ST9801-CS000201COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 February 1, 2000 Robert D. Weber Ed Bell Construction P.O. Box 540787 Dallas, TX 75354-0787 RE: Coppell Road Reconstruction - ST9801 Dear Mr. Weber: This letter is intended to serve as a progress report for the Coppell Road Reconstruction project in the City of Coppell. Documented herein are several key dates with decisions that have been previously undocumented. Also included is a current tabulation of days used and current total of billed project charges, with explanations as needed. The Coppell Road Reconstruction project was begun on October 4, 1999 as per the meeting minutes dated September 27, 1999. This date was set to be ten days after the Notice to Proceed on September 22, 1999. The project length was bid at 240 days, which would end the project on May 30, 2000. As of February 1, 2000, 117 project days have been used (48.75% of project), leaving 123 days to complete the project. Ed Bell Construction delivered a letter on October 6, 1999 requesting that time be stopped due to water line supply problems. To date, sufficient documentation to support the supply problem has not been delivered. Hence, time was not stopped for the days following October 6, 1999. Ed Bell Construction submitted a letter on October 18, 1999 requesting that time be suspended due to legal issues regarding easements along the west side of Coppell Road. These issues were resolved on November 2, 1999. During the time that these issues were being resolved, sufficient work existed on the project to continue work. However, in a spirit of fairness, the City will grant Ed Bell Construction a stoppage of project time ~'om October 18, 1999 to November 2, 1999, a total of sixteen (16) days. These days will be added to the end of the project, thus giving a revised completion date of June 15, 2000. With this revised completion date, Ed Bell has used approximately 46% of the project time. Ed Bell Construction has submitted requests to the City requesting that time not be charged due to a lack of resolution regarding construction of the box culvert. Specifically, Ed Bell has disputed the method of box culvert construction required by the contract documents (maintaining two-way traffic). The City has been clear throughout the duration of this project that closing Coppell Road for the box culvert construction would not be an option. City Council denied a request to close the north-south portion of Coppell Road on January 25, 2000. It is, and has been, the responsibility of Ed Bell Construction to construct this box according to the contract. At any point in this project, Ed Bell Construction could have and should have commenced work on the box culvert under the terms of the contract. The City does not have control of the bidding of certain items in the contract, or how those items will be constructed. Ed Bell Construction asked that the City close the east-west portion of Coppell Road, extending from the northbound SH 121 frontage road to the main entrance to The Mansions apartments. The Coppell City Council approved closure of this portion of Coppell Road beginning in January, 2000 and lasting approximately eight months. Staff has made it clear that adequate advance notice is needed to inform residents and businesses in the area of the mad closure. This portion of the paving operation needs to be commenced at the earliest possible date. Finally, as of January 4, 2000 Ed Bell has billed The City for a total of $417,732.55 of project charges. The total project cost according to the contract documents is $2,000,949.75. Charges to date represent approximately 21% of the total contract. If you have any questions or concerns regarding this letter, please contact me at (972)304-7019. Respectfully, Kent M. Collins, P.E. Civil Engineer P.O. Box 478 255 Parkway Blvd ~1, TX 75019 Pho4~e: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET Phone: Pages: } [] Urgent/~or Review I'1 Please Comment [] Please Reply (including cover sheet) .Comments: IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679 Engineering- Excellence By Design P.O. Box 478 255 Parkway Blvd Coppell. TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET Phone: [] Urgent [] For Review From: Date: Pages: [] Please Comment (including cover sheet) [] Please Reply [] As Requested ,Comments: IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679 Engineering- Excellence By Design