Loading...
Wynnpage-CS 910925 The City With A Beautiful Future t_ ~'.." 214-462-0022 Mr. Jim Siepiela ~ : ~/ Siepiela Interests, Inc. . . ~' 5001LBJ Freeway, Suite 830 ,.~C~~ C Dallas, TX 75244 Re: Wynnpage Addition Dear Mr. Siepiela: We are enclosing a copy of the development fee assessment list related to this project, dated September 25, 1991. ---~ Please provide a check in the amount of $110,~]~7.6~ made payable to the City of Coppell and forward it, along, with a copy of the attached development fee list, to the attention or, Ms. Carolyn Bebermeyer, Finance Department. These fees must be paid on or before October 9, 1991. Please provide our office with a copy of your paid receipt. In addition, please provide our office with an itemized tabulation of the construction cost for this project for verification of the construction inspection fee. The construction inspection fee may be based on either the actual contract amount or on the engineer's estimate, with necessary adjustments in the fee being calculated at final acceptance of this project. If you have any questions, please contact Ben dela Cruz or me at (214) 393-1016. We appreciate your timely attention to this matter and look forward to working with you on this project. Sincerely, - Shohre Daneshmand, Acting City Engineer MSD/GCH/bd cc: Gary L. Sieb cc: Bebermeyer' Taryon Bowman Larry Davis Kevin Kendrick, P.E., Unzicker, Schnurbusch Steve Goram Associates KENDLTR CITY OF COPPELL DEVELOPMENT FEES Date: September 25, 1991 Project: Wynnpage PAYABLE BY TOTAL FEES 10/9/91 Park Fee Assessment $ 11,700 (78 lots X $150 Per Lot) (50% due at final plat approval) $ 5,850 (50% due prior to bldg. permits issuance Water Impact Fee $ 56,760 $ 56,760 (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ 7,800 (100% due prior to issuance of building permit) Wastewater Impact Fee $ 32,916 $ 32,916 (100% due prior to Council approval \. .'\ of final plat) ~...'-'~' ,.\ ~ .... Se~er Tap Inspection Fee $ 7,800 ,'\ .- ~ ,. (100% d~e prior to issuance of ' '~ '' building permit) Street Sign Assessment $ 1,997.57 $ 1,997.57 (see attached) Street Light Assessment ** ** ($292.60 X 13 poles) (see attached) Street Cut Permit $ 100.00 $ 100.00 + (2% of Construction COSt) in the amount of $629,705.06 provided by Unzicker, Schnurbusch Associates $ 12,594.10 $ 12,594.10 TOTAL AMOUNT DUE: $ 131,667.67 $110,217.67 PRIOR TO 10/9/91 $110,217.67 **NOTE: STREET LIGHT ASSESSMENT WILL BE CALCULATED BASED ON T.U. ELECTRIC'S LAYOUT PLAN. THIS PLAN HAS YET TO BE RECEIVED. KENDATT COPPELL PUBLIC WORF~ zg~o~Lz~gxm By:. Enginee~i'~g ,D~e Engineer TO: Shohre shmand, Acting City _~K~: Howard Pafford, Water Utilities Superintend P,~: Development Fees for Wynn Page The following fees should be assessed on the above referenced project. Water I~act 78 - 5/8" x 3/4" Domestic Meter/s = 78 ESU's - Irrigation Meterls = N/A - N/A Fireline Meter/s = N/A ESU's Total ~ ESU's ~ $660.00 ea = ~ .400.00 100% due prior to Council approval of final plat. Wastewater Za~mact Fee: 7--8- 5/8" x $/4" Domestic Meter/s = 78 ESU's ~ $422.00 = $32.916.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District %1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 78 Connections 6 $100.00 each = $7,800.00 100% due prior to issuance of building permit. Sewer Tap Inspection ~ee 78 Connections ~ $100.00 each = $7,800.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note= This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park ~ee 78 Residential Lots at $150.00 each = $11,700.00 N/A Units (Multi family) at $75.00 each = S 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc= Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Wynn Page The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 I8 $1,143.72 Yield $ 58.56 Stop $ 65.12 Street N~e $ 11.60 Stop & Street Combo $ 96.85 5 $ 484.25 OTHER Street Name Pole $ 57.72 2 S 115.44 Keep Right $ 63.54 2 $ 127.08 Relocate-Bases Only $ 11.I6 2 S 22.32 (Keep Right) or TOTAL 51,892.80 2 Keep Right $ 63.54 2 or ($1,997.57) (if signs currently do not exist) * Cost breakdowns may be obtained from Public Works by written request. WPAGE.HLP