Loading...
Park West CC(17)-LR180630 Daily Field Report - Jun 30, 2018 KLF Project #: 20181439.001A byBilly SwinneyAstraZeneca: Fluor Coppell Site Exp Client:Fluor Enterprises, Inc. Contractor:Hill and WilkinsonTime Start:10:00 AM Types of Tests/Observations Performed: Concrete Documents Referenced: Observations/Remarks: I arrived onsite to coordinate with Paulo (Hill and Wilkinson) for the concrete pour scheduled for the Northeast firelane. The pour was placed with a new mix design by Redi-Mix. I performed air/slump testing and cast one set of 6 (4x8) cylinders. I reported all field testing data to Paulo before leaving the project area Acknowledged By SignatureKleinfelder Representative Signature Fluorr (Jne Wilson)Billy Swinney Representing Company Company NameKleinfelder Representative Print Name Reviewed by: Joel Peters on 7/5/2018 2:55:32 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063