Loading...
ST1501A-CS190116 Daily Field Report - Jan 16, 2019 KLF Project #: 20183887.001A byJames LongCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:Rambo Contr IncTime Start:12:30 PM Types of Tests/Observations Performed: Concrete Documents Referenced: Observations/Remarks: Arrived onsite as requested for daily activities. Met with contractor who provided locations and specifications for placement. Testing Performed concrete testing on one sample taken for 10+/- placement of inlet bottoms and walls on Freeport Parkway at stations 22+02.50,9+13.84 and 6+31.88. Sample taken from placement at station 22+02.50. Testing included slump, air content and temperature (ambient and mix). 54x8 test cylinders cast on sample for compression testing. Kleinfelder Representative Signature James Long Kleinfelder Representative Print Name 90582 Reviewed by: Cody Solvin on 1/22/2019 7:53:53 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063 Daily Field Report - Jan 17, 2019 KLF Project #: 20183887.001A byMike PerezCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:Time Start:01:00 PM Traveled mi. Types of Tests/Observations Performed: Sample Pick Up Compression Tests Documents Referenced: Observations/Remarks: Kleinfelder arrived on jobsite for cylinder pickup of one set of cylinders that were performed on 1-16-19 by James Long w/ Kleinfelder. Kleinfelder picked up set of cylinders and departed jobsite. Kleinfelder Representative Signature Mike Perez Kleinfelder Representative Print Name 90912 Reviewed by: Cody Solvin on 1/22/2019 7:53:53 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063 Daily Field Report - Jan 18, 2019 KLF Project #: 20183887.001A byMike PerezCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:TSCTime Start:03:00 PM Traveled mi. Types of Tests/Observations Performed: Concrete Documents Referenced: Observations/Remarks: Kleinfelder arrived on jobsite for concrete placement of inlet (walls). Kleinfelder sampled from 8 yd.concrete load. Kleinfelder performed test consisting of ambient temperature, concrete mix temperature, air content %, slump, and one set of five x8concrete cylinder mold samples. Test results were recorded on report. Workers placed concrete from truck through chute into forms of inlet (walls). Concrete was consolidated with a mechanical vibrator. Marcus w/ City of Coppell was notified of test results by Kleinfelder. Kleinfelder Representative Signature Mike Perez Kleinfelder Representative Print Name 91458 Reviewed by: Cody Solvin on 1/22/2019 7:53:53 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063 DFR #: 20183887.001A190119 CK Daily Field Report - Jan 20, 2019 DFR KLF Project #: 20183887.001A byColton KrumCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:Time Start:03:00 PM Traveled mi. Types of Tests/Observations Performed: Sample Pick Up Compression Tests Documents Referenced: Observations/Remarks: I was dispatched to pickup concrete cylinders. I gathered one set of 5(4x8) cylinders cast by MP on 01/18/19. These were dropped off and checked into the lab. Kleinfelder Representative Signature Colton Krum Kleinfelder Representative Print Name 91752 Reviewed by: Cody Solvin on 1/22/2019 7:53:53 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063 Daily Field Report - Jan 22, 2019 KLF Project #: 20183887.001A byShawn SturdyCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:RamboTime Start:01:45 PM Traveled mi. Types of Tests/Observations Performed: Concrete Documents Referenced: Plans and Specs Observations/Remarks: observed placement of concrete for the Inlet Base on NB Freeport Parkway, and cast on set of five 4x8 cylinders. The City Inspector was present for testing. Kleinfelder Representative Signature Shawn Sturdy Kleinfelder Representative Print Name 92343 Reviewed by: Joel Peters on 1/23/2019 2:14:52 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063