Park West CC(17)-LR180630
Daily Field Report - Jun 30, 2018 KLF Project #: 20181439.001A
byBilly SwinneyAstraZeneca: Fluor Coppell Site Exp
Client:Fluor Enterprises, Inc.
Contractor:Hill and WilkinsonTime Start:10:00 AM
Types of Tests/Observations Performed:
Concrete
Documents Referenced:
Observations/Remarks:
I arrived onsite to coordinate with Paulo (Hill and Wilkinson) for the concrete pour scheduled for the Northeast
firelane. The pour was placed with a new mix design by Redi-Mix. I performed air/slump testing and cast one
set of 6 (4x8) cylinders. I reported all field testing data to Paulo before leaving the project area
Acknowledged By SignatureKleinfelder Representative Signature
Fluorr (Jne Wilson)Billy Swinney
Representing Company Company NameKleinfelder Representative Print Name
Reviewed by: Joel Peters on 7/5/2018 2:55:32 AM CT
Page 1 of 1