Loading...
Park West CC(17)-LR180624 (2) Daily Field Report - Jun 24, 2018 KLF Project #: 20181439.001A byMike PerezAstraZeneca: Fluor Coppell Site Exp Client:Fluor Enterprises, Inc. Contractor:FluorTime Start:08:45 AM Traveled mi. Types of Tests/Observations Performed: Soil / Density Testing Documents Referenced: Observations/Remarks: Kleinfelder arrived on job site for field density testing of water line at Lot 3R-1 Block 8. Kleinfelder performed six field density test at two locations of water line for trench backfill. All test results were compliant. Test results were recorded on report. Rafael Perello w/ Fluor was notified of test results by Kleinfelder. Acknowledged By SignatureKleinfelder Representative Signature FluorMike Perez Representing Company Company NameKleinfelder Representative Print Name Reviewed by: Joel Peters on 6/26/2018 2:29:54 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063