Loading...
Wynnpage-CS 910827 (2) FILE COPY TO: . Shohre Daneshmand, Acting City Engineer FROM: .~-~ Gary }{endricks, Consultant for Shimek, Jacobs & Finklea SUBJECT: Wynnpage Addition DATE: August 27, 1991 As you requested, I met with Kevin Kendrick of Unzicker, Schnurbusch Associates to discuss the storm drainage outfall structure and offsite channelization for the Wynnpage Addition. I asked Kevin to provide more detail of this area as follows: - Provide cross-sections of Alley "A" - Show the headwall on the storm sewer outfall channel section - Provide a grading plan of the outfall channel - Solid block sod is preferred to hydromulching as slope protection I explained that this additional detail is required to better describe this project to the adjacent property owners to the south. These comments should be reflected on the review set that is provided to Kendrick. GH/bd cc: Ben dela Cruz, Engineering Technician WYNNP