Loading...
Wynnpage-BD 910820 unzicker · schnurbusch · associates · inc. civil en neers · surveyors · planners dallas, texas ~524~ -~ ~ ~ ~ ~ ~ August 20, 1991 (21¢) 654-55oo Austin Paving Company L.H. Lacy Company By: Engineering Mario Sinacola & Sons Excavating, Inc. Glenn Thurman, Inc. Site Concrete XIT Paving & Construction, Inc. Re: Wynnpage Estates - Coppell, Texas Paving Bids 89011-0 Gentlemen: You are invited to submit a proposal for construction of pavement facilities in the subject addition. All labor and materials necessary to complete the work indicated on the enclosed engineering plans per City of Coppell Standards and Specifications, should be included in unit prices. The Owner reserves the right to reject any or all bids and waive formalities in the bidding procedure. Bids will be received until 3:00 p.m. Tuesday, August 27, 1991 and should be addressed to: WYNNPAGE ESTATES, LTD. c/o Unzicker, Schnurbusch & Associates 8700 Stemmons Freeway, Suite 400 · Dallas, Texas 75247 Attached is a copy of our estimate of the bid quantities. All work is to be constructed under Contract with the Owner per Contract Documents provided by them. Construction staking and grade verification will be provided by the Owner through Unzicker, Schnurbusch & Associates, Inc. The Owner reserves the right to backcharge the Contractor for excessive retesting, restaking and/or reverification. Include in your proposal as separate line items the cost of payment and performance bonds to the Owner as well as the required maintenance bond to the City of Coppell. Bids will not be taken unless a time of construction has been included (in working days). Sincerely, Kevin Ray Kendrick, P.E. Project Manager KRK/bp xc: Mr. Waymon Levell / WYNNPAGE ESTATES, LTD. Mr. Jim Siepiela / Siepiela Interests, Inc. Mr. Larry Davis / City of Coppell PAUL 5. UNZICKER. P.E. DAVID M. SCHNURBUSCH. P.E. PRESIDENT VICE-PRESIDENT BID QUANTITIES WYNNPAGE ESTATES CITY OF COPPELL WYNNPAGE ESTATES, LTD. AUGUST 20, 1991 PAVING * 12,605 S.Y. 6" 3000 psi Reinf. Conc. Street Pavement w/Curbs, Subdivision (East side of tract at Denton Tap Road) 205 S.Y. Pavestone "Streetscape" at Entrance to Subdivision off Denton Tap Road 6,110 S.Y. 6"-4"-6" 3600'psi Reinf. Conc. Alley Pavement 13,720 S.Y. Lime Stabilized Subgrade 185 TONS Hydrated Lime (27 lb/S.Y.) 27 L.F. Standard Street Header 27 L.F. Guard Fence w/Reflective 3M Tape 1 L.S. Construct Left Turn Lane, Denton Tap Road (Includes Sawcut, Remove, Replace Concrete Curbs & Gutter, 8" Reinforced Concrete Pavement, Buttons, Painting, Relocation of Trees, Irrigation, Existing Utilities, Etc.) 1 L.S. Sawcut, Remove and Connect Existing Drive to Proposed Alley 1 L.S. Concrete/Lime Subgrade/Materials Testing & Series 1 L.S. Payment & Performance Bond and Maintenance Bond to City of Coppell * Bid items to include all necessary fees, as well as, labor, superintendence, equipment, tools, materials, backfill, compaction, and other means of construction required for installation of items (complete in place) per City of Coppell Standards and Specifications. Traffic control to be provided and maintained by Contractor throughout construction at his expense. Laydown curbs at all street intersections to be included in paving unit prices including special sidewalk at entrance to subdivision ("Streetscape" Plan). ** The scheduled date to begin paving construction on this site is October 15, 1991. Please include in your bid your compliance with this start date and your estimated completion date.