Loading...
Waterside P2-CS 920714 COPPELL PUBLIC WORKS DATE~ July 14, 1992 TO: Larry Davis, Construction Inspector~ FROM: Rey Gonzales, Streets SuperintendentS/ RE: Waterside Estates II Early Release Ail the punch list items have been addressed as noted except for one. The brick paver lug which was disturbed during the attempt to locate a valve stack was not replaced in its entirety, but instead, was underluged, routed and sealed. Staff reserves the right to require full replacement at any time during the maintenance bond time frame if failure in this area surfaces. The street sign can't be installed till such time that the finish grades at the intersections are completed. Please let me know when this is done. This subdivision will be subject to a complete walk thru once final acceptance of the entire project is imminent. RG/bc cc: Central File STWATERSI.RG