Petterson (Encore)-LR181005
Alpha Testing, Inc.
2209 Wisconsin St.
Concrete Compression Test
Dallas, TX 75229
(972)620-8911
Report
TBPE Firm No. 813
RECH COPPELL, LLC10/05/2018
Tested For:Date Issued:
ATTN:MATT MILDREN
173166-448543-S1
Our Report #:
4145 TRAVIS STREET, SUITE 202
DALLAS, TX 75204
TODD SMITH
PM:
Fax Number:
PETTERSON ADDITION - ENCORE OF COPPELL
Project Desc:
NW CORNER OF SUMMER PLACE DR AND SANDY LAKE ROAD
FIELD DATA
PAVING: SUMMER PLACE DR.; SIDEWALK: SOUTH OF LEISURE LN. & SUMMER PLACE DR.
Placement Location:
SEE NOTES
Sample Location:
9/7/2018LMC
Date Placed:Concrete Supplier:
12:35 PM952
Time Placed:Plant Number:
63032562
ALPHADelivery Ticket No.:
Cast By:
11:49:00 AM
Batch Time:
Result
9139
Mix ID:
100
Concrete Temp (F):
Bimenyimana, Emmanuel
Submitted By:
5.0
Slump (ASTM C-143):
9/8/2018
Date Received:
4.1
(ASTM C-231)
Air Content:
ASTM C-31
Cured Specification:
88
Ambient Temp (F):
6000
Specified Strength:
N/A
Unit Weight:
CYLINDER COMPRESSION TEST RESULTS
LabCureBreakCapDateAgeAvg.Avg.Avg Depth/Area:Max
PSI:
No.:Type:Type:Spec:Tested:(Days):LengthWidthDiameterSq. In.Load:
459/10/2018312.56747805950
LAB2C-12318N/A4
46LAB3C-123110/5/2018288N/A412.56936607460
47LAB3C-123110/5/2018288N/A412.56991407890
48LAB2C-123110/5/2018288N/A412.56902407180
Average 28-day Compressive Strength is compliant with project specifications
7510
72'S & 5'W FROM SE CORNER OF LEISURE LN. & SUMMER PLACE DR.
Notes:
PMB Capital Investments, Clay Moore Engineering, City of Coppell, City of Coppell
CC:
Respectfully Submitted By:__________________________________________________________ of Alpha Testing, Inc.
Break Types: 1: Cone 2: Cone and Split 3: Cone and Shear 4: Shear 5: Columnar * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM
C39.
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting334011