-4" located in Hearthwood Drive has been extended beyond the back of curb. 4. All sewer services are shown to be connected directly to the sewer mains and not any manhole. 5. The line shown in the detail at the East property line of this tract near Wynnpage Drive is the actual property line of this tract. SANITARY SEWER PROFILES 1. The type of embedment has been identified per your request and a detail of the embedment shown on Sheet 20 of this plan set. 2. As mentioned earlier, a detail of a drop manhole can be found on Sheet 20. DRAINAGE AREA MAP 1. The Hydrology Summary table has been revised. The actual 100 year discharges were correctly shown in the graphic portion of this exhibit. 2. The offsite discharge from the North side of this tract has been revised accordingly. 3. The positive overflow swale calculations have been revised accordingly. Please see markups for additional information. 4. The total discharge into the two most Northerly inlets in Tealwood Drive is correct as shown. Your review did not include subdrainage area "A-2". 5. An additional detail has been shown for the storm sewer outfall. There are now two details of this area. 6. An offsite drainage easement is being obtained from Mr. Ardinger's property located along the North side of this development. Greg Rich with Siepiela Interests, Inc. (the developer of this tract) is in the process of obtaining this easement. STORM SEWER PLAN/PROFILE (LINES "D-i" & "D-I.I"~ 1. A cross section exhibit has been included with this submittal. This exhibit has not been added to the plan set but is submitted for your files as requested. 2. As discussed in our telephone conversation, the starting hydraulic grade line at the downstream end of Line "D-i" has been left as shown. Please see our first review letter for additional information regarding this issue. Mr. Gary Hendrix, P.E. September 27, 1991 Page Three 3. To help the upstream end of Line "D-2", we have lowered grades on this line to provide additional cover over Line "D-2". 4. Block sodding of the channel side slopes will be the only option for erosion control as reguested. Hydromulching will not be allowed. 5. An additional note has been added regarding the construction of curb inlets. 6. Spot shots have been provided along the top/toe of curbs of the proposed channel section. 7. As discussed by telephone, a junction box is not needed at the inlet laterals. 8. The most upstream end of Line "D-i" will end at the property line and an easement is not needed. The developer of this tract also owns the commercial tract to the East and is aware work will be done in this area. An easement should be dedicated by plat once this storm sewer facility is extended into the commercial tract. 9. The size of Line "D-2" has been shown on this exhibit as requested. STORM SEWER PLA~/PROFILE (LINES "D-2" & "D-2.1" 1. Much of Line "D-2" has been redesigned so that the hydraulic grade line is at least 1% feet below the pavement and to provide additional cover over the proposed storm sewer pipe. 2. The Droposed storm sewer system and inlets have been designed per City of Coppell criteria. 3. An easement is not needed at the downstream end of this system as it already exists. 4. Per our telephone conversation, a junction box has not been provided at the intersection of lateral "D-2.1" with "D-2". 5. The junction box has been identified at station 2+82.47 of Line "D-2". PAVING PLAN/PROFILE (WYNNPAGE DRIVE) 1. A note has been added regarding the construction of all inlets. PAVING PLAN/PROFILE ~HEATHRRWOOD DRIVE. WYNNPAGE DRIVEl 1. The median at the entrance to Wynnpage Drive will have a six inch curb and gutter. The landscape architect has provided information regarding the entry feature and landscaping of this median. Please see MESA Design Group's architectural plan (submitted by others). Mr. Gary Hendrix, P.E. September 27, 1991 Page Four 2. A note has been added regarding the contractor's compliance with the City's streetscape ordinance. PAVING PLAN (LEFT TURN LANE) 1. A note has been added regarding the streetscape plan. 2. The median noise, as well as the entrance to the subdivision, has been revised to show limits of brick pavers. The limits shown are per our telephone conversations. 3. Details of the DroDosed median are found in the Paving Detail sheets which were obtained from the City of Coppell. 4. A note has been added regarding the contractor's responsibility to provide and follow at Traffic Control Plan. If you have any questions, please feel free to call. I would appreciate it very much if we could schedule our preconstruction meeting as soon as possible. The Utility Contractor for this project will be Legend Construction and the Paving Contractor will be L.H. Lacy. A copy of their proposals has been included in this submittal so that the City inspection fee can be calculated. Please inform us at your earliest convenience as to what this fee is so that the developer can be notified. He is aware that this fee is due at the time of the preconstruction meeting. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bp xc: Mr. Jim Siepiela / Siepiela Interests, Inc. Mr. J. Waymon Levell / JWL Investments